If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-115-20121 | | Well ID: 37-115-20121 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 41.711919, -75.900936 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 21: | Line 21: | ||
| License Status: Active | | License Status: Active | ||
|- | |- | ||
− | | Spud Date: 06 | + | | Spud Date: 2009-06-09 |
|- | |- | ||
− | | Permit Date: | + | | Permit Date: 2009-03-06 |
|- | |- | ||
| Unconventional Well: Y | | Unconventional Well: Y | ||
Line 49: | Line 49: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 63: | Line 88: | ||
| style="text-align: right;" | | | style="text-align: right;" | | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2010 | | 2010 | ||
Line 174: | Line 199: | ||
!scope="col" | Waste Facility ID | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | 2010- | + | | 2010-S02 |
| Basic Sediment (in Barrels) | | Basic Sediment (in Barrels) | ||
| style="text-align: right;" | 2.59 Bbl | | style="text-align: right;" | 2.59 Bbl | ||
Line 180: | Line 205: | ||
| 101534 | | 101534 | ||
|- | |- | ||
− | | 2010- | + | | 2010-S02 |
| Drill Cuttings (in Tons) | | Drill Cuttings (in Tons) | ||
| style="text-align: right;" | 69.50 Tons | | style="text-align: right;" | 69.50 Tons | ||
Line 186: | Line 211: | ||
| 101247 | | 101247 | ||
|- | |- | ||
− | | 2010- | + | | 2010-S02 |
| Drill Cuttings (in Tons) | | Drill Cuttings (in Tons) | ||
| style="text-align: right;" | 113.00 Tons | | style="text-align: right;" | 113.00 Tons | ||
Line 192: | Line 217: | ||
| 8-4630-00010/00 | | 8-4630-00010/00 | ||
|- | |- | ||
− | | 2010- | + | | 2010-S02 |
| Drill Cuttings (in Tons) | | Drill Cuttings (in Tons) | ||
| style="text-align: right;" | 1.50 Tons | | style="text-align: right;" | 1.50 Tons | ||
Line 198: | Line 223: | ||
| 100955 | | 100955 | ||
|- | |- | ||
− | | 2010- | + | | 2010-S02 |
| Drill Cuttings (in Tons) | | Drill Cuttings (in Tons) | ||
| style="text-align: right;" | 113.00 Tons | | style="text-align: right;" | 113.00 Tons | ||
Line 204: | Line 229: | ||
| NY # 02S17 | | NY # 02S17 | ||
|- | |- | ||
− | | 2010- | + | | 2010-S02 |
| Drill Cuttings (in Tons) | | Drill Cuttings (in Tons) | ||
| style="text-align: right;" | 19.70 Tons | | style="text-align: right;" | 19.70 Tons | ||
Line 210: | Line 235: | ||
| NY # 50S08 | | NY # 50S08 | ||
|- | |- | ||
− | | 2010- | + | | 2010-S02 |
| Drilling Fluid Waste (in Barrels) | | Drilling Fluid Waste (in Barrels) | ||
| style="text-align: right;" | 11,190.47 Bbl | | style="text-align: right;" | 11,190.47 Bbl | ||
Line 216: | Line 241: | ||
| PA0008451 | | PA0008451 | ||
|- | |- | ||
− | | 2010- | + | | 2010-S02 |
| Drilling Fluid Waste (in Barrels) | | Drilling Fluid Waste (in Barrels) | ||
| style="text-align: right;" | 138.10 Bbl | | style="text-align: right;" | 138.10 Bbl | ||
Line 222: | Line 247: | ||
| PA0101508 | | PA0101508 | ||
|- | |- | ||
− | | 2010- | + | | 2010-S02 |
| Drilling Fluid Waste (in Barrels) | | Drilling Fluid Waste (in Barrels) | ||
| style="text-align: right;" | 229.40 Bbl | | style="text-align: right;" | 229.40 Bbl | ||
Line 228: | Line 253: | ||
| WMGR119 | | WMGR119 | ||
|- | |- | ||
− | | 2010- | + | | 2010-S02 |
| Drilling Fluid Waste (in Barrels) | | Drilling Fluid Waste (in Barrels) | ||
| style="text-align: right;" | 1,309.50 Bbl | | style="text-align: right;" | 1,309.50 Bbl | ||
Line 234: | Line 259: | ||
| PA0026034 | | PA0026034 | ||
|- | |- | ||
− | | 2010- | + | | 2010-S02 |
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 210.46 Bbl | | style="text-align: right;" | 210.46 Bbl | ||
Line 240: | Line 265: | ||
| | | | ||
|- | |- | ||
− | | 2011- | + | | 2011-S01 |
| Basic Sediment (in Barrels) | | Basic Sediment (in Barrels) | ||
| style="text-align: right;" | 0.07 Bbl | | style="text-align: right;" | 0.07 Bbl | ||
Line 246: | Line 271: | ||
| 101534 | | 101534 | ||
|- | |- | ||
− | | 2011- | + | | 2011-S01 |
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 153.20 Bbl | | style="text-align: right;" | 153.20 Bbl | ||
Line 252: | Line 277: | ||
| | | | ||
|- | |- | ||
− | | 2011- | + | | 2011-S02 |
| Basic Sediment (in Barrels) | | Basic Sediment (in Barrels) | ||
| style="text-align: right;" | 0.52 Bbl | | style="text-align: right;" | 0.52 Bbl | ||
Line 258: | Line 283: | ||
| 101534 | | 101534 | ||
|- | |- | ||
− | | 2011- | + | | 2011-S02 |
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 78.29 Bbl | | style="text-align: right;" | 78.29 Bbl | ||
Line 264: | Line 289: | ||
| | | | ||
|- | |- | ||
− | | 2012- | + | | 2012-S01 |
| Basic Sediment (in Barrels) | | Basic Sediment (in Barrels) | ||
| style="text-align: right;" | 0.13 Bbl | | style="text-align: right;" | 0.13 Bbl | ||
Line 270: | Line 295: | ||
| 100081 | | 100081 | ||
|- | |- | ||
− | | 2012- | + | | 2012-S01 |
| Basic Sediment (in Barrels) | | Basic Sediment (in Barrels) | ||
| style="text-align: right;" | 0.79 Bbl | | style="text-align: right;" | 0.79 Bbl | ||
Line 276: | Line 301: | ||
| 101534 | | 101534 | ||
|- | |- | ||
− | | 2012- | + | | 2012-S01 |
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 77.38 Bbl | | style="text-align: right;" | 77.38 Bbl | ||
Line 282: | Line 307: | ||
| | | | ||
|- | |- | ||
− | | 2012- | + | | 2012-S02 |
| Basic Sediment (in Barrels) | | Basic Sediment (in Barrels) | ||
| style="text-align: right;" | 7.81 Bbl | | style="text-align: right;" | 7.81 Bbl | ||
Line 288: | Line 313: | ||
| THR029 | | THR029 | ||
|- | |- | ||
− | | 2012- | + | | 2012-S02 |
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 33.39 Bbl | | style="text-align: right;" | 33.39 Bbl | ||
Line 294: | Line 319: | ||
| WMGR123NE001 | | WMGR123NE001 | ||
|- | |- | ||
− | | 2012- | + | | 2012-S02 |
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 875.93 Bbl | | style="text-align: right;" | 875.93 Bbl | ||
Line 300: | Line 325: | ||
| | | | ||
|- | |- | ||
− | | 2013- | + | | 2013-S01 |
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 233.83 Bbl | | style="text-align: right;" | 233.83 Bbl | ||
Line 306: | Line 331: | ||
| WMGR123NE002 | | WMGR123NE002 | ||
|- | |- | ||
− | | 2013- | + | | 2013-S02 |
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 111.02 Bbl | | style="text-align: right;" | 111.02 Bbl | ||
Line 312: | Line 337: | ||
| WMGR123NE002 | | WMGR123NE002 | ||
|- | |- | ||
− | | 2014- | + | | 2014-S01 |
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 93.50 Bbl | | style="text-align: right;" | 93.50 Bbl | ||
Line 318: | Line 343: | ||
| WMGR123NE002 | | WMGR123NE002 | ||
|- | |- | ||
− | | 2014- | + | | 2014-S02 |
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 130.00 Bbl | | style="text-align: right;" | 130.00 Bbl | ||
Line 324: | Line 349: | ||
| WMGR123NE002 | | WMGR123NE002 | ||
|- | |- | ||
− | | 2015- | + | | 2015-S01 |
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 63.00 Bbl | | style="text-align: right;" | 63.00 Bbl | ||
Line 330: | Line 355: | ||
| WMGR123NE002 | | WMGR123NE002 | ||
|- | |- | ||
− | | 2015- | + | | 2015-S02 |
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 54.63 Bbl | | style="text-align: right;" | 54.63 Bbl | ||
Line 336: | Line 361: | ||
| WMGR123NE001 | | WMGR123NE001 | ||
|- | |- | ||
− | | 2015- | + | | 2015-S02 |
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 81.15 Bbl | | style="text-align: right;" | 81.15 Bbl | ||
Line 342: | Line 367: | ||
| WMGR123NE002 | | WMGR123NE002 | ||
|- | |- | ||
− | | 2016- | + | | 2016-S01 |
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
| style="text-align: right;" | 53.28 Bbl | | style="text-align: right;" | 53.28 Bbl | ||
Line 348: | Line 373: | ||
| WMGR123NE002 | | WMGR123NE002 | ||
|- | |- | ||
− | | 2016- | + | | 2016-S02 |
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
| style="text-align: right;" | 103.64 Bbl | | style="text-align: right;" | 103.64 Bbl | ||
Line 354: | Line 379: | ||
| WMGR123NE002 | | WMGR123NE002 | ||
|- | |- | ||
− | | 2017- | + | | 2017-M02 |
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
| style="text-align: right;" | 35.63 Bbl | | style="text-align: right;" | 35.63 Bbl | ||
Line 360: | Line 385: | ||
| WMGR123NE002 | | WMGR123NE002 | ||
|- | |- | ||
− | | 2017- | + | | 2017-M05 |
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
| style="text-align: right;" | 35.22 Bbl | | style="text-align: right;" | 35.22 Bbl | ||
Line 366: | Line 391: | ||
| WMGR123NE002 | | WMGR123NE002 | ||
|- | |- | ||
− | | 2017- | + | | 2017-M09 |
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
| style="text-align: right;" | 39.86 Bbl | | style="text-align: right;" | 39.86 Bbl | ||
Line 372: | Line 397: | ||
| WMGR123NC018 | | WMGR123NC018 | ||
|- | |- | ||
− | | 2017- | + | | 2017-M10 |
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
| style="text-align: right;" | 1.97 Bbl | | style="text-align: right;" | 1.97 Bbl | ||
Line 378: | Line 403: | ||
| WMGR123NC018 | | WMGR123NC018 | ||
|- | |- | ||
− | | 2018- | + | | 2018-M02 |
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
| style="text-align: right;" | 8.98 Bbl | | style="text-align: right;" | 8.98 Bbl | ||
Line 384: | Line 409: | ||
| WMGR123NE002 | | WMGR123NE002 | ||
|- | |- | ||
− | | 2018- | + | | 2018-M03 |
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
| style="text-align: right;" | 6.10 Bbl | | style="text-align: right;" | 6.10 Bbl | ||
Line 390: | Line 415: | ||
| WMGR123NE002 | | WMGR123NE002 | ||
|- | |- | ||
− | | 2018- | + | | 2018-M05 |
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
| style="text-align: right;" | 23.98 Bbl | | style="text-align: right;" | 23.98 Bbl | ||
Line 396: | Line 421: | ||
| WMGR123NE002 | | WMGR123NE002 | ||
|- | |- | ||
− | | 2019- | + | | 2019-M01 |
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
| style="text-align: right;" | 21.92 Bbl | | style="text-align: right;" | 21.92 Bbl | ||
Line 402: | Line 427: | ||
| WMGR123NE002 | | WMGR123NE002 | ||
|- | |- | ||
− | | 2019- | + | | 2019-M03 |
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
| style="text-align: right;" | 11.62 Bbl | | style="text-align: right;" | 11.62 Bbl | ||
Line 427: | Line 452: | ||
| 1806421 | | 1806421 | ||
| Primary Facility | | Primary Facility | ||
− | | 06 | + | | 2009-06-19 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 434: | Line 459: | ||
| 1811406 | | 1811406 | ||
| Primary Facility | | Primary Facility | ||
− | | 07 | + | | 2009-07-07 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 441: | Line 466: | ||
| 1845001 | | 1845001 | ||
| Primary Facility | | Primary Facility | ||
− | | 10 | + | | 2009-10-19 |
| Follow-up Inspection | | Follow-up Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 448: | Line 473: | ||
| 1852379 | | 1852379 | ||
| Primary Facility | | Primary Facility | ||
− | | 12 | + | | 2009-12-23 |
| Follow-up Inspection | | Follow-up Inspection | ||
| Violation(s) Noted | | Violation(s) Noted | ||
Line 455: | Line 480: | ||
| 1884555 | | 1884555 | ||
| Primary Facility | | Primary Facility | ||
− | | 01 | + | | 2010-01-05 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 462: | Line 487: | ||
| 1884582 | | 1884582 | ||
| Primary Facility | | Primary Facility | ||
− | | 01 | + | | 2010-01-15 |
| Follow-up Inspection | | Follow-up Inspection | ||
| Violation(s) Noted | | Violation(s) Noted | ||
Line 469: | Line 494: | ||
| 1890365 | | 1890365 | ||
| Primary Facility | | Primary Facility | ||
− | | 05 | + | | 2010-05-24 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 476: | Line 501: | ||
| 2007354 | | 2007354 | ||
| Primary Facility | | Primary Facility | ||
− | | 09 | + | | 2011-09-01 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 483: | Line 508: | ||
| 2009185 | | 2009185 | ||
| Primary Facility | | Primary Facility | ||
− | | 09 | + | | 2011-09-21 |
| Follow-up Inspection | | Follow-up Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 490: | Line 515: | ||
| 2009288 | | 2009288 | ||
| Primary Facility | | Primary Facility | ||
− | | 10 | + | | 2011-10-05 |
| Follow-up Inspection | | Follow-up Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 497: | Line 522: | ||
| 2009432 | | 2009432 | ||
| Primary Facility | | Primary Facility | ||
− | | 10 | + | | 2011-10-06 |
| Follow-up Inspection | | Follow-up Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 504: | Line 529: | ||
| 2021729 | | 2021729 | ||
| Primary Facility | | Primary Facility | ||
− | | 10 | + | | 2011-10-12 |
| Follow-up Inspection | | Follow-up Inspection | ||
| Violation(s) & Outstanding Violations | | Violation(s) & Outstanding Violations | ||
Line 511: | Line 536: | ||
| 2021759 | | 2021759 | ||
| Primary Facility | | Primary Facility | ||
− | | 10 | + | | 2011-10-12 |
| Follow-up Inspection | | Follow-up Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 518: | Line 543: | ||
| 2024043 | | 2024043 | ||
| Primary Facility | | Primary Facility | ||
− | | 10 | + | | 2011-10-26 |
| Follow-up Inspection | | Follow-up Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 525: | Line 550: | ||
| 2024047 | | 2024047 | ||
| Primary Facility | | Primary Facility | ||
− | | 10 | + | | 2011-10-27 |
| Follow-up Inspection | | Follow-up Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 532: | Line 557: | ||
| 2024055 | | 2024055 | ||
| Primary Facility | | Primary Facility | ||
− | | 11 | + | | 2011-11-29 |
| Administrative/File Review | | Administrative/File Review | ||
| No Violations Noted | | No Violations Noted | ||
Line 539: | Line 564: | ||
| 2024675 | | 2024675 | ||
| Primary Facility | | Primary Facility | ||
− | | 10 | + | | 2011-10-13 |
| Follow-up Inspection | | Follow-up Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 546: | Line 571: | ||
| 2024680 | | 2024680 | ||
| Primary Facility | | Primary Facility | ||
− | | 10 | + | | 2011-10-28 |
| Follow-up Inspection | | Follow-up Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 553: | Line 578: | ||
| 2024710 | | 2024710 | ||
| Primary Facility | | Primary Facility | ||
− | | 10 | + | | 2011-10-31 |
| Follow-up Inspection | | Follow-up Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 560: | Line 585: | ||
| 2347642 | | 2347642 | ||
| Primary Facility | | Primary Facility | ||
− | | 02 | + | | 2015-02-25 |
| Routine/Partial Inspection | | Routine/Partial Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 600: | Line 625: | ||
| 587048 | | 587048 | ||
| 01/15/2010 | | 01/15/2010 | ||
− | | | + | | 2010-01-15 |
| 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used | | 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used | ||
| Administrative | | Administrative | ||
Line 608: | Line 633: | ||
| 625363 | | 625363 | ||
| 10/12/2011 | | 10/12/2011 | ||
− | | | + | | 2011-10-12 |
| 402POTNLPOLL - There is a potential for polluting substance(s) reaching Waters of the Commonwealth and may require a permit. | | 402POTNLPOLL - There is a potential for polluting substance(s) reaching Waters of the Commonwealth and may require a permit. | ||
| Environmental Health & Safety | | Environmental Health & Safety | ||
Line 616: | Line 641: | ||
| 625364 | | 625364 | ||
| 10/12/2011 | | 10/12/2011 | ||
− | | | + | | 2011-10-12 |
| 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances. | | 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances. | ||
| Administrative | | Administrative | ||
Line 624: | Line 649: | ||
| 625365 | | 625365 | ||
| 10/12/2011 | | 10/12/2011 | ||
− | | | + | | 2011-10-12 |
| SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | ||
| Environmental Health & Safety | | Environmental Health & Safety | ||
Line 648: | Line 673: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==References== | ==References== | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Pennsylvania Wells]] | [[Category:Pennsylvania Wells]] |
Well ID: 37-115-20121 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.711919,"lon":-75.900936,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Springville Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 149128 | |
Farm/Lease Name: R HULL 2H | |
License Status: Active | |
Spud Date: 2009-06-09 | |
Permit Date: 2009-03-06 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 41.711919 | |
Longitude: -75.900936 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 | |
2010 | CABOT OIL & GAS CORP | 796,201.50 | 191 | 0.00 | 0 | 0.00 | 0 |
2011 | CABOT OIL & GAS CORP | 770,528.56 | 280 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 656,455.43 | 336 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 369,797.26 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 265,149.02 | 353 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 157,562.74 | 306 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 214,684.80 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 159,947.38 | 362 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 140,323.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 32,771.00 | 90 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2010-S02 | Basic Sediment (in Barrels) | 2.59 Bbl | LANDFILL | 101534 |
2010-S02 | Drill Cuttings (in Tons) | 69.50 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101247 |
2010-S02 | Drill Cuttings (in Tons) | 113.00 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 8-4630-00010/00 |
2010-S02 | Drill Cuttings (in Tons) | 1.50 Tons | LANDFILL | 100955 |
2010-S02 | Drill Cuttings (in Tons) | 113.00 Tons | LANDFILL | NY # 02S17 |
2010-S02 | Drill Cuttings (in Tons) | 19.70 Tons | LANDFILL | NY # 50S08 |
2010-S02 | Drilling Fluid Waste (in Barrels) | 11,190.47 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
2010-S02 | Drilling Fluid Waste (in Barrels) | 138.10 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010-S02 | Drilling Fluid Waste (in Barrels) | 229.40 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2010-S02 | Drilling Fluid Waste (in Barrels) | 1,309.50 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026034 |
2010-S02 | Produced Fluid (in Barrels) | 210.46 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011-S01 | Basic Sediment (in Barrels) | 0.07 Bbl | LANDFILL | 101534 |
2011-S01 | Produced Fluid (in Barrels) | 153.20 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011-S02 | Basic Sediment (in Barrels) | 0.52 Bbl | LANDFILL | 101534 |
2011-S02 | Produced Fluid (in Barrels) | 78.29 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012-S01 | Basic Sediment (in Barrels) | 0.13 Bbl | LANDFILL | 100081 |
2012-S01 | Basic Sediment (in Barrels) | 0.79 Bbl | LANDFILL | 101534 |
2012-S01 | Produced Fluid (in Barrels) | 77.38 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012-S02 | Basic Sediment (in Barrels) | 7.81 Bbl | LANDFILL | THR029 |
2012-S02 | Produced Fluid (in Barrels) | 33.39 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2012-S02 | Produced Fluid (in Barrels) | 875.93 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013-S01 | Produced Fluid (in Barrels) | 233.83 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2013-S02 | Produced Fluid (in Barrels) | 111.02 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014-S01 | Produced Fluid (in Barrels) | 93.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014-S02 | Produced Fluid (in Barrels) | 130.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015-S01 | Produced Fluid (in Barrels) | 63.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015-S02 | Produced Fluid (in Barrels) | 54.63 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2015-S02 | Produced Fluid (in Barrels) | 81.15 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016-S01 | Produced Fluid (in Barrels) RWC 802 | 53.28 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016-S02 | Produced Fluid (in Barrels) RWC 802 | 103.64 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017-M02 | Produced Fluid (in Barrels) RWC 802 | 35.63 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017-M05 | Produced Fluid (in Barrels) RWC 802 | 35.22 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017-M09 | Produced Fluid (in Barrels) RWC 802 | 39.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017-M10 | Produced Fluid (in Barrels) RWC 802 | 1.97 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-M02 | Produced Fluid (in Barrels) RWC 802 | 8.98 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018-M03 | Produced Fluid (in Barrels) RWC 802 | 6.10 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018-M05 | Produced Fluid (in Barrels) RWC 802 | 23.98 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019-M01 | Produced Fluid (in Barrels) RWC 802 | 21.92 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019-M03 | Produced Fluid (in Barrels) RWC 802 | 11.62 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1806421 | Primary Facility | 2009-06-19 | Drilling/Alteration | No Violations Noted | Patterson Rig #154 on Site. Depth of drilling at 2893'. According to Company Man, they encountered water from surface. They drilled with mud in surface hole due to excessive water. At time of inspection, drilling with air using 8 3/4" bit. Will run 5-1/2" casing to TD of 10,430'. |
1811406 | Primary Facility | 2009-07-07 | Drilling/Alteration | No Violations Noted | Drill rig on site is Patterson Rig #154. Depth of drilling at time of inspection was TD -10,136'. According to Company Man, open-hole logs were run in the hole. The drill string was being tripped out at the time of inspection. The Company Man indicated they will likely start running 5-1/2 casing to TD sometime tomorrow. |
1845001 | Primary Facility | 2009-10-19 | Follow-up Inspection | No Violations Noted | At the time of inspection there was no activity on site. The well has not been fracced yet. There is no evidence of gas bubbling in the cellar of the well. |
1852379 | Primary Facility | 2009-12-23 | Follow-up Inspection | Violation(s) Noted | My inspection revealed an unpermitted discharge of stimulation fluids occurred at the site. This is a violation of 25 PA Code 78.54 General Requirements, which provides, in part: "The well operator shall control and dispose of fluids, residual waste and drill cuttings, including tophole water, brines, drilling fluids, drilling muds, stimulation fluids, well servicing fluids, oil, production fluids and drill cuttings in a manner that prevents pollution of the waters of this Commonwealth..." |
1884555 | Primary Facility | 2010-01-05 | Routine/Complete Inspection | No Violations Noted | |
1884582 | Primary Facility | 2010-01-15 | Follow-up Inspection | Violation(s) Noted | This well is currently being hydrofractured. The Hull 1H and 3V are also on this pad. On site to evaluate a self reported spill of fluid. The operator has reported that approximately 1 bbl of brackish fluid escaped secondary containment and impacted the ground. The fluid was excavated by the time I reached the site. It was recommend that the operator use the Act 2 attainment standards for clean-up. No E/S problems were noted while on site. Contact Mike O'Donnell at 570.826.2300 with questions. |
1890365 | Primary Facility | 2010-05-24 | Routine/Complete Inspection | No Violations Noted | |
2007354 | Primary Facility | 2011-09-01 | Routine/Complete Inspection | No Violations Noted | |
2009185 | Primary Facility | 2011-09-21 | Follow-up Inspection | No Violations Noted | |
2009288 | Primary Facility | 2011-10-05 | Follow-up Inspection | No Violations Noted | |
2009432 | Primary Facility | 2011-10-06 | Follow-up Inspection | No Violations Noted | |
2021729 | Primary Facility | 2011-10-12 | Follow-up Inspection | Violation(s) & Outstanding Violations | I arrived at the site at 10:20 AM to conduct a Follow-Up Inspection regarding the observation of daylighted liner noted in five (5) areas on the surface of the well pad during the 9-1-11 inspection conducted bty the Department and potentially the apperance of drilling residuals on the surface of the well pad during the 9-21-11 inspection. The outstanding violation of Pollution prevention measure, Section 402 Clean Streams Law can be referenced in the 9-1-11, 9-2-11, 9-21-11, 10-5-11 and 10-6-11 inspection reports. The new violations observed during the inspection are, Section 25 Pa. Code §78.56(a) and section 301 of the PA Solid Waste Management Act, 35 P.S. §6018.301, due to the compromised liner intergrity observed during the excavation of the test pits and the drilling residuals contacting the surface of the ground. |
2021759 | Primary Facility | 2011-10-12 | Follow-up Inspection | No Violations Noted | Please refer to R Hull 1H well inspection report regarding violations and outstanding violations. |
2024043 | Primary Facility | 2011-10-26 | Follow-up Inspection | No Violations Noted | Violations and specifics pertaining to this inspection report can be associated with the R Hull 1H inspection report. Permit Number is 115-20122. |
2024047 | Primary Facility | 2011-10-27 | Follow-up Inspection | No Violations Noted | Violations and specifics associated with this inspection report can be referred to in the R Hull 1H inspection report. Permit Number is 115-20122. |
2024055 | Primary Facility | 2011-11-29 | Administrative/File Review | No Violations Noted | Violations and specifics pertaining to this inspection report can be referred to in the R Hull 1H inspection report. Permi number is 115-20122. |
2024675 | Primary Facility | 2011-10-13 | Follow-up Inspection | No Violations Noted | Violations and specifics associated with this inspection report can be referred to in the R Hull 1H 10-12-11 inspection report. Permit number is 115-20122. |
2024680 | Primary Facility | 2011-10-28 | Follow-up Inspection | No Violations Noted | Violations ansd specifics associated with this inspection report can be referred to in the R Hull 1H 10-28-11 inspection report. Permit number is 115-20122. |
2024710 | Primary Facility | 2011-10-31 | Follow-up Inspection | No Violations Noted | Violations and specifics associated with this inspection report can be referred to in the R Hull 1H 10-31-11 inspection report. Permit number is 115-20122. |
2347642 | Primary Facility | 2015-02-25 | Routine/Partial Inspection | No Violations Noted | The Department was on site at the R Hull Well Site located at 1197 Phillips Road Springville Township, to conduct a Routine Partial Inspection. During the Department’s inspection, the E&S Plan was on site and the E&S Inspection log showed that Sam Wiernusz (TEC) conducted a weekly inspection on 2/25/15. At the time of the inspection, the site was snow covered. No obvious E&S issues were observed. |
2534943 | Primary Facility | 2016-11-04 | Routine/Complete Inspection | No Violations Noted | |
2570365 | Primary Facility | 2017-03-06 | Routine/Complete Inspection | No Violations Noted | Prior to conducting the site inspection I reviewed the Well Site Restoration Report which was submitted on 16OCT2015. There was activity occurring at the site during the inspection. |
2601260 | Primary Facility | 2017-06-06 | Administrative/File Review | No Violations Noted |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1884582 | 587048 | 01/15/2010 | 2010-01-15 | 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used | Administrative | 78.56 Failure to contain a pollutional substance in a lined pit or tank |
2021729 | 625363 | 10/12/2011 | 2011-10-12 | 402POTNLPOLL - There is a potential for polluting substance(s) reaching Waters of the Commonwealth and may require a permit. | Environmental Health & Safety | Viols entered at this insp being addressed thru further action entered at R Hull 1H Permit 115-20122. MBC 12/1/2011 |
2021729 | 625364 | 10/12/2011 | 2011-10-12 | 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances. | Administrative | Viols entered at this insp being addressed thru further action entered at R Hull 1H Permit 115-20122. MBC 12/1/2011 |
2021729 | 625365 | 10/12/2011 | 2011-10-12 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety | Viols entered at this insp being addressed thru further action entered at R Hull 1H Permit 115-20122. MBC 12/1/2011 |
For data sources see[6]