X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-115-21523"

m
m
Line 217: Line 217:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 222: Line 223:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2014-S01
+
| 2014
 +
| [[CHIEF OIL & GAS LLC]]
 
| Drill Cuttings (in Tons)
 
| Drill Cuttings (in Tons)
| style="text-align: right;" | 209.17 Tons
+
| style="text-align: right;" | 978.61 Tons
 
| LANDFILL
 
| LANDFILL
 
| 100933
 
| 100933
 
|-
 
|-
| 2014-S01
+
| 2014
| Drilling Fluid Waste (in Barrels)
+
| [[CHIEF OIL & GAS LLC]]
| style="text-align: right;" | 442.00 Bbl
+
| Fracing Fluid Waste (in Barrels)
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| style="text-align: right;" | 444.00 Bbl
| WMGR119
 
|-
 
| 2014-S01
 
| Drilling Fluid Waste (in Barrels)
 
| style="text-align: right;" | 110.00 Bbl
 
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123
 
| WMGR123
 
|-
 
|-
| 2014-S01
+
| 2014
 +
| [[CHIEF OIL & GAS LLC]]
 
| Drilling Fluid Waste (in Barrels)
 
| Drilling Fluid Waste (in Barrels)
 
| style="text-align: right;" | 988.00 Bbl
 
| style="text-align: right;" | 988.00 Bbl
Line 246: Line 244:
 
| WMGR123SW018
 
| WMGR123SW018
 
|-
 
|-
| 2014-S02
+
| 2014
| Drill Cuttings (in Tons)
+
| [[CHIEF OIL & GAS LLC]]
| style="text-align: right;" | 769.44 Tons
+
| Fracing Fluid Waste (in Barrels)
| LANDFILL
+
| style="text-align: right;" | 6,006.00 Bbl
| 100933
+
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2014
 +
| [[CHIEF OIL & GAS LLC]]
 +
| Drilling Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 442.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR119
 
|-
 
|-
| 2014-S02
+
| 2014
 +
| [[CHIEF OIL & GAS LLC]]
 
| Drill Cuttings (in Tons)
 
| Drill Cuttings (in Tons)
 
| style="text-align: right;" | 20.00 Tons
 
| style="text-align: right;" | 20.00 Tons
Line 258: Line 265:
 
| 301358
 
| 301358
 
|-
 
|-
| 2014-S02
+
| 2014
 +
| [[CHIEF OIL & GAS LLC]]
 
| Drilling Fluid Waste (in Barrels)
 
| Drilling Fluid Waste (in Barrels)
| style="text-align: right;" | 1,858.67 Bbl
+
| style="text-align: right;" | 1,968.67 Bbl
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123
 
|-
 
| 2014-S02
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 444.00 Bbl
 
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123
 
| WMGR123
 
|-
 
|-
| 2014-S02
+
| 2015
| Fracing Fluid Waste (in Barrels)
+
| [[CHIEF OIL & GAS LLC]]
| style="text-align: right;" | 6,006.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2015-S01
 
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 30.00 Bbl
 
| style="text-align: right;" | 30.00 Bbl
Line 282: Line 279:
 
| WMGR123
 
| WMGR123
 
|-
 
|-
| 2015-S01
+
| 2015
 +
| [[CHIEF OIL & GAS LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 2,380.32 Bbl
+
| style="text-align: right;" | 11,000.33 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2015-S02
+
| 2016
| Produced Fluid (in Barrels)
+
| [[CHIEF OIL & GAS LLC]]
| style="text-align: right;" | 8,620.01 Bbl
+
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 3,321.29 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2016-S01
+
| 2016
 +
| [[CHIEF OIL & GAS LLC]]
 
| Fracturing Fluid Waste (in Barrels) RWC 805
 
| Fracturing Fluid Waste (in Barrels) RWC 805
 
| style="text-align: right;" | 60.00 Bbl
 
| style="text-align: right;" | 60.00 Bbl
Line 300: Line 300:
 
| WMGR123
 
| WMGR123
 
|-
 
|-
| 2016-S01
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[CHIEF OIL & GAS LLC]]
| style="text-align: right;" | 1,971.23 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2016-S02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,350.06 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2017-M01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 146.42 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 54.88 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 203.10 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 111.04 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 101.83 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 92.98 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 82.68 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 79.07 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 59.40 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 61.59 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M06
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 55.73 Bbl
+
| style="text-align: right;" | 872.00 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2019-M02
+
| 2018
 +
| [[CHIEF OIL & GAS LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 40.93 Bbl
+
| style="text-align: right;" | 176.72 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2019-M03
+
| 2019
 +
| [[CHIEF OIL & GAS LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 35.22 Bbl
+
| style="text-align: right;" | 76.15 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  

Revision as of 14:58, 20 August 2019

Well Details

Well ID: 37-115-21523
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Lenox Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 151104
Farm/Lease Name: ROGERS UNIT 4H
License Status: Active
Spud Date: 2014-05-01
Permit Date: 2013-12-03
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.696489
Longitude: -75.723183

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-08-12 2014-08-18 7565 5,363,990.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 MCS-2510T MULTI-CHEM Scale Inhibitor ETHYLENE GLYCOL 107-21-1 60 0.006 0
Water Provided by Customer Base Fluid Fresh Water 0000-00-0 100 99.9 0
FR-66 Halliburton Friction Reducer Hydrotreated Light Petroleum Distillate 64742-47-8 30 0.02 0
MCB-8614 MULTI-CHEM BIOCIDE GLUTARALDEHYDE 111-30-8 30 0.02 0
ALKYL (C12-16) DIMETHYLBENZXYLAMMONIUM CHLORIDE 68424-85-1 5 0.003 0
Hydrochloric Acid 10-30% Halliburton Acid Hydrochloric Acid 7647-01-0 30 0.05 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2015 CHIEF OIL & GAS LLC 666,117.64 196 0.00 0 0.00 0
2016 CHIEF OIL & GAS LLC 1,037,925.26 362 0.00 0 0.00 0
2017 CHIEF OIL & GAS LLC 795,003.02 365 0.00 0 0.00 0
2018 CHIEF OIL & GAS LLC 626,594.86 365 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 133,701.12 90 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 CHIEF OIL & GAS LLC Drill Cuttings (in Tons) 978.61 Tons LANDFILL 100933
2014 CHIEF OIL & GAS LLC Fracing Fluid Waste (in Barrels) 444.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014 CHIEF OIL & GAS LLC Drilling Fluid Waste (in Barrels) 988.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW018
2014 CHIEF OIL & GAS LLC Fracing Fluid Waste (in Barrels) 6,006.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHIEF OIL & GAS LLC Drilling Fluid Waste (in Barrels) 442.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2014 CHIEF OIL & GAS LLC Drill Cuttings (in Tons) 20.00 Tons LANDFILL 301358
2014 CHIEF OIL & GAS LLC Drilling Fluid Waste (in Barrels) 1,968.67 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 CHIEF OIL & GAS LLC Fracing Fluid Waste (in Barrels) 30.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 CHIEF OIL & GAS LLC Produced Fluid (in Barrels) 11,000.33 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHIEF OIL & GAS LLC Produced Fluid (in Barrels) RWC 802 3,321.29 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHIEF OIL & GAS LLC Fracturing Fluid Waste (in Barrels) RWC 805 60.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2017 CHIEF OIL & GAS LLC Produced Fluid (in Barrels) RWC 802 872.00 Bbl REUSE (AT WELL PAD)
2018 CHIEF OIL & GAS LLC Produced Fluid (in Barrels) RWC 802 176.72 Bbl REUSE (AT WELL PAD)
2019 CHIEF OIL & GAS LLC Produced Fluid (in Barrels) RWC 802 76.15 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2301057 Primary Facility 2014-09-02 Drilling/Alteration No Violations Noted
2339543 Primary Facility 2015-01-27 Routine/Complete Inspection No Violations Noted On 1/27/15, the Department was on site at the Chief Rogers Well Pad to conduct a routine inspection. Well permits that have been issued for this site are the Rogers 1H (115-21524), 2H (115-21525), 3H (115-21526), and the 4H (115-21523). A crew is on the pad actively installing production equipment on the pad. All four wells appear to have been flowed back, and the crews have emplaced the four production units along with a battery of production tanks. Well heads and production equipment is being plumbed together. Production piping is being buried in approximately 4’ deep excavated ditches. This inspection conducted in conjunction with an inspection of the Regency Taylor to Rogers Pipeline construction. Pipeline scheduled to be ready for production sometime mid to late February. Pad is snow covered. No violations noted.
2659982 Primary Facility 2017-11-08 Routine/Complete Inspection No Violations Noted All fill slopes stone stabilized. Today's inspection was conducted as a routine inspection. Site is stable. Photo 1 shows the well pad layout. Photo 2 shows the southeast corner of the well site. No violations noted.
2803574 Primary Facility 2018-11-13 Routine/Complete Inspection No Violations Noted This inspection was conducted to confirm Chief's assessment that the project meets the minimum requirements for permit termination. The Department’s determination is that the site meets the requirements for permit termination. I recommend the NOT be approved.

For data sources see[7]

References