| Well ID: 37-039-25753
 
| Well ID: 37-039-25753
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.798, -80.328583 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.798, -80.328583 | width=100% | height=100% }}  
 +
|-
 +
| County: [[Crawford County, Pennsylvania|Crawford]]
 +
|-
 +
| Municipality: [[Spring Township, Crawford County, Pennsylvania|Spring Township]]
 
|-
 
|-
 
| Operator Name: [[ENERVEST OPR LLC]]
 
| Operator Name: [[ENERVEST OPR LLC]]
 +
|-
 +
| Well Pad ID:
 +
|-
 +
| Farm/Lease Name: MILLER 1
 
|-
 
|-
 
| First Permit Date: 2011-12-21
 
| First Permit Date: 2011-12-21
Line 17: Line 25:
 
| Horizontal: No
 
| Horizontal: No
 
|-
 
|-
| Violations: None
+
| Well Status: ACTIVE
 +
|-
 +
| Violations: 0
 
|-
 
|-
 
| Latitude: 41.798
 
| Latitude: 41.798
Line 41: Line 51:
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2012-0
 +
| style="text-align:right;" | 3632.0
 +
| style="text-align:right;" | 245.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2013-0
 +
| style="text-align:right;" | 4997.0
 +
| style="text-align:right;" | 365.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 63.11
 +
| style="text-align:right;" | 365.0
 +
|-
 +
|-
 +
| 2014-0
 +
| style="text-align:right;" | 3724.57
 +
| style="text-align:right;" | 365.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 124.78
 +
| style="text-align:right;" | 365.0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 54: Line 97:
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
!scope="col" | FACILITY STATE
 +
|-
 +
| 2012-0
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 599.0
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-007-24523
 +
| MONROE #1
 +
| WOOSTER
 +
| OH
 +
|-
 +
|-
 +
| 2012-0
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 181.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE FOR DRILLING OR PLUGGING
 +
|
 +
|
 +
|-
 +
|-
 +
| 2013-0
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 446.0
 +
| Bbl
 +
| ROAD SPREADING
 +
|
 +
| CRAWFORD COUNTY ROADSPREADING - SPRING TOWNSHIP
 +
|
 +
| PA
 +
|-
 +
|-
 +
| 2013-0
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 134.0
 +
| Bbl
 +
| ROAD SPREADING
 +
|
 +
| ERIE COUNTY ROADSPREADING - FRANKLIN TOWNSHIP
 +
|
 +
| PA
 +
|-
 +
|-
 +
| 2013-0
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 753.0
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-007-24523
 +
| MONROE #1
 +
| WOOSTER
 +
| OH
 +
|-
 +
|-
 +
| 2014-0
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 1.0
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-007-24523
 +
| MONROE #1
 +
| WOOSTER
 +
| OH
 +
|-
 +
|-
 +
| 2014-0
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 2.42
 +
| Bbl
 +
| STORAGE PENDING DISPOSAL OR REUSE
 +
|
 +
| TEMP ON SITE STORAGE PENDING DISPOSAL OR REUSE
 +
|
 +
| PA
 +
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 62: Line 188:
 
!scope="col" | COMMENT
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 
|-
 
|-
 
| 2029692
 
| 2029692
Line 67: Line 195:
 
| No Violations Noted
 
| No Violations Noted
 
| Upon inspection today I found a new well access road and well pad under construction. The Site ID- Permit and E&S Plan where posted. The access road was stoned; the well pad was being stoned while on-site and the pits being dug. One item of concern was that a top soil pile was approx 15' from a blue line stream w/o BMPs to control run-off. I called Drilling Supervisor, Jeff Foley and explained that BMPs to control potential run-off must be installed right away; he agreed to have the dirt contractor install whatever was needed. All setback requirerments have been met.
 
| Upon inspection today I found a new well access road and well pad under construction. The Site ID- Permit and E&S Plan where posted. The access road was stoned; the well pad was being stoned while on-site and the pits being dug. One item of concern was that a top soil pile was approx 15' from a blue line stream w/o BMPs to control run-off. I called Drilling Supervisor, Jeff Foley and explained that BMPs to control potential run-off must be installed right away; he agreed to have the dirt contractor install whatever was needed. All setback requirerments have been met.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 74: Line 204:
 
| No Violations Noted
 
| No Violations Noted
 
| Today's inspection was in follow-up  to my concerns identified during my 12/27/2011 inspection, and to evaluate the current status of this new well site.  Upon inspection I found the items of concern I had mentioned to the Drilling Supervisor,  Mr Foley had been addrssed. BMPs have been installed as requested.  The well pad is still under construction The Site ID- Permit and E&S Plan where posted. The access road condition has in good condition. the well pad was stoned. No rig on-site.
 
| Today's inspection was in follow-up  to my concerns identified during my 12/27/2011 inspection, and to evaluate the current status of this new well site.  Upon inspection I found the items of concern I had mentioned to the Drilling Supervisor,  Mr Foley had been addrssed. BMPs have been installed as requested.  The well pad is still under construction The Site ID- Permit and E&S Plan where posted. The access road condition has in good condition. the well pad was stoned. No rig on-site.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 80: Line 212:
 
| 2012-01-09
 
| 2012-01-09
 
| No Violations Noted
 
| No Violations Noted
 +
|
 +
|
 
|  
 
|  
 
|  
 
|  
Line 87: Line 221:
 
| 2012-01-11
 
| 2012-01-11
 
| No Violations Noted
 
| No Violations Noted
 +
|
 +
|
 
|  
 
|  
 
|  
 
|  
Line 95: Line 231:
 
| No Violations Noted
 
| No Violations Noted
 
| Upon inspection I found the rig on site and drilling. The Permit and E&S Plan where posted. The E&S Plan was implemented. The access road was in good shape. Both  pits had over 4 ft of freeboard.  Some sections of the slit fence needed repaired. I called the Jeff Foley, Project Manager,  and he agreed to have the BMP repaired today.
 
| Upon inspection I found the rig on site and drilling. The Permit and E&S Plan where posted. The E&S Plan was implemented. The access road was in good shape. Both  pits had over 4 ft of freeboard.  Some sections of the slit fence needed repaired. I called the Jeff Foley, Project Manager,  and he agreed to have the BMP repaired today.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 102: Line 240:
 
| No Violations Noted
 
| No Violations Noted
 
| Follow-up inspection to determine if the BMPs locateon the east side of the access road have been repaired. Upon inspection I found the BMP repaired; rig on-site with over 4ft of freeboard in pits.
 
| Follow-up inspection to determine if the BMPs locateon the east side of the access road have been repaired. Upon inspection I found the BMP repaired; rig on-site with over 4ft of freeboard in pits.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 108: Line 248:
 
| 2012-01-13
 
| 2012-01-13
 
| No Violations Noted
 
| No Violations Noted
 +
|
 +
|
 
|  
 
|  
 
|  
 
|  
Line 115: Line 257:
 
| 2012-01-18
 
| 2012-01-18
 
| No Violations Noted
 
| No Violations Noted
 +
|
 +
|
 
|  
 
|  
 
|  
 
|  
Line 123: Line 267:
 
| No Violations Noted
 
| No Violations Noted
 
| Follow-up inspection to determine if the BMPs are being main tained as required to keep sediment from entering the blue line stream that borders the site to the east. Upon inspeciton I found all BMPs in good condition. The rig was still on site and the pits open with over 2 ft of freeboard.
 
| Follow-up inspection to determine if the BMPs are being main tained as required to keep sediment from entering the blue line stream that borders the site to the east. Upon inspeciton I found all BMPs in good condition. The rig was still on site and the pits open with over 2 ft of freeboard.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 129: Line 275:
 
| 2012-05-16
 
| 2012-05-16
 
| No Violations Noted
 
| No Violations Noted
 +
|
 +
|
 
|  
 
|  
 
|  
 
|  
Line 136: Line 284:
 
| 2012-05-18
 
| 2012-05-18
 
| No Violations Noted
 
| No Violations Noted
 +
|
 +
|
 
|  
 
|  
 
|  
 
|  
Line 143: Line 293:
 
| 2012-08-24
 
| 2012-08-24
 
| No Violations Noted
 
| No Violations Noted
 +
|
 +
|
 
|  
 
|  
 
|  
 
|  
Line 149: Line 301:
 
| 2129469
 
| 2129469
 
| 2013-01-08
 
| 2013-01-08
| Crawford
 
| Spring Twp
 
 
| No Violations Noted
 
| No Violations Noted
 +
|
 +
|
 +
|
 +
|
 
|-
 
|-
 
|-
 
|-
 
| 2175002
 
| 2175002
 
| 2013-06-11
 
| 2013-06-11
| Crawford
 
| Spring Twp
 
 
| No Violations Noted
 
| No Violations Noted
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2354704
 +
| 2015-03-24
 +
| No Violations Noted
 +
|
 +
|
 +
|
 +
|
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Inspection Report
 
+
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 15:49, 26 June 2015

Well Details

Well ID: 37-039-25753
Loading map...
County: Crawford
Municipality: Spring Township
Operator Name: ENERVEST OPR LLC
Well Pad ID:
Farm/Lease Name: MILLER 1
First Permit Date: 2011-12-21
Last Permit Date: 2011-12-21
Spud Date: 2012-01-06
Unconventional: No
Horizontal: No
Well Status: ACTIVE
Violations: 0
Latitude: 41.798
Longitude: -80.328583

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2011-0 0.0 0.0 0.0 0.0 0.0 0.0
2012-0 3632.0 245.0 0.0 0.0 0.0 0.0
2013-0 4997.0 365.0 0.0 0.0 63.11 365.0
2014-0 3724.57 365.0 0.0 0.0 124.78 365.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-0 PRODUCED FLUID 599.0 Bbl INJECTION DISPOSAL WELL 34-007-24523 MONROE #1 WOOSTER OH
2012-0 PRODUCED FLUID 181.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-0 PRODUCED FLUID 446.0 Bbl ROAD SPREADING CRAWFORD COUNTY ROADSPREADING - SPRING TOWNSHIP PA
2013-0 PRODUCED FLUID 134.0 Bbl ROAD SPREADING ERIE COUNTY ROADSPREADING - FRANKLIN TOWNSHIP PA
2013-0 PRODUCED FLUID 753.0 Bbl INJECTION DISPOSAL WELL 34-007-24523 MONROE #1 WOOSTER OH
2014-0 PRODUCED FLUID 1.0 Bbl INJECTION DISPOSAL WELL 34-007-24523 MONROE #1 WOOSTER OH
2014-0 PRODUCED FLUID 2.42 Bbl STORAGE PENDING DISPOSAL OR REUSE TEMP ON SITE STORAGE PENDING DISPOSAL OR REUSE PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
2029692 2011-12-27 No Violations Noted Upon inspection today I found a new well access road and well pad under construction. The Site ID- Permit and E&S Plan where posted. The access road was stoned; the well pad was being stoned while on-site and the pits being dug. One item of concern was that a top soil pile was approx 15' from a blue line stream w/o BMPs to control run-off. I called Drilling Supervisor, Jeff Foley and explained that BMPs to control potential run-off must be installed right away; he agreed to have the dirt contractor install whatever was needed. All setback requirerments have been met.
2029881 2011-12-28 No Violations Noted Today's inspection was in follow-up to my concerns identified during my 12/27/2011 inspection, and to evaluate the current status of this new well site. Upon inspection I found the items of concern I had mentioned to the Drilling Supervisor, Mr Foley had been addrssed. BMPs have been installed as requested. The well pad is still under construction The Site ID- Permit and E&S Plan where posted. The access road condition has in good condition. the well pad was stoned. No rig on-site.
2032576 2012-01-09 No Violations Noted
2033278 2012-01-11 No Violations Noted
2034459 2012-01-10 No Violations Noted Upon inspection I found the rig on site and drilling. The Permit and E&S Plan where posted. The E&S Plan was implemented. The access road was in good shape. Both pits had over 4 ft of freeboard. Some sections of the slit fence needed repaired. I called the Jeff Foley, Project Manager, and he agreed to have the BMP repaired today.
2034483 2012-01-11 No Violations Noted Follow-up inspection to determine if the BMPs locateon the east side of the access road have been repaired. Upon inspection I found the BMP repaired; rig on-site with over 4ft of freeboard in pits.
2035179 2012-01-13 No Violations Noted
2035382 2012-01-18 No Violations Noted
2038572 2012-01-26 No Violations Noted Follow-up inspection to determine if the BMPs are being main tained as required to keep sediment from entering the blue line stream that borders the site to the east. Upon inspeciton I found all BMPs in good condition. The rig was still on site and the pits open with over 2 ft of freeboard.
2068733 2012-05-16 No Violations Noted
2069109 2012-05-18 No Violations Noted
2097233 2012-08-24 No Violations Noted
2129469 2013-01-08 No Violations Noted
2175002 2013-06-11 No Violations Noted
2354704 2015-03-24 No Violations Noted

For data sources see[3]