X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-039-25753"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-039-25753
 
| Well ID: 37-039-25753
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.7980, -80.328583 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.7980, -80.328583 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 01/06/2012
+
| Spud Date: 2012-01-06
 
|-
 
|-
| Permit Date: 12/21/2011
+
| Permit Date: 2011-12-21
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 88:
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 74: Line 99:
 
| style="text-align: right;" | 245
 
| style="text-align: right;" | 245
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 85: Line 110:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 94: Line 119:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 101: Line 126:
 
| style="text-align: right;" | 31
 
| style="text-align: right;" | 31
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 202: Line 227:
 
| 2029692
 
| 2029692
 
| Primary Facility
 
| Primary Facility
| 12/27/2011
+
| 2011-12-27
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 209: Line 234:
 
| 2029881
 
| 2029881
 
| Primary Facility
 
| Primary Facility
| 12/28/2011
+
| 2011-12-28
 
| Follow-up Inspection
 
| Follow-up Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 216: Line 241:
 
| 2032576
 
| 2032576
 
| Primary Facility
 
| Primary Facility
| 01/09/2012
+
| 2012-01-09
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 223: Line 248:
 
| 2033278
 
| 2033278
 
| Primary Facility
 
| Primary Facility
| 01/11/2012
+
| 2012-01-11
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 230: Line 255:
 
| 2034459
 
| 2034459
 
| Primary Facility
 
| Primary Facility
| 01/10/2012
+
| 2012-01-10
 
| Follow-up Inspection
 
| Follow-up Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 237: Line 262:
 
| 2034483
 
| 2034483
 
| Primary Facility
 
| Primary Facility
| 01/11/2012
+
| 2012-01-11
 
| Follow-up Inspection
 
| Follow-up Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 244: Line 269:
 
| 2035179
 
| 2035179
 
| Primary Facility
 
| Primary Facility
| 01/13/2012
+
| 2012-01-13
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 251: Line 276:
 
| 2035382
 
| 2035382
 
| Primary Facility
 
| Primary Facility
| 01/18/2012
+
| 2012-01-18
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 258: Line 283:
 
| 2038572
 
| 2038572
 
| Primary Facility
 
| Primary Facility
| 01/26/2012
+
| 2012-01-26
 
| Follow-up Inspection
 
| Follow-up Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 265: Line 290:
 
| 2068733
 
| 2068733
 
| Primary Facility
 
| Primary Facility
| 05/16/2012
+
| 2012-05-16
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 272: Line 297:
 
| 2069109
 
| 2069109
 
| Primary Facility
 
| Primary Facility
| 05/18/2012
+
| 2012-05-18
 
| Routine/Partial Inspection
 
| Routine/Partial Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 279: Line 304:
 
| 2097233
 
| 2097233
 
| Primary Facility
 
| Primary Facility
| 08/24/2012
+
| 2012-08-24
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 286: Line 311:
 
| 2129469
 
| 2129469
 
| Primary Facility
 
| Primary Facility
| 01/08/2013
+
| 2013-01-08
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 293: Line 318:
 
| 2175002
 
| 2175002
 
| Primary Facility
 
| Primary Facility
| 06/11/2013
+
| 2013-06-11
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 300: Line 325:
 
| 2354704
 
| 2354704
 
| Primary Facility
 
| Primary Facility
| 03/24/2015
+
| 2015-03-24
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 342: Line 367:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 21:20, 31 July 2019

Well Details

Well ID: 37-039-25753
Loading map...
Country: United States
State: Pennsylvania
County: Crawford
Municipality: Spring Township
Operator Name: ENERVEST OPR LLC
Well Pad ID:
Farm/Lease Name: MILLER 1
License Status: Active
Spud Date: 2012-01-06
Permit Date: 2011-12-21
Unconventional Well: N
Configuration: Vertical Well
Latitude: 41.7980
Longitude: -80.328583

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 0.00 0 0.00 0 0.00 0
2012 ENERVEST OPR LLC 3,632.00 245 0.00 0 0.00 0
2013 ENERVEST OPR LLC 4,997.00 365 63.11 365 0.00 0
2014 ENERVEST OPR LLC 3,724.57 365 124.78 365 0.00 0
2015 ENERVEST OPR LLC 80.00 31 0.00 0 0.00 0
2016 0.00 0 0.00 0 0.00 0
2017 0.00 0 0.00 0 0.00 0
2018 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2012-A00 Produced Fluid (in Barrels) 599.00 Bbl INJECTION DISPOSAL WELL 34-007-24523
2012-A00 Produced Fluid (in Barrels) 181.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013-A00 Produced Fluid (in Barrels) 753.00 Bbl INJECTION DISPOSAL WELL 34-007-24523
2013-A00 Produced Fluid (in Barrels) 446.00 Bbl ROAD SPREADING
2014-A00 Produced Fluid (in Barrels) 1,408.02 Bbl INJECTION DISPOSAL WELL 34-007-24523
2014-A00 Produced Fluid (in Barrels) 2.42 Bbl STORAGE PENDING DISPOSAL OR REUSE

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2029692 Primary Facility 2011-12-27 Routine/Complete Inspection No Violations Noted Upon inspection today I found a new well access road and well pad under construction. The Site ID- Permit and E&S Plan where posted. The access road was stoned; the well pad was being stoned while on-site and the pits being dug. One item of concern was that a top soil pile was approx 15' from a blue line stream w/o BMPs to control run-off. I called Drilling Supervisor, Jeff Foley and explained that BMPs to control potential run-off must be installed right away; he agreed to have the dirt contractor install whatever was needed. All setback requirerments have been met.
2029881 Primary Facility 2011-12-28 Follow-up Inspection No Violations Noted Today's inspection was in follow-up to my concerns identified during my 12/27/2011 inspection, and to evaluate the current status of this new well site. Upon inspection I found the items of concern I had mentioned to the Drilling Supervisor, Mr Foley had been addrssed. BMPs have been installed as requested. The well pad is still under construction The Site ID- Permit and E&S Plan where posted. The access road condition has in good condition. the well pad was stoned. No rig on-site.
2032576 Primary Facility 2012-01-09 Drilling/Alteration No Violations Noted
2033278 Primary Facility 2012-01-11 Drilling/Alteration No Violations Noted
2034459 Primary Facility 2012-01-10 Follow-up Inspection No Violations Noted Upon inspection I found the rig on site and drilling. The Permit and E&S Plan where posted. The E&S Plan was implemented. The access road was in good shape. Both pits had over 4 ft of freeboard. Some sections of the slit fence needed repaired. I called the Jeff Foley, Project Manager, and he agreed to have the BMP repaired today.
2034483 Primary Facility 2012-01-11 Follow-up Inspection No Violations Noted Follow-up inspection to determine if the BMPs locateon the east side of the access road have been repaired. Upon inspection I found the BMP repaired; rig on-site with over 4ft of freeboard in pits.
2035179 Primary Facility 2012-01-13 Drilling/Alteration No Violations Noted
2035382 Primary Facility 2012-01-18 Drilling/Alteration No Violations Noted
2038572 Primary Facility 2012-01-26 Follow-up Inspection No Violations Noted Follow-up inspection to determine if the BMPs are being main tained as required to keep sediment from entering the blue line stream that borders the site to the east. Upon inspeciton I found all BMPs in good condition. The rig was still on site and the pits open with over 2 ft of freeboard.
2068733 Primary Facility 2012-05-16 Routine/Complete Inspection No Violations Noted
2069109 Primary Facility 2012-05-18 Routine/Partial Inspection No Violations Noted
2097233 Primary Facility 2012-08-24 Routine/Complete Inspection No Violations Noted
2129469 Primary Facility 2013-01-08 Routine/Complete Inspection No Violations Noted
2175002 Primary Facility 2013-06-11 Routine/Complete Inspection No Violations Noted
2354704 Primary Facility 2015-03-24 Routine/Complete Inspection No Violations Noted
2540936 Primary Facility 2016-12-02 Administrative/File Review No Violations Noted production review

For data sources see[6]

References