X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-115-22448"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-115-22448
 
| Well ID: 37-115-22448
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.7956, -75.735117 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.7956, -75.735117 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 09/25/2018
+
| Spud Date: 2018-09-25
 
|-
 
|-
| Permit Date: 2/23/2018
+
| Permit Date: 2018-02-23
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 84: Line 109:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2018-09
+
| 2018-M09
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 2.44 Tons
 
| style="text-align: right;" | 2.44 Tons
Line 90: Line 115:
 
| 101247
 
| 101247
 
|-
 
|-
| 2018-10
+
| 2018-M10
 
| Drill Cuttings (in Tons) RWC 810
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 803.90 Tons
 
| style="text-align: right;" | 803.90 Tons
Line 96: Line 121:
 
| 101247
 
| 101247
 
|-
 
|-
| 2018-10
+
| 2018-M10
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 15.33 Tons
 
| style="text-align: right;" | 15.33 Tons
Line 102: Line 127:
 
| 101247
 
| 101247
 
|-
 
|-
| 2018-11
+
| 2018-M11
 
| Drill Cuttings (in Tons) RWC 810
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 349.28 Tons
 
| style="text-align: right;" | 349.28 Tons
Line 108: Line 133:
 
| 101247
 
| 101247
 
|-
 
|-
| 2018-11
+
| 2018-M11
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 17.15 Tons
 
| style="text-align: right;" | 17.15 Tons
Line 114: Line 139:
 
| 101247
 
| 101247
 
|-
 
|-
| 2018-12
+
| 2018-M12
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 22.66 Tons
 
| style="text-align: right;" | 22.66 Tons
Line 196: Line 221:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 12:25, 2 August 2019

Well Details

Well ID: 37-115-22448
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Harford Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 146325
Farm/Lease Name: DELUCIA R 010
License Status: Active
Spud Date: 2018-09-25
Permit Date: 2018-02-23
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.7956
Longitude: -75.735117

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2018-M09 Synthetic Liner Materials (in Tons) RWC 806 2.44 Tons LANDFILL 101247
2018-M10 Drill Cuttings (in Tons) RWC 810 803.90 Tons LANDFILL 101247
2018-M10 Synthetic Liner Materials (in Tons) RWC 806 15.33 Tons LANDFILL 101247
2018-M11 Drill Cuttings (in Tons) RWC 810 349.28 Tons LANDFILL 101247
2018-M11 Synthetic Liner Materials (in Tons) RWC 806 17.15 Tons LANDFILL 101247
2018-M12 Synthetic Liner Materials (in Tons) RWC 806 22.66 Tons LANDFILL 101247

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2779572 Primary Facility 2018-09-25 Drilling/Alteration No Violations Noted At time of inspection.

On site for a new spud inspection. Met with Brett Wambold of Selman & Associates. United Drilling was on site to drill and run the conductor pipe in the 10H and 14H wells. The 14H was at TD of 98' and the conductor pipe will be run to 96'. The 10H was at a depth of 48' and will be the same as the 14H. There are three existing wells on site, the 1H, 2H and 3H that are temporarily plugged. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2797839 Primary Facility 2018-11-02 Drilling/Alteration No Violations Noted At time of inspection.

Met with company man Aaron Wilhite. Precision 532 was on site and was pulling there drill pipe and will run there production pipe. There are three existing wells on site that are temporarily plugged and two new wells to be drilled. They are on the first of the two wells. The TD for the well is 12008'. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

For data sources see[6]

References