Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-005-30620 | | Well ID: 37-005-30620 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.966552, -79.227608 | width=100% | height=100% }} |
+ | |- | ||
+ | | County: [[Armstrong County, Pennsylvania|Armstrong]] | ||
+ | |- | ||
+ | | Municipality: [[Redbank Township, Armstrong County, Pennsylvania|Redbank Township]] | ||
|- | |- | ||
| Operator Name: [[DAWN ENERGY SVC]] | | Operator Name: [[DAWN ENERGY SVC]] | ||
+ | |- | ||
+ | | Well Pad ID: | ||
+ | |- | ||
+ | | Farm/Lease Name: PHILLIPS 4 | ||
|- | |- | ||
| First Permit Date: 2010-05-11 | | First Permit Date: 2010-05-11 | ||
Line 16: | Line 24: | ||
|- | |- | ||
| Horizontal: No | | Horizontal: No | ||
+ | |- | ||
+ | | Well Status: | ||
|- | |- | ||
| Violations: 2 | | Violations: 2 | ||
Line 34: | Line 44: | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Production Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production | ||
+ | | accessdate = 2015-05-27 }}</ref> | ||
== Waste Data == | == Waste Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 46: | Line 62: | ||
!scope="col" | FACILITY STATE | !scope="col" | FACILITY STATE | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Waste Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste | ||
+ | | accessdate = 2015-05-26 }}</ref> | ||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 53: | Line 75: | ||
!scope="col" | COMMENT | !scope="col" | COMMENT | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
+ | !scope="col" | VIOLATION CODE | ||
+ | !scope="col" | VIOLATION_COMMENT | ||
|- | |- | ||
| 1894068 | | 1894068 | ||
Line 59: | Line 83: | ||
| Drilling was ongoing at the time of the inspection. Below grade pit located onsite and it had more than the required two feet of lined freeboard. Noted that the silt fence or hay bales had not been installed as outlined in the E&S plan rendering, however this BMP was not needed to minimize accelerated erosion and sedimentation on this site. Access road erosion controls were not adequate to effectively minimize accelerated erosion & sedimentation. There was no observed way to effectively collect runoff from the access road and the surrounding area appeared to be a former strip job area that was devoid of vegetation capable of handling the runoff flow. In addition a culvert had been placed under the access road near an UNT (Unamed Tributary) to Pine Run and this culvert had no BMP's to effectively minimize accelerated erosion & sedimentation. The outflow from this culvert flows directly into the UNT to Pine Run without any erosion controls to minimize sediment generation & transport. | | Drilling was ongoing at the time of the inspection. Below grade pit located onsite and it had more than the required two feet of lined freeboard. Noted that the silt fence or hay bales had not been installed as outlined in the E&S plan rendering, however this BMP was not needed to minimize accelerated erosion and sedimentation on this site. Access road erosion controls were not adequate to effectively minimize accelerated erosion & sedimentation. There was no observed way to effectively collect runoff from the access road and the surrounding area appeared to be a former strip job area that was devoid of vegetation capable of handling the runoff flow. In addition a culvert had been placed under the access road near an UNT (Unamed Tributary) to Pine Run and this culvert had no BMP's to effectively minimize accelerated erosion & sedimentation. The outflow from this culvert flows directly into the UNT to Pine Run without any erosion controls to minimize sediment generation & transport. | ||
| 590203 | | 590203 | ||
+ | | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
Line 66: | Line 92: | ||
| Drilling was ongoing at the time of the inspection. Below grade pit located onsite and it had more than the required two feet of lined freeboard. Noted that the silt fence or hay bales had not been installed as outlined in the E&S plan rendering, however this BMP was not needed to minimize accelerated erosion and sedimentation on this site. Access road erosion controls were not adequate to effectively minimize accelerated erosion & sedimentation. There was no observed way to effectively collect runoff from the access road and the surrounding area appeared to be a former strip job area that was devoid of vegetation capable of handling the runoff flow. In addition a culvert had been placed under the access road near an UNT (Unamed Tributary) to Pine Run and this culvert had no BMP's to effectively minimize accelerated erosion & sedimentation. The outflow from this culvert flows directly into the UNT to Pine Run without any erosion controls to minimize sediment generation & transport. | | Drilling was ongoing at the time of the inspection. Below grade pit located onsite and it had more than the required two feet of lined freeboard. Noted that the silt fence or hay bales had not been installed as outlined in the E&S plan rendering, however this BMP was not needed to minimize accelerated erosion and sedimentation on this site. Access road erosion controls were not adequate to effectively minimize accelerated erosion & sedimentation. There was no observed way to effectively collect runoff from the access road and the surrounding area appeared to be a former strip job area that was devoid of vegetation capable of handling the runoff flow. In addition a culvert had been placed under the access road near an UNT (Unamed Tributary) to Pine Run and this culvert had no BMP's to effectively minimize accelerated erosion & sedimentation. The outflow from this culvert flows directly into the UNT to Pine Run without any erosion controls to minimize sediment generation & transport. | ||
| 590204 | | 590204 | ||
+ | | 102.4INADPLN - E&S Plan not adequate | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
Line 71: | Line 99: | ||
| 2010-06-24 | | 2010-06-24 | ||
| No Violations Noted | | No Violations Noted | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 79: | Line 109: | ||
| Outstanding Violations - No Viols Req'd | | Outstanding Violations - No Viols Req'd | ||
| Drilling appeared to have been completed at the time of the inspection. Observed no accelerated erosion & sedimentation in relation to the site. Culverted runoff ditch had clean rock placed in the inlet and outlet of the culvert however additional work was required due to the existing nature of the surrounding landscape. Spoke with operator representative Mr. Ripple while onsite and he stated that final road grading work will be completed the end of next or the beginning of the following week. | | Drilling appeared to have been completed at the time of the inspection. Observed no accelerated erosion & sedimentation in relation to the site. Culverted runoff ditch had clean rock placed in the inlet and outlet of the culvert however additional work was required due to the existing nature of the surrounding landscape. Spoke with operator representative Mr. Ripple while onsite and he stated that final road grading work will be completed the end of next or the beginning of the following week. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 86: | Line 118: | ||
| Outstanding Violations - No Viols Req'd | | Outstanding Violations - No Viols Req'd | ||
| Drilling appeared to have been completed at the time of the inspection. Observed no accelerated erosion & sedimentation in relation to the site. Culverted runoff ditch had clean rock placed in the inlet and outlet of the culvert however additional work was required due to the existing nature of the surrounding landscape. Spoke with operator representative Mr. Ripple while onsite. Mr. Ripple stated that final road work had not as of yet been completed. Mr. Ripple stated that rock had been placed in the culvert outlet, however sediment was noted as beginning to fill in between the rocks. Mr. Ripple and WQS Higgins spoke about the implementation of a small sediment trap and rock lined ditch. Mr. Ripple indicated that he will implement the sediment trap in the near future. | | Drilling appeared to have been completed at the time of the inspection. Observed no accelerated erosion & sedimentation in relation to the site. Culverted runoff ditch had clean rock placed in the inlet and outlet of the culvert however additional work was required due to the existing nature of the surrounding landscape. Spoke with operator representative Mr. Ripple while onsite. Mr. Ripple stated that final road work had not as of yet been completed. Mr. Ripple stated that rock had been placed in the culvert outlet, however sediment was noted as beginning to fill in between the rocks. Mr. Ripple and WQS Higgins spoke about the implementation of a small sediment trap and rock lined ditch. Mr. Ripple indicated that he will implement the sediment trap in the near future. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 93: | Line 127: | ||
| No Violations Noted | | No Violations Noted | ||
| Final road grading and culvert erosion control had been completed. Due to the nature of the surrounding area, specifically what appears to be a former strip mine area, the access road, culvert, and erosion controls will need to be monitored and maintained to insure their functionality on a regular basis. | | Final road grading and culvert erosion control had been completed. Due to the nature of the surrounding area, specifically what appears to be a former strip mine area, the access road, culvert, and erosion controls will need to be monitored and maintained to insure their functionality on a regular basis. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
|} | |} | ||
− | ==References== | + | For data sources see<ref>{{cite web |
− | {{ | + | | title = Oil and Gas Historical Inspection Report |
− | + | | publisher = [[Pennsylvania Department of Environmental Protection]] | |
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections | ||
+ | | accessdate = 2015-05-27 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 37-005-30620 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.966552,"lon":-79.227608,"icon":""}]} |
County: Armstrong | |
Municipality: Redbank Township | |
Operator Name: DAWN ENERGY SVC | |
Well Pad ID: | |
Farm/Lease Name: PHILLIPS 4 | |
First Permit Date: 2010-05-11 | |
Last Permit Date: 2010-05-11 | |
Spud Date: 2010-06-21 | |
Unconventional: No | |
Horizontal: No | |
Well Status: | |
Violations: 2 | |
Latitude: 40.966552 | |
Longitude: -79.227608 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
For data sources see[1]
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
For data sources see[2]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
1894068 | 2010-06-24 | Violation(s) Noted | Drilling was ongoing at the time of the inspection. Below grade pit located onsite and it had more than the required two feet of lined freeboard. Noted that the silt fence or hay bales had not been installed as outlined in the E&S plan rendering, however this BMP was not needed to minimize accelerated erosion and sedimentation on this site. Access road erosion controls were not adequate to effectively minimize accelerated erosion & sedimentation. There was no observed way to effectively collect runoff from the access road and the surrounding area appeared to be a former strip job area that was devoid of vegetation capable of handling the runoff flow. In addition a culvert had been placed under the access road near an UNT (Unamed Tributary) to Pine Run and this culvert had no BMP's to effectively minimize accelerated erosion & sedimentation. The outflow from this culvert flows directly into the UNT to Pine Run without any erosion controls to minimize sediment generation & transport. | 590203 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | |
1894068 | 2010-06-24 | Violation(s) Noted | Drilling was ongoing at the time of the inspection. Below grade pit located onsite and it had more than the required two feet of lined freeboard. Noted that the silt fence or hay bales had not been installed as outlined in the E&S plan rendering, however this BMP was not needed to minimize accelerated erosion and sedimentation on this site. Access road erosion controls were not adequate to effectively minimize accelerated erosion & sedimentation. There was no observed way to effectively collect runoff from the access road and the surrounding area appeared to be a former strip job area that was devoid of vegetation capable of handling the runoff flow. In addition a culvert had been placed under the access road near an UNT (Unamed Tributary) to Pine Run and this culvert had no BMP's to effectively minimize accelerated erosion & sedimentation. The outflow from this culvert flows directly into the UNT to Pine Run without any erosion controls to minimize sediment generation & transport. | 590204 | 102.4INADPLN - E&S Plan not adequate | |
1894851 | 2010-06-24 | No Violations Noted | ||||
1896788 | 2010-07-07 | Outstanding Violations - No Viols Req'd | Drilling appeared to have been completed at the time of the inspection. Observed no accelerated erosion & sedimentation in relation to the site. Culverted runoff ditch had clean rock placed in the inlet and outlet of the culvert however additional work was required due to the existing nature of the surrounding landscape. Spoke with operator representative Mr. Ripple while onsite and he stated that final road grading work will be completed the end of next or the beginning of the following week. | |||
1902371 | 2010-08-02 | Outstanding Violations - No Viols Req'd | Drilling appeared to have been completed at the time of the inspection. Observed no accelerated erosion & sedimentation in relation to the site. Culverted runoff ditch had clean rock placed in the inlet and outlet of the culvert however additional work was required due to the existing nature of the surrounding landscape. Spoke with operator representative Mr. Ripple while onsite. Mr. Ripple stated that final road work had not as of yet been completed. Mr. Ripple stated that rock had been placed in the culvert outlet, however sediment was noted as beginning to fill in between the rocks. Mr. Ripple and WQS Higgins spoke about the implementation of a small sediment trap and rock lined ditch. Mr. Ripple indicated that he will implement the sediment trap in the near future. | |||
1912962 | 2010-09-14 | No Violations Noted | Final road grading and culvert erosion control had been completed. Due to the nature of the surrounding area, specifically what appears to be a former strip mine area, the access road, culvert, and erosion controls will need to be monitored and maintained to insure their functionality on a regular basis. |
For data sources see[3]