If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-039-25753 | | Well ID: 37-039-25753 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 41.798, -80.328583 | width=100% | height=100% }} |
+ | |- | ||
+ | | County: [[Crawford County, Pennsylvania|Crawford]] | ||
+ | |- | ||
+ | | Municipality: [[Spring Township, Crawford County, Pennsylvania|Spring Township]] | ||
|- | |- | ||
| Operator Name: [[ENERVEST OPR LLC]] | | Operator Name: [[ENERVEST OPR LLC]] | ||
+ | |- | ||
+ | | Well Pad ID: | ||
+ | |- | ||
+ | | Farm/Lease Name: MILLER 1 | ||
|- | |- | ||
| First Permit Date: 2011-12-21 | | First Permit Date: 2011-12-21 | ||
Line 17: | Line 25: | ||
| Horizontal: No | | Horizontal: No | ||
|- | |- | ||
− | | Violations: | + | | Well Status: ACTIVE |
+ | |- | ||
+ | | Violations: 0 | ||
|- | |- | ||
| Latitude: 41.798 | | Latitude: 41.798 | ||
Line 41: | Line 51: | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-0 | ||
+ | | style="text-align:right;" | 3632.0 | ||
+ | | style="text-align:right;" | 245.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-0 | ||
+ | | style="text-align:right;" | 4997.0 | ||
+ | | style="text-align:right;" | 365.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 63.11 | ||
+ | | style="text-align:right;" | 365.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-0 | ||
+ | | style="text-align:right;" | 3724.57 | ||
+ | | style="text-align:right;" | 365.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 124.78 | ||
+ | | style="text-align:right;" | 365.0 | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Production Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production | ||
+ | | accessdate = 2015-05-27 }}</ref> | ||
== Waste Data == | == Waste Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 54: | Line 97: | ||
!scope="col" | FACILITY CITY | !scope="col" | FACILITY CITY | ||
!scope="col" | FACILITY STATE | !scope="col" | FACILITY STATE | ||
+ | |- | ||
+ | | 2012-0 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 599.0 | ||
+ | | Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-007-24523 | ||
+ | | MONROE #1 | ||
+ | | WOOSTER | ||
+ | | OH | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-0 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 181.0 | ||
+ | | Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | | REUSE FOR DRILLING OR PLUGGING | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-0 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 446.0 | ||
+ | | Bbl | ||
+ | | ROAD SPREADING | ||
+ | | | ||
+ | | CRAWFORD COUNTY ROADSPREADING - SPRING TOWNSHIP | ||
+ | | | ||
+ | | PA | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-0 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 134.0 | ||
+ | | Bbl | ||
+ | | ROAD SPREADING | ||
+ | | | ||
+ | | ERIE COUNTY ROADSPREADING - FRANKLIN TOWNSHIP | ||
+ | | | ||
+ | | PA | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-0 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 753.0 | ||
+ | | Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-007-24523 | ||
+ | | MONROE #1 | ||
+ | | WOOSTER | ||
+ | | OH | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-0 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 1.0 | ||
+ | | Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-007-24523 | ||
+ | | MONROE #1 | ||
+ | | WOOSTER | ||
+ | | OH | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-0 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 2.42 | ||
+ | | Bbl | ||
+ | | STORAGE PENDING DISPOSAL OR REUSE | ||
+ | | | ||
+ | | TEMP ON SITE STORAGE PENDING DISPOSAL OR REUSE | ||
+ | | | ||
+ | | PA | ||
+ | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Waste Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste | ||
+ | | accessdate = 2015-05-26 }}</ref> | ||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 62: | Line 188: | ||
!scope="col" | COMMENT | !scope="col" | COMMENT | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
+ | !scope="col" | VIOLATION CODE | ||
+ | !scope="col" | VIOLATION_COMMENT | ||
|- | |- | ||
| 2029692 | | 2029692 | ||
Line 67: | Line 195: | ||
| No Violations Noted | | No Violations Noted | ||
| Upon inspection today I found a new well access road and well pad under construction. The Site ID- Permit and E&S Plan where posted. The access road was stoned; the well pad was being stoned while on-site and the pits being dug. One item of concern was that a top soil pile was approx 15' from a blue line stream w/o BMPs to control run-off. I called Drilling Supervisor, Jeff Foley and explained that BMPs to control potential run-off must be installed right away; he agreed to have the dirt contractor install whatever was needed. All setback requirerments have been met. | | Upon inspection today I found a new well access road and well pad under construction. The Site ID- Permit and E&S Plan where posted. The access road was stoned; the well pad was being stoned while on-site and the pits being dug. One item of concern was that a top soil pile was approx 15' from a blue line stream w/o BMPs to control run-off. I called Drilling Supervisor, Jeff Foley and explained that BMPs to control potential run-off must be installed right away; he agreed to have the dirt contractor install whatever was needed. All setback requirerments have been met. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 74: | Line 204: | ||
| No Violations Noted | | No Violations Noted | ||
| Today's inspection was in follow-up to my concerns identified during my 12/27/2011 inspection, and to evaluate the current status of this new well site. Upon inspection I found the items of concern I had mentioned to the Drilling Supervisor, Mr Foley had been addrssed. BMPs have been installed as requested. The well pad is still under construction The Site ID- Permit and E&S Plan where posted. The access road condition has in good condition. the well pad was stoned. No rig on-site. | | Today's inspection was in follow-up to my concerns identified during my 12/27/2011 inspection, and to evaluate the current status of this new well site. Upon inspection I found the items of concern I had mentioned to the Drilling Supervisor, Mr Foley had been addrssed. BMPs have been installed as requested. The well pad is still under construction The Site ID- Permit and E&S Plan where posted. The access road condition has in good condition. the well pad was stoned. No rig on-site. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 80: | Line 212: | ||
| 2012-01-09 | | 2012-01-09 | ||
| No Violations Noted | | No Violations Noted | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 87: | Line 221: | ||
| 2012-01-11 | | 2012-01-11 | ||
| No Violations Noted | | No Violations Noted | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 95: | Line 231: | ||
| No Violations Noted | | No Violations Noted | ||
| Upon inspection I found the rig on site and drilling. The Permit and E&S Plan where posted. The E&S Plan was implemented. The access road was in good shape. Both pits had over 4 ft of freeboard. Some sections of the slit fence needed repaired. I called the Jeff Foley, Project Manager, and he agreed to have the BMP repaired today. | | Upon inspection I found the rig on site and drilling. The Permit and E&S Plan where posted. The E&S Plan was implemented. The access road was in good shape. Both pits had over 4 ft of freeboard. Some sections of the slit fence needed repaired. I called the Jeff Foley, Project Manager, and he agreed to have the BMP repaired today. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 102: | Line 240: | ||
| No Violations Noted | | No Violations Noted | ||
| Follow-up inspection to determine if the BMPs locateon the east side of the access road have been repaired. Upon inspection I found the BMP repaired; rig on-site with over 4ft of freeboard in pits. | | Follow-up inspection to determine if the BMPs locateon the east side of the access road have been repaired. Upon inspection I found the BMP repaired; rig on-site with over 4ft of freeboard in pits. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 108: | Line 248: | ||
| 2012-01-13 | | 2012-01-13 | ||
| No Violations Noted | | No Violations Noted | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 115: | Line 257: | ||
| 2012-01-18 | | 2012-01-18 | ||
| No Violations Noted | | No Violations Noted | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 123: | Line 267: | ||
| No Violations Noted | | No Violations Noted | ||
| Follow-up inspection to determine if the BMPs are being main tained as required to keep sediment from entering the blue line stream that borders the site to the east. Upon inspeciton I found all BMPs in good condition. The rig was still on site and the pits open with over 2 ft of freeboard. | | Follow-up inspection to determine if the BMPs are being main tained as required to keep sediment from entering the blue line stream that borders the site to the east. Upon inspeciton I found all BMPs in good condition. The rig was still on site and the pits open with over 2 ft of freeboard. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 129: | Line 275: | ||
| 2012-05-16 | | 2012-05-16 | ||
| No Violations Noted | | No Violations Noted | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 136: | Line 284: | ||
| 2012-05-18 | | 2012-05-18 | ||
| No Violations Noted | | No Violations Noted | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 143: | Line 293: | ||
| 2012-08-24 | | 2012-08-24 | ||
| No Violations Noted | | No Violations Noted | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 149: | Line 301: | ||
| 2129469 | | 2129469 | ||
| 2013-01-08 | | 2013-01-08 | ||
− | |||
− | |||
| No Violations Noted | | No Violations Noted | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 2175002 | | 2175002 | ||
| 2013-06-11 | | 2013-06-11 | ||
− | |||
− | |||
| No Violations Noted | | No Violations Noted | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2354704 | ||
+ | | 2015-03-24 | ||
+ | | No Violations Noted | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
− | ==References== | + | For data sources see<ref>{{cite web |
− | {{ | + | | title = Oil and Gas Historical Inspection Report |
− | + | | publisher = [[Pennsylvania Department of Environmental Protection]] | |
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections | ||
+ | | accessdate = 2015-05-27 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 37-039-25753 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.798,"lon":-80.328583,"icon":""}]} |
County: Crawford | |
Municipality: Spring Township | |
Operator Name: ENERVEST OPR LLC | |
Well Pad ID: | |
Farm/Lease Name: MILLER 1 | |
First Permit Date: 2011-12-21 | |
Last Permit Date: 2011-12-21 | |
Spud Date: 2012-01-06 | |
Unconventional: No | |
Horizontal: No | |
Well Status: ACTIVE | |
Violations: 0 | |
Latitude: 41.798 | |
Longitude: -80.328583 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2011-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-0 | 3632.0 | 245.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-0 | 4997.0 | 365.0 | 0.0 | 0.0 | 63.11 | 365.0 |
2014-0 | 3724.57 | 365.0 | 0.0 | 0.0 | 124.78 | 365.0 |
For data sources see[1]
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-0 | PRODUCED FLUID | 599.0 | Bbl | INJECTION DISPOSAL WELL | 34-007-24523 | MONROE #1 | WOOSTER | OH |
2012-0 | PRODUCED FLUID | 181.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR DRILLING OR PLUGGING | |||
2013-0 | PRODUCED FLUID | 446.0 | Bbl | ROAD SPREADING | CRAWFORD COUNTY ROADSPREADING - SPRING TOWNSHIP | PA | ||
2013-0 | PRODUCED FLUID | 134.0 | Bbl | ROAD SPREADING | ERIE COUNTY ROADSPREADING - FRANKLIN TOWNSHIP | PA | ||
2013-0 | PRODUCED FLUID | 753.0 | Bbl | INJECTION DISPOSAL WELL | 34-007-24523 | MONROE #1 | WOOSTER | OH |
2014-0 | PRODUCED FLUID | 1.0 | Bbl | INJECTION DISPOSAL WELL | 34-007-24523 | MONROE #1 | WOOSTER | OH |
2014-0 | PRODUCED FLUID | 2.42 | Bbl | STORAGE PENDING DISPOSAL OR REUSE | TEMP ON SITE STORAGE PENDING DISPOSAL OR REUSE | PA |
For data sources see[2]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
2029692 | 2011-12-27 | No Violations Noted | Upon inspection today I found a new well access road and well pad under construction. The Site ID- Permit and E&S Plan where posted. The access road was stoned; the well pad was being stoned while on-site and the pits being dug. One item of concern was that a top soil pile was approx 15' from a blue line stream w/o BMPs to control run-off. I called Drilling Supervisor, Jeff Foley and explained that BMPs to control potential run-off must be installed right away; he agreed to have the dirt contractor install whatever was needed. All setback requirerments have been met. | |||
2029881 | 2011-12-28 | No Violations Noted | Today's inspection was in follow-up to my concerns identified during my 12/27/2011 inspection, and to evaluate the current status of this new well site. Upon inspection I found the items of concern I had mentioned to the Drilling Supervisor, Mr Foley had been addrssed. BMPs have been installed as requested. The well pad is still under construction The Site ID- Permit and E&S Plan where posted. The access road condition has in good condition. the well pad was stoned. No rig on-site. | |||
2032576 | 2012-01-09 | No Violations Noted | ||||
2033278 | 2012-01-11 | No Violations Noted | ||||
2034459 | 2012-01-10 | No Violations Noted | Upon inspection I found the rig on site and drilling. The Permit and E&S Plan where posted. The E&S Plan was implemented. The access road was in good shape. Both pits had over 4 ft of freeboard. Some sections of the slit fence needed repaired. I called the Jeff Foley, Project Manager, and he agreed to have the BMP repaired today. | |||
2034483 | 2012-01-11 | No Violations Noted | Follow-up inspection to determine if the BMPs locateon the east side of the access road have been repaired. Upon inspection I found the BMP repaired; rig on-site with over 4ft of freeboard in pits. | |||
2035179 | 2012-01-13 | No Violations Noted | ||||
2035382 | 2012-01-18 | No Violations Noted | ||||
2038572 | 2012-01-26 | No Violations Noted | Follow-up inspection to determine if the BMPs are being main tained as required to keep sediment from entering the blue line stream that borders the site to the east. Upon inspeciton I found all BMPs in good condition. The rig was still on site and the pits open with over 2 ft of freeboard. | |||
2068733 | 2012-05-16 | No Violations Noted | ||||
2069109 | 2012-05-18 | No Violations Noted | ||||
2097233 | 2012-08-24 | No Violations Noted | ||||
2129469 | 2013-01-08 | No Violations Noted | ||||
2175002 | 2013-06-11 | No Violations Noted | ||||
2354704 | 2015-03-24 | No Violations Noted |
For data sources see[3]