If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Holmes_County,_Ohio|Holmes]] | | County: [[Holmes_County,_Ohio|Holmes]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Mechanic_Township,_Holmes_County,_Ohio|Mechanic Township]] |
|- | |- | ||
| Operator Name: [[YODER ELMER H DOROTHY]] | | Operator Name: [[YODER ELMER H DOROTHY]] |
Well ID: 34-075-23559 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.474341485,"lon":-81.81510358,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Holmes | |
Municipality: Mechanic Township | |
Operator Name: YODER ELMER H DOROTHY | |
Well Pad ID: | |
Farm/Lease Name: YODER HENRY C | |
License Status: Domestic Well | |
License Date: 1981-11-17 | |
Spud Date: 1981-12-05 | |
Spud Drilling Contractor: | |
Final Drill Date: 1981-12-11 | |
Well Total Depth: 4040 ft | |
Configuration: Vertical | |
Latitude: 40.474341485 | |
Longitude: -81.81510358 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1981-11-17 | 2547 TATUM PETROLEUM CORP GeoDate 11/17/81 |
Oil and Gas | 1981-11-17 | Issued Date 11/17/81 Expired Date 11/17/82 Acres 0000000 Tool Type RTAF Proposed Formation Proposed Depth 00000 Proposed Drill Depth 00000 |
Original Spud | 1981-12-05 | |
Completed | 1981-12-11 | |
Reached Total Depth | 1981-12-11 | |
Construction Permit Expires | 1982-11-17 | |
CO | 1995-12-19 | 5344 YODER ELMER H GeoDate 11/17/81 |
Record Last Modified | 2009-12-11 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 3943 | 4002 | 19 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 2400 Bbl | 50000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1986 | TATUM PETROLEUM CORP | 12644 | 480 | 255 |
1987 | TATUM PETROLEUM CORP | 1973 | 394 | 198 |
1988 | TATUM PETROLEUM CORP | 1140 | 356 | 302 |
1989 | TATUM PETROLEUM CORP | 127 | 207 | 123 |
1990 | TATUM PETROLEUM CORP | 85 | 261 | 292 |
1991 | TATUM PETROLEUM CORP | 20 | 246 | 331 |
1992 | TATUM PETROLEUM CORP | 1 | 78 | 212 |
1993 | TATUM PETROLEUM CORP | 0 | 147 | 40 |
1994 | TATUM PETROLEUM CORP | 77 | 249 | 194 |
1995 | TATUM PETROLEUM CORP | 35 | 224 | 334 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1986 | TATUM PETROLEUM CORP | Brine | 2 | 255 |
1987 | TATUM PETROLEUM CORP | Brine | 4 | 198 |
1988 | TATUM PETROLEUM CORP | Brine | 3 | 302 |
1989 | TATUM PETROLEUM CORP | Brine | 2 | 123 |
1990 | TATUM PETROLEUM CORP | Brine | 2 | 292 |
1991 | TATUM PETROLEUM CORP | Brine | 3 | 331 |
1992 | TATUM PETROLEUM CORP | Brine | 1 | 212 |
1993 | TATUM PETROLEUM CORP | Brine | 0 | 40 |
1994 | TATUM PETROLEUM CORP | Brine | 54 | 194 |
1995 | TATUM PETROLEUM CORP | Brine | 25 | 334 |