If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 0534150401002 | | Well ID: 0534150401002 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="21" | {{#display_map: 53.545186, -112.145258 | width=100% | height=100% }} |
|- | |- | ||
| Location: 00/01-04-053-15W4/2 | | Location: 00/01-04-053-15W4/2 | ||
Line 10: | Line 10: | ||
|- | |- | ||
| Location Alias 2: 00/01-04-053-15 W4/02 | | Location Alias 2: 00/01-04-053-15 W4/02 | ||
+ | |- | ||
+ | | Country: Canada | ||
|- | |- | ||
| Province: Alberta | | Province: Alberta | ||
+ | |- | ||
+ | | Township: 053 | ||
+ | |- | ||
+ | | Meridian: 4 | ||
+ | |- | ||
+ | | Range: 15 | ||
+ | |- | ||
+ | | Section: 04 | ||
|- | |- | ||
| County/Municipality: [[County of Minburn No. 27,_Alberta|County of Minburn No. 27]] | | County/Municipality: [[County of Minburn No. 27,_Alberta|County of Minburn No. 27]] | ||
Line 17: | Line 27: | ||
| Well Name: CALPINE ROYAL 1-4-53-15 | | Well Name: CALPINE ROYAL 1-4-53-15 | ||
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[Calpine Canada Resources Company]] |
|- | |- | ||
| License Number: 0085218 | | License Number: 0085218 | ||
Line 29: | Line 39: | ||
| Final Drill Date: 1980-09-06 | | Final Drill Date: 1980-09-06 | ||
|- | |- | ||
− | | Well Total Depth: 812 m | + | | Well Total Depth: 812.00 m |
|- | |- | ||
| Surface Hole Latitude: 53.545186 | | Surface Hole Latitude: 53.545186 | ||
Line 38: | Line 48: | ||
| title = General Well Data File - Licensing Data | | title = General Well Data File - Licensing Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref><ref>{{cite web |
| title = General Well Data File - Drilling Data | | title = General Well Data File - Drilling Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 1909-09-09 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1980-08-26 | ||
+ | | Obtained License | ||
+ | |- | ||
+ | | 1980-09-05 | ||
+ | | Drill Stem Test Performed | ||
+ | |- | ||
+ | | 1980-09-06 | ||
+ | | Finished Drilling | ||
+ | |- | ||
+ | | 1980-09-07 | ||
+ | | Drill Stem Test Performed | ||
+ | |- | ||
+ | | 1980-09-08 | ||
+ | | Drill Stem Test Performed | ||
+ | |- | ||
+ | | 1980-09-08 | ||
+ | | Production Casing Operation Performed | ||
+ | |- | ||
+ | | 1980-10-19 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1980-10-21 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1980-11-23 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1980-11-28 | ||
+ | | Well Mode changed to Drilled and Cased | ||
+ | |- | ||
+ | | 1981-08-15 | ||
+ | | Well Began Production | ||
+ | |- | ||
+ | | 1981-08-15 | ||
+ | | Well Fluid changed to Gas | ||
+ | |- | ||
+ | | 1981-08-15 | ||
+ | | Well Mode changed to Flowing | ||
+ | |- | ||
+ | | 1982-06-16 | ||
+ | | Perforation Treatment Performed - Cement Plug | ||
+ | |- | ||
+ | | 1982-06-17 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1982-06-17 | ||
+ | | Well Fluid changed to Gas | ||
+ | |- | ||
+ | | 1982-06-17 | ||
+ | | Well Mode changed to Abandoned Zone | ||
+ | |- | ||
+ | | 1985-02-08 | ||
+ | | Perforation Treatment Performed - Fractured | ||
+ | |- | ||
+ | | 1992-09-14 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 1992-09-14 | ||
+ | | Plug Back Performed | ||
+ | |- | ||
+ | | 1992-09-14 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1992-10-09 | ||
+ | | Well Abandoned | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-04-29 }}</ref> | ||
<!--== Spud Table == | <!--== Spud Table == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 74: | Line 165: | ||
| 1980-10-19 | | 1980-10-19 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 782. | + | | style="text-align: right;" | 782.60 |
− | | style="text-align: right;" | 784. | + | | style="text-align: right;" | 784.60 |
| style="text-align: right;" | 7 | | style="text-align: right;" | 7 | ||
|- | |- | ||
| 1980-10-21 | | 1980-10-21 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 782. | + | | style="text-align: right;" | 782.60 |
− | | style="text-align: right;" | 784. | + | | style="text-align: right;" | 784.60 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1980-11-23 | | 1980-11-23 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 742 | + | | style="text-align: right;" | 742.00 |
− | | style="text-align: right;" | 744 | + | | style="text-align: right;" | 744.00 |
| style="text-align: right;" | 7 | | style="text-align: right;" | 7 | ||
|- | |- | ||
| 1982-06-16 | | 1982-06-16 | ||
− | | Cement Plug | + | | Cement Plug |
− | | style="text-align: right;" | 704. | + | | style="text-align: right;" | 704.60 |
− | | style="text-align: right;" | 780 | + | | style="text-align: right;" | 780.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1982-06-17 | | 1982-06-17 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 600. | + | | style="text-align: right;" | 600.10 |
− | | style="text-align: right;" | 602. | + | | style="text-align: right;" | 602.10 |
| style="text-align: right;" | 10 | | style="text-align: right;" | 10 | ||
|- | |- | ||
| 1982-06-17 | | 1982-06-17 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 609. | + | | style="text-align: right;" | 609.10 |
− | | style="text-align: right;" | 611. | + | | style="text-align: right;" | 611.10 |
| style="text-align: right;" | 10 | | style="text-align: right;" | 10 | ||
|- | |- | ||
| 1985-02-08 | | 1985-02-08 | ||
− | | Fracture | + | | Fracture |
− | | style="text-align: right;" | 600. | + | | style="text-align: right;" | 600.10 |
− | | style="text-align: right;" | 611. | + | | style="text-align: right;" | 611.10 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1992-09-14 | | 1992-09-14 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 585 | + | | style="text-align: right;" | 585.00 |
− | | style="text-align: right;" | 593 | + | | style="text-align: right;" | 593.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
Line 124: | Line 215: | ||
| title = General Well Data File - Tour-Perforation/Treatment Data | | title = General Well Data File - Tour-Perforation/Treatment Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
<!--== Fracking Activities == | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | Start Date | + | !scope="col" | Job Number |
− | !scope="col" | End Date | + | !scope="col" | Job Start Date |
− | !scope="col" | | + | !scope="col" | Job End Date |
− | !scope="col" | + | !scope="col" | True Vertical Depth (ft) |
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
!scope="col" | Purpose | !scope="col" | Purpose | ||
− | !scope="col" | + | !scope="col" | Ingredient Name |
− | !scope="col" | | + | !scope="col" | CAS Number |
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
|}--> | |}--> | ||
Line 157: | Line 262: | ||
| 1981 | | 1981 | ||
| style="text-align: right;" | 2921 | | style="text-align: right;" | 2921 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.0 |
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
Line 163: | Line 268: | ||
| 1982 | | 1982 | ||
| style="text-align: right;" | 2012 | | style="text-align: right;" | 2012 | ||
− | |||
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.0 |
+ | | style="text-align: right;" | 0.0 | ||
|- | |- | ||
|} | |} | ||
Line 171: | Line 276: | ||
| title = Well Production Data - All Alberta | | title = Well Production Data - All Alberta | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-25 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
<!--== Occurences == | <!--== Occurences == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 186: | Line 291: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0534150401002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.545186,"lon":-112.145258,"icon":""}]} |
Location: 00/01-04-053-15W4/2 | |
Location Alias: 00/01-04-53-15 W4M | |
Location Alias 2: 00/01-04-053-15 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 053 | |
Meridian: 4 | |
Range: 15 | |
Section: 04 | |
County/Municipality: County of Minburn No. 27 | |
Well Name: CALPINE ROYAL 1-4-53-15 | |
Operator Name: Calpine Canada Resources Company | |
License Number: 0085218 | |
License Date: 1980-08-26 | |
License Status: RecCertified | |
Spud Date: 1980-09-03 | |
Final Drill Date: 1980-09-06 | |
Well Total Depth: 812.00 m | |
Surface Hole Latitude: 53.545186 | |
Surface Hole Longitude: -112.145258 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-08-26 | Obtained License |
1980-09-05 | Drill Stem Test Performed |
1980-09-06 | Finished Drilling |
1980-09-07 | Drill Stem Test Performed |
1980-09-08 | Drill Stem Test Performed |
1980-09-08 | Production Casing Operation Performed |
1980-10-19 | Perforation Treatment Performed - Jet Perforation |
1980-10-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-11-23 | Perforation Treatment Performed - Jet Perforation |
1980-11-28 | Well Mode changed to Drilled and Cased |
1981-08-15 | Well Began Production |
1981-08-15 | Well Fluid changed to Gas |
1981-08-15 | Well Mode changed to Flowing |
1982-06-16 | Perforation Treatment Performed - Cement Plug |
1982-06-17 | Perforation Treatment Performed - Jet Perforation |
1982-06-17 | Well Fluid changed to Gas |
1982-06-17 | Well Mode changed to Abandoned Zone |
1985-02-08 | Perforation Treatment Performed - Fractured |
1992-09-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-09-14 | Plug Back Performed |
1992-09-14 | Well Log Performed |
1992-10-09 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-10-19 | Perforation | 782.60 | 784.60 | 7 |
1980-10-21 | Acid Treatment | 782.60 | 784.60 | 0 |
1980-11-23 | Perforation | 742.00 | 744.00 | 7 |
1982-06-16 | Cement Plug | 704.60 | 780.00 | 0 |
1982-06-17 | Perforation | 600.10 | 602.10 | 10 |
1982-06-17 | Perforation | 609.10 | 611.10 | 10 |
1985-02-08 | Fracture | 600.10 | 611.10 | 0 |
1992-09-14 | Packing Device Capped w/Cement | 585.00 | 593.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1981 | 2921 | 0.0 | 0.0 | 0.0 |
1982 | 2012 | 0.0 | 0.0 | 0.0 |
For data sources see[5]