X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-007-20396"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-007-20396
 
| Well ID: 37-007-20396
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.739631, -80.1691 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.739631, -80.1691 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 09/11/2013
+
| Spud Date: 2013-09-11
 
|-
 
|-
| Permit Date: 7/8/2013
+
| Permit Date: 2013-07-08
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 2014-02-19
 +
| 2014-03-01
 +
| style="text-align: right;" | 5140
 +
| style="text-align: right;" | 13,270,000.0
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="19"| 1
 +
| rowspan="3"| EC6116A
 +
| rowspan="3"| Nalco
 +
| rowspan="3"| Biocide
 +
| Polyethylene Glycol
 +
| 25322-68-3
 +
| style="text-align: right;" | 60
 +
| style="text-align: right;" | 0.00667149
 +
| style="text-align: right;" | 8481.36
 +
|-
 +
| Dibromoacetonitrile
 +
| 3252-43-5
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.000555958
 +
| style="text-align: right;" | 706.78
 +
|-
 +
| 2,2-Dibromo-3-nitrilopropionamide
 +
| 10222-01-2
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00333575
 +
| style="text-align: right;" | 4240.68
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Hydrochloric Acid (7.5%)
 +
| rowspan="1"| Axiall
 +
| rowspan="1"| Acidizing
 +
| Hydrogen Chloride
 +
| 7647-01-0
 +
| style="text-align: right;" | 40
 +
| style="text-align: right;" | 1.1709
 +
| style="text-align: right;" | 1,488,540.0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Scale Hib A
 +
| rowspan="1"| Nalco
 +
| rowspan="1"| Scale Inhibitor
 +
| Ethylene Glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00329451
 +
| style="text-align: right;" | 4188.26
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Sand (Proppant)
 +
| rowspan="1"| Sargent
 +
| rowspan="1"| Proppant
 +
| Silica
 +
| 14808-60-7
 +
| style="text-align: right;" | 99.9
 +
| style="text-align: right;" | 9.83669
 +
| style="text-align: right;" | 12,505,200.0
 +
|-
 +
|- valign="top"
 +
| rowspan="3"| I-7L
 +
| rowspan="3"| Weatherford
 +
| rowspan="3"| Iron Control
 +
| Triethanolamine Hydroxyacetate
 +
| 68299-02-5
 +
| style="text-align: right;" | 20
 +
| style="text-align: right;" | 0.00212445
 +
| style="text-align: right;" | 2700.78
 +
|-
 +
| Glycolic Acid
 +
| 79-14-1
 +
| style="text-align: right;" | 2.5
 +
| style="text-align: right;" | 0.000265556
 +
| style="text-align: right;" | 337.597
 +
|-
 +
| Ethylene Glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 20
 +
| style="text-align: right;" | 0.00212445
 +
| style="text-align: right;" | 2700.78
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| WGA-3
 +
| rowspan="1"| PfP Technology
 +
| rowspan="1"| Water Viscosifier
 +
| Guar Gum
 +
| 9000-30-0
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.00125857
 +
| style="text-align: right;" | 1600
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Water
 +
| rowspan="1"| PennEnergy Resources
 +
| rowspan="1"| Carrier/Base Fluid
 +
| Water
 +
| 7732-18-5
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 87.1076
 +
| style="text-align: right;" | 110,738,000.0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Unislik ST50
 +
| rowspan="1"| CESI
 +
| rowspan="1"| Friction Reducer
 +
| Petroleum Distillates, Hydrotreated Light
 +
| 64742-47-8
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.0253226
 +
| style="text-align: right;" | 32192.2
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| LEB 10X
 +
| rowspan="1"| Weatherford
 +
| rowspan="1"| Gel Breaker
 +
| Ethylene Glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 40
 +
| style="text-align: right;" | 0.00001217
 +
| style="text-align: right;" | 15.475
 +
|-
 +
|- valign="top"
 +
| rowspan="6"| Unihib G
 +
| rowspan="6"| GeoSafe
 +
| rowspan="6"| Acid Corrosion Inhibitor
 +
| Acetophenone
 +
| 98-86-2
 +
| style="text-align: right;" | 1
 +
| style="text-align: right;" | 0.00000189
 +
| style="text-align: right;" | 2.406
 +
|-
 +
| Thiourea
 +
| 62-56-6
 +
| style="text-align: right;" | 1
 +
| style="text-align: right;" | 0.00000189
 +
| style="text-align: right;" | 2.406
 +
|-
 +
| Glycol Ether
 +
| 112-34-5
 +
| style="text-align: right;" | 60
 +
| style="text-align: right;" | 0.000113548
 +
| style="text-align: right;" | 144.352
 +
|-
 +
| Ethoxylated Alcohol
 +
| 68002-97-1
 +
| style="text-align: right;" | 35
 +
| style="text-align: right;" | 0.00006624
 +
| style="text-align: right;" | 84.205
 +
|-
 +
| Methanol
 +
| 67-56-1
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.00000946
 +
| style="text-align: right;" | 12.029
 +
|-
 +
| Formaldehyde
 +
| 50-00-0
 +
| style="text-align: right;" | 1
 +
| style="text-align: right;" | 0.00000189
 +
| style="text-align: right;" | 2.406
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =FracFocus Fracking Chemicals Database
 +
| date = 2019-04-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-06-19 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 133: Line 324:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 138: Line 330:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2013-2
+
| 2013
| Drill Cuttings (in Tons)
+
| [[PENNENERGY RESOURCES LLC]]
| style="text-align: right;" | 752.00 Tons
 
| LANDFILL
 
| CID # 28726
 
|-
 
| 2013-2
 
 
| Drilling Fluid Waste (in Barrels)
 
| Drilling Fluid Waste (in Barrels)
 
| style="text-align: right;" | 3,835.00 Bbl
 
| style="text-align: right;" | 3,835.00 Bbl
Line 150: Line 337:
 
| EPA ID: 748-163
 
| EPA ID: 748-163
 
|-
 
|-
| 2014-1
+
| 2013
 +
| [[PENNENERGY RESOURCES LLC]]
 
| Drill Cuttings (in Tons)
 
| Drill Cuttings (in Tons)
| style="text-align: right;" | 25.75 Tons
+
| style="text-align: right;" | 752.00 Tons
 
| LANDFILL
 
| LANDFILL
 
| CID # 28726
 
| CID # 28726
 
|-
 
|-
| 2014-1
+
| 2014
 +
| [[PENNENERGY RESOURCES LLC]]
 
| Fracturing Fluid Waste (in Tons)
 
| Fracturing Fluid Waste (in Tons)
 
| style="text-align: right;" | 47.30 Tons
 
| style="text-align: right;" | 47.30 Tons
Line 162: Line 351:
 
| CID # 28726
 
| CID # 28726
 
|-
 
|-
| 2015-2
+
| 2014
 +
| [[PENNENERGY RESOURCES LLC]]
 +
| Drill Cuttings (in Tons)
 +
| style="text-align: right;" | 25.75 Tons
 +
| LANDFILL
 +
| CID # 28726
 +
|-
 +
| 2015
 +
| [[PENNENERGY RESOURCES LLC]]
 
| Servicing Fluid (in Barrels)
 
| Servicing Fluid (in Barrels)
 
| style="text-align: right;" | 21.00 Bbl
 
| style="text-align: right;" | 21.00 Bbl
Line 168: Line 365:
 
| CID # 28726
 
| CID # 28726
 
|-
 
|-
| 2016-1
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[PENNENERGY RESOURCES LLC]]
| style="text-align: right;" | 2,573.65 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2016-2
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 72.40 Bbl
 
| style="text-align: right;" | 72.40 Bbl
Line 180: Line 372:
 
| EPA ID: 748-163
 
| EPA ID: 748-163
 
|-
 
|-
| 2016-2
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[PENNENERGY RESOURCES LLC]]
| style="text-align: right;" | 1,225.79 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-22403
 
|-
 
| 2016-2
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 428.81 Bbl
 
| style="text-align: right;" | 428.81 Bbl
Line 192: Line 379:
 
| 34-155-23196
 
| 34-155-23196
 
|-
 
|-
| 2016-2
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[PENNENERGY RESOURCES LLC]]
| style="text-align: right;" | 483.10 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-23223
 
|-
 
| 2016-2
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 1,898.24 Bbl
+
| style="text-align: right;" | 4,471.89 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2017-01
+
| 2016
 +
| [[PENNENERGY RESOURCES LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 600.55 Bbl
+
| style="text-align: right;" | 1,225.79 Bbl
| REUSE (AT WELL PAD)
+
| INJECTION DISPOSAL WELL
|  
+
| 34-155-22403
 
|-
 
|-
| 2017-02
+
| 2016
 +
| [[PENNENERGY RESOURCES LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 574.33 Bbl
+
| style="text-align: right;" | 483.10 Bbl
| REUSE (AT WELL PAD)
+
| INJECTION DISPOSAL WELL
|  
+
| 34-155-23223
 
|-
 
|-
| 2017-03
+
| 2017
 +
| [[PENNENERGY RESOURCES LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 72.00 Bbl
+
| style="text-align: right;" | 3,302.13 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2017-04
+
| 2018
 +
| [[PENNENERGY RESOURCES LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 539.00 Bbl
+
| style="text-align: right;" | 1,660.73 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2017-05
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[PENNENERGY RESOURCES LLC]]
| style="text-align: right;" | 504.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 73.10 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 125.92 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 275.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 38.16 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 37.85 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 383.82 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 78.40 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 355.83 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 305.77 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 110.12 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 265.29 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 76.64 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 77.75 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 77.54 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 43.43 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 195.54 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 74.59 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 41.13 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 37.10 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-01
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 189.17 Bbl
+
| style="text-align: right;" | 567.87 Bbl
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 38.29 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 340.41 Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
Line 385: Line 440:
 
| 2201875
 
| 2201875
 
| Primary Facility
 
| Primary Facility
| 09/05/2013
+
| 2013-09-05
 
| Administrative/File Review
 
| Administrative/File Review
 
| No Violations Noted
 
| No Violations Noted
Line 392: Line 447:
 
| 2205409
 
| 2205409
 
| Primary Facility
 
| Primary Facility
| 09/18/2013
+
| 2013-09-18
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 399: Line 454:
 
| 2206056
 
| 2206056
 
| Primary Facility
 
| Primary Facility
| 09/11/2013
+
| 2013-09-11
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 406: Line 461:
 
| 2206058
 
| 2206058
 
| Primary Facility
 
| Primary Facility
| 09/18/2013
+
| 2013-09-18
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 413: Line 468:
 
| 2212252
 
| 2212252
 
| Primary Facility
 
| Primary Facility
| 10/08/2013
+
| 2013-10-08
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 420: Line 475:
 
| 2213881
 
| 2213881
 
| Primary Facility
 
| Primary Facility
| 10/16/2013
+
| 2013-10-16
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 427: Line 482:
 
| 2223187
 
| 2223187
 
| Primary Facility
 
| Primary Facility
| 11/14/2013
+
| 2013-11-14
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 434: Line 489:
 
| 2227170
 
| 2227170
 
| Primary Facility
 
| Primary Facility
| 11/25/2013
+
| 2013-11-25
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 441: Line 496:
 
| 2227173
 
| 2227173
 
| Primary Facility
 
| Primary Facility
| 12/05/2013
+
| 2013-12-05
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 448: Line 503:
 
| 2231780
 
| 2231780
 
| Primary Facility
 
| Primary Facility
| 12/11/2013
+
| 2013-12-11
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 455: Line 510:
 
| 2232278
 
| 2232278
 
| Primary Facility
 
| Primary Facility
| 10/10/2013
+
| 2013-10-10
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 462: Line 517:
 
| 2232813
 
| 2232813
 
| Primary Facility
 
| Primary Facility
| 11/05/2013
+
| 2013-11-05
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 469: Line 524:
 
| 2232823
 
| 2232823
 
| Primary Facility
 
| Primary Facility
| 11/12/2013
+
| 2013-11-12
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 476: Line 531:
 
| 2236882
 
| 2236882
 
| Primary Facility
 
| Primary Facility
| 01/13/2014
+
| 2014-01-13
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 483: Line 538:
 
| 2247357
 
| 2247357
 
| Primary Facility
 
| Primary Facility
| 01/02/2014
+
| 2014-01-02
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 490: Line 545:
 
| 2247360
 
| 2247360
 
| Primary Facility
 
| Primary Facility
| 01/14/2014
+
| 2014-01-14
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 497: Line 552:
 
| 2251836
 
| 2251836
 
| Primary Facility
 
| Primary Facility
| 02/11/2014
+
| 2014-02-11
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 504: Line 559:
 
| 2255752
 
| 2255752
 
| Primary Facility
 
| Primary Facility
| 03/17/2014
+
| 2014-03-17
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 511: Line 566:
 
| 2255756
 
| 2255756
 
| Primary Facility
 
| Primary Facility
| 03/13/2014
+
| 2014-03-13
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 518: Line 573:
 
| 2257676
 
| 2257676
 
| Primary Facility
 
| Primary Facility
| 03/20/2014
+
| 2014-03-20
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 525: Line 580:
 
| 2259858
 
| 2259858
 
| Primary Facility
 
| Primary Facility
| 04/01/2014
+
| 2014-04-01
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 532: Line 587:
 
| 2275106
 
| 2275106
 
| Primary Facility
 
| Primary Facility
| 04/07/2014
+
| 2014-04-07
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 539: Line 594:
 
| 2361477
 
| 2361477
 
| Primary Facility
 
| Primary Facility
| 04/10/2015
+
| 2015-04-10
 
| Routine/Partial Inspection
 
| Routine/Partial Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 546: Line 601:
 
| 2372410
 
| 2372410
 
| Primary Facility
 
| Primary Facility
| 04/20/2015
+
| 2015-04-20
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 553: Line 608:
 
| 2374329
 
| 2374329
 
| Primary Facility
 
| Primary Facility
| 05/26/2015
+
| 2015-05-26
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 560: Line 615:
 
| 2391271
 
| 2391271
 
| Primary Facility
 
| Primary Facility
| 07/17/2015
+
| 2015-07-17
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 567: Line 622:
 
| 2392557
 
| 2392557
 
| Primary Facility
 
| Primary Facility
| 07/17/2015
+
| 2015-07-17
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 658: Line 713:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
| 1
 
| 02/19/2014
 
| 03/01/2014
 
| style="text-align: right;" | 5140
 
| style="text-align: right;" | 13,270,000.0
 
| style="text-align: right;" | 0
 
|-
 
|}
 
==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|- valign="top"
 
| rowspan="19"| 1
 
| rowspan="3"| EC6116A
 
| rowspan="3"| Nalco
 
| rowspan="3"| Biocide
 
| Polyethylene Glycol
 
| 25322-68-3
 
| style="text-align: right;" | 60
 
| style="text-align: right;" | 0.00667149
 
| style="text-align: right;" | 8481.36
 
|-
 
| Dibromoacetonitrile
 
| 3252-43-5
 
| style="text-align: right;" | 5
 
| style="text-align: right;" | 0.000555958
 
| style="text-align: right;" | 706.78
 
|-
 
| 2,2-Dibromo-3-nitrilopropionamide
 
| 10222-01-2
 
| style="text-align: right;" | 30
 
| style="text-align: right;" | 0.00333575
 
| style="text-align: right;" | 4240.68
 
|-
 
|- valign="top"
 
| rowspan="1"| Hydrochloric Acid (7.5%)
 
| rowspan="1"| Axiall
 
| rowspan="1"| Acidizing
 
| Hydrogen Chloride
 
| 7647-01-0
 
| style="text-align: right;" | 40
 
| style="text-align: right;" | 1.1709
 
| style="text-align: right;" | 1,488,540.0
 
|-
 
|- valign="top"
 
| rowspan="1"| Scale Hib A
 
| rowspan="1"| Nalco
 
| rowspan="1"| Scale Inhibitor
 
| Ethylene Glycol
 
| 107-21-1
 
| style="text-align: right;" | 30
 
| style="text-align: right;" | 0.00329451
 
| style="text-align: right;" | 4188.26
 
|-
 
|- valign="top"
 
| rowspan="1"| Sand (Proppant)
 
| rowspan="1"| Sargent
 
| rowspan="1"| Proppant
 
| Silica
 
| 14808-60-7
 
| style="text-align: right;" | 99.9
 
| style="text-align: right;" | 9.83669
 
| style="text-align: right;" | 12,505,200.0
 
|-
 
|- valign="top"
 
| rowspan="3"| I-7L
 
| rowspan="3"| Weatherford
 
| rowspan="3"| Iron Control
 
| Triethanolamine Hydroxyacetate
 
| 68299-02-5
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 0.00212445
 
| style="text-align: right;" | 2700.78
 
|-
 
| Glycolic Acid
 
| 79-14-1
 
| style="text-align: right;" | 2.5
 
| style="text-align: right;" | 0.000265556
 
| style="text-align: right;" | 337.597
 
|-
 
| Ethylene Glycol
 
| 107-21-1
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 0.00212445
 
| style="text-align: right;" | 2700.78
 
|-
 
|- valign="top"
 
| rowspan="1"| WGA-3
 
| rowspan="1"| PfP Technology
 
| rowspan="1"| Water Viscosifier
 
| Guar Gum
 
| 9000-30-0
 
| style="text-align: right;" | 100
 
| style="text-align: right;" | 0.00125857
 
| style="text-align: right;" | 1600
 
|-
 
|- valign="top"
 
| rowspan="1"| Water
 
| rowspan="1"| PennEnergy Resources
 
| rowspan="1"| Carrier/Base Fluid
 
| Water
 
| 7732-18-5
 
| style="text-align: right;" | 100
 
| style="text-align: right;" | 87.1076
 
| style="text-align: right;" | 110,738,000.0
 
|-
 
|- valign="top"
 
| rowspan="1"| Unislik ST50
 
| rowspan="1"| CESI
 
| rowspan="1"| Friction Reducer
 
| Petroleum Distillates, Hydrotreated Light
 
| 64742-47-8
 
| style="text-align: right;" | 30
 
| style="text-align: right;" | 0.0253226
 
| style="text-align: right;" | 32192.2
 
|-
 
|- valign="top"
 
| rowspan="1"| LEB 10X
 
| rowspan="1"| Weatherford
 
| rowspan="1"| Gel Breaker
 
| Ethylene Glycol
 
| 107-21-1
 
| style="text-align: right;" | 40
 
| style="text-align: right;" | 0.00001217
 
| style="text-align: right;" | 15.475
 
|-
 
|- valign="top"
 
| rowspan="6"| Unihib G
 
| rowspan="6"| GeoSafe
 
| rowspan="6"| Acid Corrosion Inhibitor
 
| Acetophenone
 
| 98-86-2
 
| style="text-align: right;" | 1
 
| style="text-align: right;" | 0.00000189
 
| style="text-align: right;" | 2.406
 
|-
 
| Thiourea
 
| 62-56-6
 
| style="text-align: right;" | 1
 
| style="text-align: right;" | 0.00000189
 
| style="text-align: right;" | 2.406
 
|-
 
| Glycol Ether
 
| 112-34-5
 
| style="text-align: right;" | 60
 
| style="text-align: right;" | 0.000113548
 
| style="text-align: right;" | 144.352
 
|-
 
| Ethoxylated Alcohol
 
| 68002-97-1
 
| style="text-align: right;" | 35
 
| style="text-align: right;" | 0.00006624
 
| style="text-align: right;" | 84.205
 
|-
 
| Methanol
 
| 67-56-1
 
| style="text-align: right;" | 5
 
| style="text-align: right;" | 0.00000946
 
| style="text-align: right;" | 12.029
 
|-
 
| Formaldehyde
 
| 50-00-0
 
| style="text-align: right;" | 1
 
| style="text-align: right;" | 0.00000189
 
| style="text-align: right;" | 2.406
 
|-
 
|}
 
For data sources see<ref>{{cite web
 
| title =FracFocus Fracking Chemicals Database
 
| date = 2019-04-02
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-06-19 }}</ref>
 
 
==References==
 
==References==
 
<references/>
 
<references/>

Revision as of 07:48, 20 August 2019

Well Details

Well ID: 37-007-20396
Loading map...
Country: United States
State: Pennsylvania
County: Beaver
Municipality: New Sewickley Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 145356
Farm/Lease Name: B1 PER B1-3HUD
License Status: Active
Spud Date: 2013-09-11
Permit Date: 2013-07-08
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.739631
Longitude: -80.1691

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-02-19 2014-03-01 5140 13,270,000.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 EC6116A Nalco Biocide Polyethylene Glycol 25322-68-3 60 0.00667149 8481.36
Dibromoacetonitrile 3252-43-5 5 0.000555958 706.78
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00333575 4240.68
Hydrochloric Acid (7.5%) Axiall Acidizing Hydrogen Chloride 7647-01-0 40 1.1709 1,488,540.0
Scale Hib A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00329451 4188.26
Sand (Proppant) Sargent Proppant Silica 14808-60-7 99.9 9.83669 12,505,200.0
I-7L Weatherford Iron Control Triethanolamine Hydroxyacetate 68299-02-5 20 0.00212445 2700.78
Glycolic Acid 79-14-1 2.5 0.000265556 337.597
Ethylene Glycol 107-21-1 20 0.00212445 2700.78
WGA-3 PfP Technology Water Viscosifier Guar Gum 9000-30-0 100 0.00125857 1600
Water PennEnergy Resources Carrier/Base Fluid Water 7732-18-5 100 87.1076 110,738,000.0
Unislik ST50 CESI Friction Reducer Petroleum Distillates, Hydrotreated Light 64742-47-8 30 0.0253226 32192.2
LEB 10X Weatherford Gel Breaker Ethylene Glycol 107-21-1 40 0.00001217 15.475
Unihib G GeoSafe Acid Corrosion Inhibitor Acetophenone 98-86-2 1 0.00000189 2.406
Thiourea 62-56-6 1 0.00000189 2.406
Glycol Ether 112-34-5 60 0.000113548 144.352
Ethoxylated Alcohol 68002-97-1 35 0.00006624 84.205
Methanol 67-56-1 5 0.00000946 12.029
Formaldehyde 50-00-0 1 0.00000189 2.406

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0
2014 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0
2015 PENNENERGY RESOURCES LLC 699,724.00 176 0.00 0 8,614.00 176
2016 PENNENERGY RESOURCES LLC 1,029,445.00 366 0.00 0 8,796.00 366
2017 PENNENERGY RESOURCES LLC 799,230.00 348 0.00 0 4,571.00 348
2018 PENNENERGY RESOURCES LLC 691,726.00 356 0.00 0 3,322.00 356
2019 PENNENERGY RESOURCES LLC 150,295.00 78 0.00 0 694.00 78

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 PENNENERGY RESOURCES LLC Drilling Fluid Waste (in Barrels) 3,835.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE EPA ID: 748-163
2013 PENNENERGY RESOURCES LLC Drill Cuttings (in Tons) 752.00 Tons LANDFILL CID # 28726
2014 PENNENERGY RESOURCES LLC Fracturing Fluid Waste (in Tons) 47.30 Tons LANDFILL CID # 28726
2014 PENNENERGY RESOURCES LLC Drill Cuttings (in Tons) 25.75 Tons LANDFILL CID # 28726
2015 PENNENERGY RESOURCES LLC Servicing Fluid (in Barrels) 21.00 Bbl LANDFILL CID # 28726
2016 PENNENERGY RESOURCES LLC Produced Fluid (in Barrels) RWC 802 72.40 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2016 PENNENERGY RESOURCES LLC Produced Fluid (in Barrels) RWC 802 428.81 Bbl INJECTION DISPOSAL WELL 34-155-23196
2016 PENNENERGY RESOURCES LLC Produced Fluid (in Barrels) RWC 802 4,471.89 Bbl REUSE OTHER THAN ROAD SPREADING
2016 PENNENERGY RESOURCES LLC Produced Fluid (in Barrels) RWC 802 1,225.79 Bbl INJECTION DISPOSAL WELL 34-155-22403
2016 PENNENERGY RESOURCES LLC Produced Fluid (in Barrels) RWC 802 483.10 Bbl INJECTION DISPOSAL WELL 34-155-23223
2017 PENNENERGY RESOURCES LLC Produced Fluid (in Barrels) RWC 802 3,302.13 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Produced Fluid (in Barrels) RWC 802 1,660.73 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Produced Fluid (in Barrels) RWC 802 567.87 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2201875 Primary Facility 2013-09-05 Administrative/File Review No Violations Noted This preoperational inspection satisfies operator's obligation as outlined under Title 58 , Ch 32 § 3258 a. 1.
2205409 Primary Facility 2013-09-18 Routine/Complete Inspection No Violations Noted This well targets the Geneseo Shale formation. The conductor was set and the cellar was covered with steel plate. The inspection for this well was conducted concurrently with the inspection for site number 768793 (inspection report # 2205390.) Impoundment was without liner and under construction. No erosion or sedimentation issues were apparent.
2206056 Primary Facility 2013-09-11 Drilling/Alteration No Violations Noted AN AUGER RIG IS ON THE PAD TO DRILL THE CONDUCTOR. THE SITE IS OK.
2206058 Primary Facility 2013-09-18 Drilling/Alteration No Violations Noted CELLER AND CONDUCTOR ARE IN AND COVERED.
2212252 Primary Facility 2013-10-08 Drilling/Alteration No Violations Noted TOP HOLE IS COMPLETE. THE RIG IS MOVING FROM THE PAD.
2213881 Primary Facility 2013-10-16 Drilling/Alteration No Violations Noted THE WELL IS COVERED WITH A STEEL PLATE. PAD PROTECTION HAS BEEN LEFT DOWN.
2223187 Primary Facility 2013-11-14 Drilling/Alteration No Violations Noted TOP HOLE DRILLING IS COMPLETE.
2227170 Primary Facility 2013-11-25 Drilling/Alteration No Violations Noted TOP HOLE COMPLETE. 8 5/8" CASING SET AT 2006'. RIG ON THE PAD WILL FINISH THIS WELL.
2227173 Primary Facility 2013-12-05 Drilling/Alteration No Violations Noted TOP HOLE COMPLETE AT 2,020'. PATTERSON RIG WILL FINISH THE HOLE. THE SITE IS IN GOOD CONDITION.
2231780 Primary Facility 2013-12-11 Drilling/Alteration No Violations Noted TOP HOLE DRILLED TO 2020'. PATTERSON 259 WILL MOVE TO THIS WELL AND FINISH DRILLING.
2232278 Primary Facility 2013-10-10 Routine/Complete Inspection No Violations Noted This well targets the Geneseo Shale formation. This well was partially drilled and properly labeled. The inspection for this well was conducted concurrently with the inspection for site number 768793 (inspection report # 2232277.) Impoundment was dug and unlined. No erosion or sedimentation issues were apparent.
2232813 Primary Facility 2013-11-05 Routine/Complete Inspection No Violations Noted This well targets the Geneseo Shale formation. The inspection for this well was conducted concurrently with the inspection for site number 768793 (inspection report # 2232809.) Temporary stabilization appeared adequate. No erosion or sedimentation issues were observed.
2232823 Primary Facility 2013-11-12 Routine/Complete Inspection No Violations Noted This well targets the Geneseo Shale formation. The inspection for this well was conducted concurrently with the inspection for site number 768793 (inspection report # 2232820.) Water impoundment was being lined. No erosion or sedimentation issues were apparent.
2236882 Primary Facility 2014-01-13 Routine/Complete Inspection No Violations Noted This well targets the Geneseo Shale formation. The inspection for this well was conducted concurrently with the inspection for site number 768793 (inspection report # 2236823.) Two minor slips were noted on pad's embankments. Crews were erecting equipment in preparation for stimulation operations. An above ground storage tank (AST) was being erected. Inspector confirmed with operator's representative that it would be used for flow back fluids. Operator's representative agreed to provide a copy of the OG-71 for the AST.
2247357 Primary Facility 2014-01-02 Drilling/Alteration No Violations Noted THE SITE IS BEING PREPARED FOR PRESSURE TEST AND FRAC.
2247360 Primary Facility 2014-01-14 Drilling/Alteration No Violations Noted WELL IS BEING TESTED AS PART OF THE STIMULUS PROCESS.
2251836 Primary Facility 2014-02-11 Drilling/Alteration No Violations Noted WELL IS DRILLED. RIG IS GONE. SNOW REMOVAL IS THE ONLY ACTIVITY.
2255752 Primary Facility 2014-03-17 Drilling/Alteration No Violations Noted FRAC PLUGS ARE DRILLED OUT. FLOWBACK HAS NOT STARTED.
2255756 Primary Facility 2014-03-13 Drilling/Alteration No Violations Noted FRAC PLUGS ARE DRILLED OUT. WELL IS READY FOR FLOWBACK.
2257676 Primary Facility 2014-03-20 Drilling/Alteration No Violations Noted FRAC PLUGS HAVE BEEN DRILLED OUT, BUT FLOWBACK OPS HAVE NOT STARTED.
2259858 Primary Facility 2014-04-01 Drilling/Alteration No Violations Noted FLOWBACK HAS STARTED, AND THE WELL IS FLARED.
2275106 Primary Facility 2014-04-07 Drilling/Alteration No Violations Noted FLOWBACK IS COMPLETE. THE WELL IS NO LONGER FLARED. THE SITE IS OK.
2361477 Primary Facility 2015-04-10 Routine/Partial Inspection No Violations Noted
2372410 Primary Facility 2015-04-20 Drilling/Alteration No Violations Noted ALL FRAC PLUGS ARE DRILLED OUT. THEY WILL RUN TUBING. THE SITE IS OK.
2374329 Primary Facility 2015-05-26 Routine/Complete Inspection No Violations Noted
2391271 Primary Facility 2015-07-17 Drilling/Alteration No Violations Noted THIS WELL IS FRACED AND BEING HOOKED UP FOR PRODUCTION.
2392557 Primary Facility 2015-07-17 Routine/Complete Inspection No Violations Noted
2439248 Primary Facility 2016-01-04 Routine/Complete Inspection No Violations Noted
2439250 Primary Facility 2016-01-04 Routine/Complete Inspection No Violations Noted
2478963 Primary Facility 2016-04-22 Routine/Complete Inspection No Violations Noted
2561368 Primary Facility 2017-02-14 Routine/Complete Inspection No Violations Noted On 2/14/2017, Brian MacQuarrie onsite at unconventional well site. Act 9 sign in place. Erosion and Sedimentation Plan onsite. Three wells in production. Wells properly tagged. Two 400 bbl tanks installed within stainless steel containment structure. Freshwater impoundment maintained and fenced in. Erosion and Sedimentation Best Management Practices installed and maintained. Site stabilized with vegetative growth in previously disturbed areas. No apparent E/S issues.
2666341 Primary Facility 2017-12-01 Routine/Complete Inspection No Violations Noted Site had been constructed as outlined in the E&S plan contained within the ESCGP. All site and access road erosion controls had been implemented and properly maintained. There was no observed accelerated erosion or sedimentation in relation to the site or access road. All disturbed areas had been stabilized with vegetation attaining 70% uniform vegetative cover. Well appeared to be equipped for production. Two produced fluids tanks were located onsite within containment. Both the tanks and containment appeared to be in sound condition.
2683656 Primary Facility 2018-01-18 Routine/Complete Inspection No Violations Noted Site had been constructed as outlined within the E&S Plan contained within the ESCGP. Evaluation of erosion control functionality and maintenance was not feasible due to snow and ice conditions. Well appeared to be equipped for production. Two brine tanks were located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. Well development impoundment located onsite and it was observed to contain frozen fluids and snow.
2698790 Primary Facility 2018-02-27 Routine/Complete Inspection No Violations Noted Site and access road had been constructed in accordance with the ESCGP. All site and access road erosion controls had been implemented and maintained properly. All disturbed slopes and soil stockpiles had been stabilized with vegetation. There was no observed accelerated erosion or sedimentation in relation to the site or access road. It was noted that significant precipitation events had recently ceased. Two produced fluids tanks were located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. There was an Act 9 sign located onsite in accordance with 25 Pa Code Chapter 78a.55(i).
2761043 Primary Facility 2018-08-07 Complaint Inspection No Violations Noted At the time of inspection well equipped for production. Two brine tanks within secondary containment and appears structurally sound. GPUs within containment. No E&S issues.

For data sources see[7]

References