X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-075-20206"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-075-20206
 
| Well ID: 34-075-20206
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.664227978, -82.05069051 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.66, -82.05 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 11: Line 11:
 
| County: [[Holmes_County,_Ohio|Holmes]]
 
| County: [[Holmes_County,_Ohio|Holmes]]
 
|-
 
|-
| Municipality: [[Ripley Township,_Holmes_County,_Ohio|Ripley Township]]
+
| Municipality: [[Ripley_Township,_Holmes_County,_Ohio|Ripley Township]]
 
|-
 
|-
 
| Operator Name: [[MASON PRODUCING INC]]
 
| Operator Name: [[MASON PRODUCING INC]]
Line 29: Line 29:
 
| Final Drill Date: 1976-06-05
 
| Final Drill Date: 1976-06-05
 
|-
 
|-
| Well Total Depth: 3243 ft
+
| Well Total Depth: 3243.00 ft
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Latitude: 40.664227978
+
| Latitude: 40.660000
 
|-
 
|-
| Longitude: -82.05069051
+
| Longitude: -82.050000
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
 
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Well History ==
 
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 81: Line 81:
 
  | title = Risk Based Data Management System - Well and WellHistry Tables
 
  | title = Risk Based Data Management System - Well and WellHistry Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Perforation Treatments ==
 
== Perforation Treatments ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 92: Line 92:
 
|-
 
|-
 
| 1998-08-04
 
| 1998-08-04
 +
| style="text-align: right;" | 3155
 +
| style="text-align: right;" | 3213
 +
| style="text-align: right;" | 23
 +
|-
 +
|
 +
| style="text-align: right;" | 3155
 +
| style="text-align: right;" | 3213
 +
| style="text-align: right;" | 23
 +
|-
 +
|
 
| style="text-align: right;" | 3155
 
| style="text-align: right;" | 3155
 
| style="text-align: right;" | 3213
 
| style="text-align: right;" | 3213
Line 100: Line 110:
 
  | title = Risk Based Data Management System - Perfs Table
 
  | title = Risk Based Data Management System - Perfs Table
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 157: Line 167:
 
  | title = Risk Based Data Management System - tblStimulation Table
 
  | title = Risk Based Data Management System - tblStimulation Table
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 170: Line 180:
 
| 1984
 
| 1984
 
| [[MASON JOHN C]]
 
| [[MASON JOHN C]]
| style="text-align: right;" | 9428
+
| style="text-align: right;" | 9428.00
| style="text-align: right;" | 267
+
| style="text-align: right;" | 267.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1985
 
| 1985
 
| [[MASON JOHN C]]
 
| [[MASON JOHN C]]
| style="text-align: right;" | 5541
+
| style="text-align: right;" | 5541.00
| style="text-align: right;" | 269
+
| style="text-align: right;" | 269.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1986
 
| 1986
 
| [[MASON DRILLING INC]]
 
| [[MASON DRILLING INC]]
| style="text-align: right;" | 3333
+
| style="text-align: right;" | 3333.00
| style="text-align: right;" | 153
+
| style="text-align: right;" | 153.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1987
 
| 1987
 
| [[MASON DRILLING INC]]
 
| [[MASON DRILLING INC]]
| style="text-align: right;" | 3476
+
| style="text-align: right;" | 3476.00
| style="text-align: right;" | 192
+
| style="text-align: right;" | 192.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1988
 
| 1988
 
| [[MASON DRILLING INC]]
 
| [[MASON DRILLING INC]]
| style="text-align: right;" | 3120
+
| style="text-align: right;" | 3120.00
| style="text-align: right;" | 752
+
| style="text-align: right;" | 752.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1989
 
| 1989
 
| [[MASON DRILLING INC]]
 
| [[MASON DRILLING INC]]
| style="text-align: right;" | 8661
+
| style="text-align: right;" | 8661.00
| style="text-align: right;" | 1927
+
| style="text-align: right;" | 1927.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1990
 
| 1990
 
| [[MASON DRILLING INC]]
 
| [[MASON DRILLING INC]]
| style="text-align: right;" | 7624
+
| style="text-align: right;" | 7624.00
| style="text-align: right;" | 1120
+
| style="text-align: right;" | 1120.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1991
 
| 1991
 
| [[MASON DRILLING INC]]
 
| [[MASON DRILLING INC]]
| style="text-align: right;" | 16477
+
| style="text-align: right;" | 16477.00
| style="text-align: right;" | 1901
+
| style="text-align: right;" | 1901.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1992
 
| 1992
 
| [[MASON DRILLING INC]]
 
| [[MASON DRILLING INC]]
| style="text-align: right;" | 6594
+
| style="text-align: right;" | 6594.00
| style="text-align: right;" | 631
+
| style="text-align: right;" | 631.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1993
 
| 1993
 
| [[MASON DRILLING INC]]
 
| [[MASON DRILLING INC]]
| style="text-align: right;" | 4600
+
| style="text-align: right;" | 4600.00
| style="text-align: right;" | 487
+
| style="text-align: right;" | 487.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1994
 
| 1994
 
| [[MASON DRILLING INC]]
 
| [[MASON DRILLING INC]]
| style="text-align: right;" | 4068
+
| style="text-align: right;" | 4068.00
| style="text-align: right;" | 437
+
| style="text-align: right;" | 437.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1995
 
| 1995
 
| [[MASON DRILLING INC]]
 
| [[MASON DRILLING INC]]
| style="text-align: right;" | 2869
+
| style="text-align: right;" | 2869.00
| style="text-align: right;" | 347
+
| style="text-align: right;" | 347.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1996
 
| 1996
 
| [[MASON DRILLING INC]]
 
| [[MASON DRILLING INC]]
| style="text-align: right;" | 320
+
| style="text-align: right;" | 320.00
| style="text-align: right;" | 213
+
| style="text-align: right;" | 213.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1997
 
| 1997
 
| [[MASON DRILLING INC]]
 
| [[MASON DRILLING INC]]
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | 334
+
| style="text-align: right;" | 334.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1998
 
| 1998
 
| [[MASON DRILLING INC]]
 
| [[MASON DRILLING INC]]
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | 212
+
| style="text-align: right;" | 212.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1999
 
| 1999
 
| [[MASON DRILLING INC]]
 
| [[MASON DRILLING INC]]
| style="text-align: right;" | 88
+
| style="text-align: right;" | 88.00
| style="text-align: right;" | 215
+
| style="text-align: right;" | 215.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2000
 
| 2000
 
| [[MASON DRILLING INC]]
 
| [[MASON DRILLING INC]]
| style="text-align: right;" | 162
+
| style="text-align: right;" | 162.00
| style="text-align: right;" | 207
+
| style="text-align: right;" | 207.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001
 
| 2001
 
| [[MASON DRILLING INC]]
 
| [[MASON DRILLING INC]]
| style="text-align: right;" | 441
+
| style="text-align: right;" | 441.00
| style="text-align: right;" | 179
+
| style="text-align: right;" | 179.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2002
 
| 2002
 
| [[MASON PRODUCING INC]]
 
| [[MASON PRODUCING INC]]
| style="text-align: right;" | 22
+
| style="text-align: right;" | 22.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 31
 
| style="text-align: right;" | 31
 
|-
 
|-
 
| 2003
 
| 2003
 
| [[MASON DRILLING INC]]
 
| [[MASON DRILLING INC]]
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2004
 
| 2004
 
| [[MASON PRODUCING INC]]
 
| [[MASON PRODUCING INC]]
| style="text-align: right;" | 310
+
| style="text-align: right;" | 310.00
| style="text-align: right;" | 143
+
| style="text-align: right;" | 143.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2005
 
| 2005
 
| [[MASON PRODUCING INC]]
 
| [[MASON PRODUCING INC]]
| style="text-align: right;" | 188
+
| style="text-align: right;" | 188.00
| style="text-align: right;" | 228
+
| style="text-align: right;" | 228.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2006
 
| 2006
 
| [[MASON PRODUCING INC]]
 
| [[MASON PRODUCING INC]]
| style="text-align: right;" | 363
+
| style="text-align: right;" | 363.00
| style="text-align: right;" | 170
+
| style="text-align: right;" | 170.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2007
 
| 2007
 
| [[MASON PRODUCING INC]]
 
| [[MASON PRODUCING INC]]
| style="text-align: right;" | 433
+
| style="text-align: right;" | 433.00
| style="text-align: right;" | 164
+
| style="text-align: right;" | 164.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2008
 
| 2008
 
| [[MASON PRODUCING INC]]
 
| [[MASON PRODUCING INC]]
| style="text-align: right;" | 380
+
| style="text-align: right;" | 380.00
| style="text-align: right;" | 149
+
| style="text-align: right;" | 149.00
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
|-
 
|-
 
| 2009
 
| 2009
 
| [[MASON PRODUCING INC]]
 
| [[MASON PRODUCING INC]]
| style="text-align: right;" | 395
+
| style="text-align: right;" | 395.00
| style="text-align: right;" | 124
+
| style="text-align: right;" | 124.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2010
 
| 2010
 
| [[MASON PRODUCING INC]]
 
| [[MASON PRODUCING INC]]
| style="text-align: right;" | 422
+
| style="text-align: right;" | 422.00
| style="text-align: right;" | 124
+
| style="text-align: right;" | 124.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2011
 
| 2011
 
| [[MASON PRODUCING INC]]
 
| [[MASON PRODUCING INC]]
| style="text-align: right;" | 409
+
| style="text-align: right;" | 409.00
| style="text-align: right;" | 125
+
| style="text-align: right;" | 125.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[MASON PRODUCING INC]]
 
| [[MASON PRODUCING INC]]
| style="text-align: right;" | 386
+
| style="text-align: right;" | 386.00
| style="text-align: right;" | 118
+
| style="text-align: right;" | 118.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[MASON PRODUCING INC]]
 
| [[MASON PRODUCING INC]]
| style="text-align: right;" | 378
+
| style="text-align: right;" | 378.00
| style="text-align: right;" | 122
+
| style="text-align: right;" | 122.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[MASON PRODUCING INC]]
 
| [[MASON PRODUCING INC]]
| style="text-align: right;" | 394
+
| style="text-align: right;" | 394.00
| style="text-align: right;" | 97
+
| style="text-align: right;" | 97.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2015
 
| 2015
 
| [[MASON PRODUCING INC]]
 
| [[MASON PRODUCING INC]]
| style="text-align: right;" | 449
+
| style="text-align: right;" | 449.00
| style="text-align: right;" | 97
+
| style="text-align: right;" | 97.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[MASON PRODUCING INC]]
 
| [[MASON PRODUCING INC]]
| style="text-align: right;" | 698
+
| style="text-align: right;" | 698.00
| style="text-align: right;" | 144
+
| style="text-align: right;" | 144.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[MASON PRODUCING INC]]
 
| [[MASON PRODUCING INC]]
| style="text-align: right;" | 656
+
| style="text-align: right;" | 656.00
| style="text-align: right;" | 181
+
| style="text-align: right;" | 181.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[MASON PRODUCING INC]]
 
| [[MASON PRODUCING INC]]
| style="text-align: right;" | 513
+
| style="text-align: right;" | 513.00
| style="text-align: right;" | 143
+
| style="text-align: right;" | 143.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
Line 382: Line 392:
 
  | title = Risk Based Data Management System - Production Table - Oil and Gas Data
 
  | title = Risk Based Data Management System - Production Table - Oil and Gas Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<ref>{{cite web
 
<ref>{{cite web
 
  | title = Combined Production - Oil and Gas Data
 
  | title = Combined Production - Oil and Gas Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable"
 
{| class="wikitable sortable"
Line 613: Line 623:
 
  | title = Risk Based Data Management System - Production Table - Brine Data
 
  | title = Risk Based Data Management System - Production Table - Brine Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<ref>{{cite web
 
<ref>{{cite web
 
  | title = Combined Production - Brine Data
 
  | title = Combined Production - Brine Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
==== Inspections Performed ====
 
==== Inspections Performed ====
Line 630: Line 640:
 
!scope="col" style="text-align: center"| Inspection Result
 
!scope="col" style="text-align: center"| Inspection Result
 
!scope="col" style="text-align: center"| Inspection Comments
 
!scope="col" style="text-align: center"| Inspection Comments
 +
|-
 +
| -1809223321
 +
| 2017-10-27 0:00
 +
| PW
 +
| No Violations
 +
|
 +
|-
 +
| -1969129039
 +
| 2014-4-17 0:00:
 +
| PW
 +
| No Violations
 +
|
 +
|-
 +
| -509515145
 +
| 2016-4-26 0:00:
 +
| PW
 +
| No Violations
 +
|
 +
|-
 +
| -920223305
 +
| 2015-5-21 0:00:
 +
| PW
 +
| No Violations
 +
|
 
|-
 
|-
 
| 0000013269
 
| 0000013269
Line 654: Line 688:
 
| No Violations
 
| No Violations
 
| On the day of my inspection I found an 8 5/8 inch diameter casing, a 4 1/2 inch diameter casing, a 2 3/8 inch diameter tubing and rods operated by a pumping unit with an electric motor. The production equipment is made up of two 100 bbl. steel tanks, a vertical separator. The tank is properly identified, and the production reporting is up to date.  The production equipment is shared with other wells.
 
| On the day of my inspection I found an 8 5/8 inch diameter casing, a 4 1/2 inch diameter casing, a 2 3/8 inch diameter tubing and rods operated by a pumping unit with an electric motor. The production equipment is made up of two 100 bbl. steel tanks, a vertical separator. The tank is properly identified, and the production reporting is up to date.  The production equipment is shared with other wells.
 +
|-
 +
| 13269
 +
|
 +
| PL
 +
| No Violations
 +
|
 
|-
 
|-
 
| 1725250042
 
| 1725250042
Line 660: Line 700:
 
| No Violations
 
| No Violations
 
| This is a producing pump jack  well.  There were no problems noted at the time of the inspection.
 
| This is a producing pump jack  well.  There were no problems noted at the time of the inspection.
 +
|-
 +
| 1757143595
 +
| 2019-8-27 0:00:
 +
| PW
 +
| No Violations
 +
|
 
|-
 
|-
 
| 1809223321
 
| 1809223321
Line 692: Line 738:
 
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Ohio Wells]]
 
[[Category:Ohio Wells]]

Latest revision as of 12:44, 12 January 2021

Well Details

Well ID: 34-075-20206
Loading map...
Country: United States
State: Ohio
County: Holmes
Municipality: Ripley Township
Operator Name: MASON PRODUCING INC
Well Pad ID:
Farm/Lease Name: LEVERE FAYE & LEVERS DANIEL
License Status: Producing
License Date: 1976-04-12
Spud Date: 1976-05-06
Spud Drilling Contractor: CO TOOLS
Final Drill Date: 1976-06-05
Well Total Depth: 3243.00 ft
Configuration: Vertical
Latitude: 40.660000
Longitude: -82.050000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1976-04-12 1983 MASON DRILLING INC GeoDate 4/12/76
Original Spud 1976-05-06 ORIGINALLY DRILLED & PLUGGED IN 1946 BY OFG. RE-OPEN 4-14-76, GL=1052.9 REOPENED INFORMATION ON BACK OF CARD
Completed 1976-06-05 ORIGINALLY DRILLED & PLUGGED IN 1946 BY OFG. RE-OPEN 4-14-76, GL=1052.9 REOPENED INFORMATION ON BACK OF CARD
Reached Total Depth 1976-06-05 ORIGINALLY DRILLED & PLUGGED IN 1946 BY OFG. RE-OPEN 4-14-76, GL=1052.9 REOPENED INFORMATION ON BACK OF CARD
Completion Report Received 1976-06-14 ORIGINALLY DRILLED & PLUGGED IN 1946 BY OFG. RE-OPEN 4-14-76, GL=1052.9 REOPENED INFORMATION ON BACK OF CARD
Change of Owner 2002-12-30 Operator changed from 1983, MASON DRILLING INC to 7333, MASON PRODUCING
Record Last Modified 2017-02-15 ORIGINALLY DRILLED & PLUGGED IN 1946 BY OFG. RE-OPEN 4-14-76, GL=1052.9 REOPENED INFORMATION ON BACK OF CARD

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1998-08-04 3155 3213 23
3155 3213 23
3155 3213 23

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 2000 Bbl 50000
H2O 0 4000 Bbl 20000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1984 MASON JOHN C 9428.00 267.00 0
1985 MASON JOHN C 5541.00 269.00 365
1986 MASON DRILLING INC 3333.00 153.00 365
1987 MASON DRILLING INC 3476.00 192.00 365
1988 MASON DRILLING INC 3120.00 752.00 365
1989 MASON DRILLING INC 8661.00 1927.00 365
1990 MASON DRILLING INC 7624.00 1120.00 365
1991 MASON DRILLING INC 16477.00 1901.00 365
1992 MASON DRILLING INC 6594.00 631.00 365
1993 MASON DRILLING INC 4600.00 487.00 365
1994 MASON DRILLING INC 4068.00 437.00 365
1995 MASON DRILLING INC 2869.00 347.00 365
1996 MASON DRILLING INC 320.00 213.00 365
1997 MASON DRILLING INC 0.00 334.00 365
1998 MASON DRILLING INC 0.00 212.00 365
1999 MASON DRILLING INC 88.00 215.00 365
2000 MASON DRILLING INC 162.00 207.00 0
2001 MASON DRILLING INC 441.00 179.00 365
2002 MASON PRODUCING INC 22.00 0.00 31
2003 MASON DRILLING INC 0.00 0.00 365
2004 MASON PRODUCING INC 310.00 143.00 365
2005 MASON PRODUCING INC 188.00 228.00 365
2006 MASON PRODUCING INC 363.00 170.00 365
2007 MASON PRODUCING INC 433.00 164.00 365
2008 MASON PRODUCING INC 380.00 149.00 366
2009 MASON PRODUCING INC 395.00 124.00 365
2010 MASON PRODUCING INC 422.00 124.00 365
2011 MASON PRODUCING INC 409.00 125.00 365
2012 MASON PRODUCING INC 386.00 118.00 365
2013 MASON PRODUCING INC 378.00 122.00 365
2014 MASON PRODUCING INC 394.00 97.00 365
2015 MASON PRODUCING INC 449.00 97.00 365
2016 MASON PRODUCING INC 698.00 144.00 365
2017 MASON PRODUCING INC 656.00 181.00 365
2018 MASON PRODUCING INC 513.00 143.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1984 MASON JOHN C Brine 0 0
1985 MASON JOHN C Brine 10 365
1986 MASON DRILLING INC Brine 9 365
1987 MASON DRILLING INC Brine 6 365
1988 MASON DRILLING INC Brine 19 365
1989 MASON DRILLING INC Brine 28 365
1990 MASON DRILLING INC Brine 9 365
1991 MASON DRILLING INC Brine 23 365
1992 MASON DRILLING INC Brine 10 365
1993 MASON DRILLING INC Brine 4 365
1994 MASON DRILLING INC Brine 10 365
1995 MASON DRILLING INC Brine 1 365
1996 MASON DRILLING INC Brine 1 365
1997 MASON DRILLING INC Brine 0 365
1998 MASON DRILLING INC Brine 0 365
1999 MASON DRILLING INC Brine 1 365
2000 MASON DRILLING INC Brine 2
2001 MASON DRILLING INC Brine 0 365
2002 MASON DRILLING INC Brine 37 334
2003 MASON DRILLING INC Brine 0 365
2004 MASON PRODUCING INC Brine 0 365
2005 MASON PRODUCING INC Brine 4 365
2006 MASON PRODUCING INC Brine 0 365
2007 MASON PRODUCING INC Brine 0 365
2008 MASON PRODUCING INC Brine 0 366
2009 MASON PRODUCING INC Brine 0 365
2010 MASON PRODUCING INC Brine 0 365
2011 MASON PRODUCING INC Brine 0 365
2012 MASON PRODUCING INC Brine 0 365
2013 MASON PRODUCING INC Brine 0 365
2014 MASON PRODUCING INC Brine 10 365
2015 MASON PRODUCING INC Brine 0 365
2016 MASON PRODUCING INC Brine 16 365
2017 MASON PRODUCING INC Brine 10 365
2018 MASON PRODUCING INC Brine 8 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1809223321 2017-10-27 0:00 PW No Violations
-1969129039 2014-4-17 0:00: PW No Violations
-509515145 2016-4-26 0:00: PW No Violations
-920223305 2015-5-21 0:00: PW No Violations
0000013269 Preliminary Restoration No Violations PASSED Y WITNESSED 6/8/92 INSPECTOR JOHN BUREN DATE 06/0819/92 DATA FROM OLD VAX INFO
0509515145 2016-04-26 Production Wells No Violations This is a producing pump jack well. There were no problems noted at the time of the inspection.
0920223305 2015-05-21 Production Wells No Violations This is a producing pump jack well. There were no problems noted at the time of the inspection.
1117570749 2019-04-08 Production Wells No Violations On the day of my inspection I found an 8 5/8 inch diameter casing, a 4 1/2 inch diameter casing, a 2 3/8 inch diameter tubing and rods operated by a pumping unit with an electric motor. The production equipment is made up of two 100 bbl. steel tanks, a vertical separator. The tank is properly identified, and the production reporting is up to date. The production equipment is shared with other wells.
13269 PL No Violations
1725250042 2017-04-13 Production Wells No Violations This is a producing pump jack well. There were no problems noted at the time of the inspection.
1757143595 2019-8-27 0:00: PW No Violations
1809223321 2017-10-27 Production Wells No Violations On the day of my inspection I found an 8 5/8 inch diameter casing, a 4 1/2 inch diameter casing, a 2 3/8 inch diameter tubing and rods operated by a pumping unit with an electric motor. The production equipment is made up of two 100 bbl. steel tanks, a vertical separator. The tank is properly identified, and the production reporting is up to date. The production equipment is shared with other wells.
1938171696 2012-08-03 Production Wells No Violations This well is in production and is equipped with a pumping unit. There were no problems noted at the time of the inspection.
1969129039 2014-04-17 Production Wells No Violations This is a producing pump jack well. There were no problems noted at the time of the inspection.

For data sources see[9]

References