X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-059-25771"

m
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-059-25771
 
| Well ID: 37-059-25771
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.896277, -80.124863 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.896278, -80.124864 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Greene County, Pennsylvania|Greene]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Franklin Township, Greene County, Pennsylvania|Franklin Township]]
+
| State: Pennsylvania
 
|-
 
|-
| Operator Name: [[VANTAGE ENERGY APPALACHIA LLC]]
+
| County: [[Greene_County,_Pennsylvania|Greene]]
 
|-
 
|-
| Well Pad ID: [[149213|149213]]
+
| Municipality: [[Franklin Township,_Greene_County,_Pennsylvania|Franklin Township]]
 
|-
 
|-
| Farm/Lease Name: ROHANNA 3H
+
| Operator Name: [[RICE DRILLING B LLC]]
 
|-
 
|-
| First Permit Date: 2011-07-08
+
| Well Pad ID: [[149213]]
 
|-
 
|-
| Last Permit Date: 2011-07-08
+
| Farm/Lease Name: ROHANNA
 
|-
 
|-
| Spud Date: 2011-07-27
+
| License Status: Active
 
|-
 
|-
| Unconventional: Yes
+
| Spud Date: 2011-07-21
 
|-
 
|-
| Horizontal: Yes
+
| Permit Date: 2011-07-08
 
|-
 
|-
| Well Status: ACTIVE
+
| Well Type: GAS
 
|-
 
|-
| Violations: 0
+
| Unconventional Well: Y
 
|-
 
|-
| Latitude: 39.896277
+
| Configuration: Horizontal Well
 
|-
 
|-
| Longitude: -80.124863
+
| Conservation: Yes
 
|-
 
|-
 +
| Latitude: 39.896278
 +
|-
 +
| Longitude: -80.124864
 
|}
 
|}
== Production Data ==
+
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Date
!scope="col" | GAS QUANTITY
+
!scope="col" | Event
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
| 2011-2
+
| 2011-07-08
| style="text-align:right;" | 0.0
+
| New Permit Application
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2011-07-27
 +
| Performed Spud Operation
 
|-
 
|-
| 2011-2
+
| 2011-08-21
| style="text-align:right;" | 156106.49
+
| Drilling Completion
| style="text-align:right;" | 50.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2011-10-04
 +
| Perforation
 
|-
 
|-
| 2012-1
+
| 2011-10-04
| style="text-align:right;" | 543292.46
+
| Performed Stage 1 of Stimulation
| style="text-align:right;" | 182.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2011-10-04
 +
| Performed Stage 10 of Stimulation
 
|-
 
|-
| 2012-2
+
| 2011-10-04
| style="text-align:right;" | 419447.5
+
| Performed Stage 2 of Stimulation
| style="text-align:right;" | 183.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2011-10-04
 +
| Performed Stage 3 of Stimulation
 
|-
 
|-
| 2013-1
+
| 2011-10-05
| style="text-align:right;" | 320367.6
+
| Perforation
| style="text-align:right;" | 167.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2011-10-05
 +
| Performed Stage 4 of Stimulation
 
|-
 
|-
| 2013-2
+
| 2011-10-05
| style="text-align:right;" | 289141.0
+
| Performed Stage 5 of Stimulation
| style="text-align:right;" | 184.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2011-10-06
 +
| Perforation
 
|-
 
|-
| 2014-1
+
| 2011-10-06
| style="text-align:right;" | 262503.0
+
| Performed Stage 6 of Stimulation
| style="text-align:right;" | 177.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2011-10-06
 +
| Performed Stage 7 of Stimulation
 
|-
 
|-
| 2014-2
+
| 2011-10-06
| style="text-align:right;" | 227420.3
+
| Performed Stage 8 of Stimulation
| style="text-align:right;" | 174.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2011-10-07
 +
| Perforation
 
|-
 
|-
| 2015-02
+
| 2011-10-07
| style="text-align:right;" | 31850.24
+
| Performed Stage 11 of Stimulation
| style="text-align:right;" | 27.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2011-10-07
 +
| Performed Stage 9 of Stimulation
 
|-
 
|-
| 2015-01
+
| 2011-10-08
| style="text-align:right;" | 37773.05
+
| Perforation
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2011-10-08
 +
| Performed Stage 12 of Stimulation
 
|-
 
|-
| 2015-03
+
| 2019-04-08
| style="text-align:right;" | 37295.55
+
| Deviated
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Production Report
+
  | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
| date = 2020-02-27
| date = 2015-05-26
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
+
  | accessdate = 2020-02-27 }}</ref>
  | accessdate = 2015-05-27 }}</ref>
+
<!--== Fracking Activities ==
== Waste Data ==
+
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
== Stimulation Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Stimulation Date
!scope="col" | TYPE
+
!scope="col" | Phase Number
!scope="col" | QUANTITY
+
!scope="col" | Chemical Agent
!scope="col" | UNITS
+
!scope="col" | Volume (gal)
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Treating Pressure (psi)
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Breakdown Pressure (psi)
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2011-2
+
| 2011-10-04
| FRACING FLUID WASTE
+
| style="text-align: right;" | 1
| style="text-align:right;" | 7.0
+
| 106210; 121520; 75740
| Bbl
+
| style="text-align: right;" | 4,701,186
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| style="text-align: right;" | 7,823
| PA0254185
+
| style="text-align: right;" | 0
| RESERVED ENV SVC WASTE WATER TREATMENT FACILITY
+
|-
| MOUNT PLEASANT
+
| 2011-10-04
| PA
+
| style="text-align: right;" | 2
 +
| 106210; 121520; 75740
 +
| style="text-align: right;" | 4,701,186
 +
| style="text-align: right;" | 8,035
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-10-04
 +
| style="text-align: right;" | 3
 +
| 106210; 121520; 75740
 +
| style="text-align: right;" | 4,701,186
 +
| style="text-align: right;" | 7,308
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-10-05
 +
| style="text-align: right;" | 4
 +
| 106210; 121520; 75740
 +
| style="text-align: right;" | 4,701,186
 +
| style="text-align: right;" | 7,429
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-10-05
 +
| style="text-align: right;" | 5
 +
| 106210; 121520; 75740
 +
| style="text-align: right;" | 4,701,186
 +
| style="text-align: right;" | 7,519
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-10-06
 +
| style="text-align: right;" | 6
 +
| 106210; 121520; 75740
 +
| style="text-align: right;" | 4,701,186
 +
| style="text-align: right;" | 7,849
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-10-06
 +
| style="text-align: right;" | 7
 +
| 106210; 121520; 75740
 +
| style="text-align: right;" | 4,701,186
 +
| style="text-align: right;" | 7,712
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-10-06
 +
| style="text-align: right;" | 8
 +
| 106210; 121520; 75740
 +
| style="text-align: right;" | 4,701,186
 +
| style="text-align: right;" | 7,499
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-10-07
 +
| style="text-align: right;" | 9
 +
| 106210; 121520; 75740
 +
| style="text-align: right;" | 4,701,186
 +
| style="text-align: right;" | 7,424
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-10-04
 +
| style="text-align: right;" | 10
 +
| 106210; 121520; 75740
 +
| style="text-align: right;" | 4,701,186
 +
| style="text-align: right;" | 7,483
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-10-07
 +
| style="text-align: right;" | 11
 +
| 106210; 121520; 75740
 +
| style="text-align: right;" | 4,701,186
 +
| style="text-align: right;" | 7,149
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2011-10-08
 +
| style="text-align: right;" | 12
 +
| 106210; 121520; 75740
 +
| style="text-align: right;" | 4,701,186
 +
| style="text-align: right;" | 6,899
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-2
+
|}
| PRODUCED FLUID
+
For data sources see<ref>{{cite web
| style="text-align:right;" | 795.0
+
| title = Completion Reports - Stimulations
| Bbl
+
| publisher = Pennsylvania Department of Conservation and Natural Resources
| INJECTION DISPOSAL WELL
+
| date = 2020-03-02
| 4355
+
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
| B & B OILFIELD SERVICE, INC.
+
| accessdate = 2020-03-02 }}</ref>
| GARRETTSVILLE
+
== Production Data ==
| OH
+
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 
|-
 
|-
 +
| 2011
 +
| [[VANTAGE ENERGY APPALACHIA LLC]]
 +
| style="text-align: right;" | 156,106.49
 +
| style="text-align: right;" | 50
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-2
+
| 2012
| PRODUCED FLUID
+
| [[VANTAGE ENERGY APPALACHIA LLC]]
| style="text-align:right;" | 550.0
+
| style="text-align: right;" | 962,739.96
| Bbl
+
| style="text-align: right;" | 365
| INJECTION DISPOSAL WELL
+
| style="text-align: right;" | 0.00
| 34-059-24067
+
| style="text-align: right;" | 0
| DAVID R. HILL INC
+
| style="text-align: right;" | 0.00
| BYESVILLE
+
| style="text-align: right;" | 0
| OH
 
 
|-
 
|-
 +
| 2013
 +
| [[VANTAGE ENERGY APPALACHIA LLC]]
 +
| style="text-align: right;" | 609,508.60
 +
| style="text-align: right;" | 351
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-2
+
| 2014
| PRODUCED FLUID
+
| [[VANTAGE ENERGY APPALACHIA LLC]]
| style="text-align:right;" | 500.0
+
| style="text-align: right;" | 489,923.30
| Bbl
+
| style="text-align: right;" | 351
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| style="text-align: right;" | 0.00
| PA0254185
+
| style="text-align: right;" | 0
| RESERVED ENV SVC WASTE WATER TREATMENT FACILITY
+
| style="text-align: right;" | 0.00
| MOUNT PLEASANT
+
| style="text-align: right;" | 0
| PA
 
 
|-
 
|-
 +
| 2015
 +
| [[VANTAGE ENERGY APPALACHIA LLC]]
 +
| style="text-align: right;" | 413,934.83
 +
| style="text-align: right;" | 361
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-2
+
| 2016
| PRODUCED FLUID
+
| [[VANTAGE ENERGY APPALACHIA LLC]]
| style="text-align:right;" | 2.0
+
| style="text-align: right;" | 335,078.33
| Bbl
+
| style="text-align: right;" | 366
| REUSE OTHER THAN ROAD SPREADING
+
| style="text-align: right;" | 0.00
|  
+
| style="text-align: right;" | 0
| REUSE OF BRINE TO FRAC A WELL
+
| style="text-align: right;" | 0.00
|  
+
| style="text-align: right;" | 0
|  
 
 
|-
 
|-
 +
| 2017
 +
| [[RICE DRILLING B LLC]]
 +
| style="text-align: right;" | 276,528.69
 +
| style="text-align: right;" | 360
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-1
+
| 2018
| PRODUCED FLUID
+
| [[RICE DRILLING B LLC]]
| style="text-align:right;" | 6.0
+
| style="text-align: right;" | 195,657.00
| Bbl
+
| style="text-align: right;" | 253
| REUSE OTHER THAN ROAD SPREADING
+
| style="text-align: right;" | 0.00
|  
+
| style="text-align: right;" | 0
| REUSE FOR HYDRAULIC FRACTURING
+
| style="text-align: right;" | 0.00
|  
+
| style="text-align: right;" | 0
|  
 
 
|-
 
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| style="text-align: right;" | 260,231.00
 +
| style="text-align: right;" | 327
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-2
+
|}
| PRODUCED FLUID
+
For data sources see<ref>{{cite web
| style="text-align:right;" | 2.0
+
| title =Oil and Gas Production Reports
| Bbl
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| REUSE OTHER THAN ROAD SPREADING
+
| date = 2019-03-31
|  
+
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
| REUSE FOR HYDRAULIC FRACTURING
+
| accessdate = 2019-05-21 }}</ref>
|  
+
== Waste Data ==
|  
+
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 
|-
 
|-
 +
| 2011
 +
| [[VANTAGE ENERGY APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 795.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 4355
 
|-
 
|-
| 2013-1
+
| 2011
| PRODUCED FLUID
+
| [[VANTAGE ENERGY APPALACHIA LLC]]
| style="text-align:right;" | 555.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 550.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-059-24067
 
| 34-059-24067
| DEVCO UNIT #1 (SWIW #11)
 
| CAMBRIDGE
 
| OH
 
 
|-
 
|-
 +
| 2011
 +
| [[VANTAGE ENERGY APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 2,158.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2011
 +
| [[VANTAGE ENERGY APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 7,611.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0254185
 
|-
 
|-
| 2013-1
+
| 2011
| PRODUCED FLUID
+
| [[VANTAGE ENERGY APPALACHIA LLC]]
| style="text-align:right;" | 1.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 500.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0254185
 +
|-
 +
| 2012
 +
| [[VANTAGE ENERGY APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 9,759.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE FOR HYDRAULIC FRACTURING
+
|-
|  
+
| 2013
 +
| [[VANTAGE ENERGY APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,230.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
|-
+
| 2013
| 2013-2
+
| [[VANTAGE ENERGY APPALACHIA LLC]]
| PRODUCED FLUID
+
| Produced Fluid
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 1,894.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-059-24067
 
| 34-059-24067
| DEVCO UNIT #1 (SWIW #11)
 
| CAMBRIDGE
 
| OH
 
 
|-
 
|-
 +
| 2014
 +
| [[VANTAGE ENERGY APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 187.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-24078
 
|-
 
|-
| 2013-2
+
| 2014
| PRODUCED FLUID
+
| [[VANTAGE ENERGY APPALACHIA LLC]]
| style="text-align:right;" | 20.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 81.00 Bbl
| REUSE OTHER THAN ROAD SPREADING
+
| INJECTION DISPOSAL WELL
|
+
| 34-155-21447
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 
|
 
|  
 
 
|-
 
|-
 +
| 2014
 +
| [[VANTAGE ENERGY APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 36.67 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-059-24202
 
|-
 
|-
| 2014-1
+
| 2014
| PRODUCED FLUID
+
| [[VANTAGE ENERGY APPALACHIA LLC]]
| style="text-align:right;" | 1.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 1,010.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-059-24067
 
| 34-059-24067
| DEVCO UNIT #1 (SWIW #11)
 
| CAMBRIDGE
 
| OH
 
|-
 
 
|-
 
|-
| 2014-1
+
| 2014
| PRODUCED FLUID
+
| [[VANTAGE ENERGY APPALACHIA LLC]]
| style="text-align:right;" | 87.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 421.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-155-21438
 
| 34-155-21438
| KLEESE #1 (SWIW #18)
 
| VIENNA
 
| OH
 
 
|-
 
|-
 +
| 2014
 +
| [[VANTAGE ENERGY APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 130.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23759
 
|-
 
|-
| 2014-1
+
| 2014
| PRODUCED FLUID
+
| [[VANTAGE ENERGY APPALACHIA LLC]]
| style="text-align:right;" | 97.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 382.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-155-23732
 
| 34-155-23732
| KLEESE #4 (SWIW #24)
 
| VIENNA
 
| OH
 
 
|-
 
|-
 +
| 2015
 +
| [[VANTAGE ENERGY APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 111.89 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-21447
 
|-
 
|-
| 2014-1
+
| 2015
| PRODUCED FLUID
+
| [[VANTAGE ENERGY APPALACHIA LLC]]
| style="text-align:right;" | 36.67
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 96.86 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-059-24202
+
| 34-155-23223
| SOS-D #1 (SWIW #12)
 
| CAMBRIDGE
 
| OH
 
 
|-
 
|-
 +
| 2015
 +
| [[VANTAGE ENERGY APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 160.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 
|-
 
|-
| 2014-2
+
| 2015
| PRODUCED FLUID
+
| [[VANTAGE ENERGY APPALACHIA LLC]]
| style="text-align:right;" | 187.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 70.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-155-24078
 
| 34-155-24078
| KDA #1 (SWIW #32)
 
| VIENNA
 
| OH
 
 
|-
 
|-
 +
| 2015
 +
| [[VANTAGE ENERGY APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 594.67 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 
|-
 
|-
| 2014-2
+
| 2015
| PRODUCED FLUID
+
| [[VANTAGE ENERGY APPALACHIA LLC]]
| style="text-align:right;" | 334.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 81.96 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-21438
+
| 34-155-23732
| KLEESE #1 (SWIW #18)
+
|-
| VIENNA
+
| 2015
| OH
+
| [[VANTAGE ENERGY APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 112.50 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23759
 +
|-
 +
| 2016
 +
| [[VANTAGE ENERGY APPALACHIA LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 23.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 +
|-
 +
| 2016
 +
| [[VANTAGE ENERGY APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 870.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2016
 +
| [[VANTAGE ENERGY APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 103.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 +
|-
 +
| 2017
 +
| [[VANTAGE ENERGY APPALACHIA LLC]]
 +
| Soil Contaminated by Oil & Gas Related Spills
 +
| style="text-align: right;" | 0.19 Tons
 +
| LANDFILL
 +
| CID # 28726
 +
|-
 +
| 2017
 +
| [[VANTAGE ENERGY APPALACHIA LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 42.00 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2017
 +
| [[VANTAGE ENERGY APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 184.25 Bbl
 +
| REUSE (AT WELL PAD)
 +
|  
 +
|-
 +
| 2017
 +
| [[VANTAGE ENERGY APPALACHIA LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 5.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2017
 +
| [[VANTAGE ENERGY APPALACHIA LLC]]
 +
| Servicing Fluid
 +
| style="text-align: right;" | 2.98 Tons
 +
| RESIDUAL WASTE TRANSFER FACILITY
 +
| 101532
 +
|-
 +
| 2017
 +
| [[VANTAGE ENERGY APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 28.75 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 
|-
 
|-
 +
| 2017
 +
| [[VANTAGE ENERGY APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 41.25 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW010
 
|-
 
|-
| 2014-2
+
| 2017
| PRODUCED FLUID
+
| [[VANTAGE ENERGY APPALACHIA LLC]]
| style="text-align:right;" | 81.0
+
| Soil Contaminated by Oil
| Bbl
+
| style="text-align: right;" | 0.19 Tons
| INJECTION DISPOSAL WELL
+
| LANDFILL
| 34-155-21447
+
| CID # 28726
| KLEESE #2 (SWIW #19)
 
| VIENNA
 
| OH
 
 
|-
 
|-
 +
| 2018
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 131.67 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 
|-
 
|-
| 2014-2
+
| 2018
| PRODUCED FLUID
+
| [[RICE DRILLING B LLC]]
| style="text-align:right;" | 285.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 223.53 Bbl
| INJECTION DISPOSAL WELL
+
| REUSE (AT WELL PAD)
| 34-155-23732
+
|  
| KLEESE #4 (SWIW #24)
 
| VIENNA
 
| OH
 
 
|-
 
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 76.67 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 
|-
 
|-
| 2014-2
+
| 2019
| PRODUCED FLUID
+
| [[RICE DRILLING B LLC]]
| style="text-align:right;" | 130.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 107.70 Bbl
| INJECTION DISPOSAL WELL
+
| REUSE (AT WELL PAD)
| 34-155-23759
+
|  
| KLEESE #5 (SWIW #25)
 
| TRUMBULL
 
| OH
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Waste Report
+
  | title =Oil and Gas Waste Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-26 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
!scope="col" | VIOLATION CODE
+
!scope="col" | Inspection Comments
!scope="col" | VIOLATION_COMMENT
 
 
|-
 
|-
 
| 2008026
 
| 2008026
 +
| Primary Facility
 
| 2011-10-04
 
| 2011-10-04
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| Rig up to frac well; fracing stage 1&2 of 14 stages; Pumpco on site; Location E&S good;
 
| Rig up to frac well; fracing stage 1&2 of 14 stages; Pumpco on site; Location E&S good;
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2083760
 
| 2083760
 +
| Primary Facility
 
| 2012-06-19
 
| 2012-06-19
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
|
 
|
 
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 2126694
 
| 2126694
 +
| Primary Facility
 
| 2012-12-20
 
| 2012-12-20
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| ROUTINE INSPECTION. SITE COMPLIANT AT TIME OF INSPECTION.
 
| ROUTINE INSPECTION. SITE COMPLIANT AT TIME OF INSPECTION.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2128376
 
| 2128376
 +
| Primary Facility
 
| 2013-01-03
 
| 2013-01-03
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2195680
 
| 2195680
 +
| Primary Facility
 
| 2013-08-13
 
| 2013-08-13
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| ROUTINE INSPECTION. INSPECTED WELL SITE AS PER A COMPLAINT OF FUMES / ODOR FROM FRACING FROM A LOCAL RESIDENT. NO SMELLS OR MONITOR READINGS AT TIME OF INSPECTION.
 
| ROUTINE INSPECTION. INSPECTED WELL SITE AS PER A COMPLAINT OF FUMES / ODOR FROM FRACING FROM A LOCAL RESIDENT. NO SMELLS OR MONITOR READINGS AT TIME OF INSPECTION.
|  
+
|-
|  
+
| 2410877
|  
+
| Primary Facility
 +
| 2015-08-05
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well in production.  Well in compliance.
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Inspection Report
+
  | title =Oil and Gas Compliance Report
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-05-20
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== References ==
+
==References==
{{reflist}}
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]

Latest revision as of 21:15, 14 May 2020

Well Details

Well ID: 37-059-25771
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Franklin Township
Operator Name: RICE DRILLING B LLC
Well Pad ID: 149213
Farm/Lease Name: ROHANNA
License Status: Active
Spud Date: 2011-07-21
Permit Date: 2011-07-08
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 39.896278
Longitude: -80.124864

For data sources see[1][2][3]

Well History

Date Event
2011-07-08 New Permit Application
2011-07-27 Performed Spud Operation
2011-08-21 Drilling Completion
2011-10-04 Perforation
2011-10-04 Performed Stage 1 of Stimulation
2011-10-04 Performed Stage 10 of Stimulation
2011-10-04 Performed Stage 2 of Stimulation
2011-10-04 Performed Stage 3 of Stimulation
2011-10-05 Perforation
2011-10-05 Performed Stage 4 of Stimulation
2011-10-05 Performed Stage 5 of Stimulation
2011-10-06 Perforation
2011-10-06 Performed Stage 6 of Stimulation
2011-10-06 Performed Stage 7 of Stimulation
2011-10-06 Performed Stage 8 of Stimulation
2011-10-07 Perforation
2011-10-07 Performed Stage 11 of Stimulation
2011-10-07 Performed Stage 9 of Stimulation
2011-10-08 Perforation
2011-10-08 Performed Stage 12 of Stimulation
2019-04-08 Deviated

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2011-10-04 1 106210; 121520; 75740 4,701,186 7,823 0
2011-10-04 2 106210; 121520; 75740 4,701,186 8,035 0
2011-10-04 3 106210; 121520; 75740 4,701,186 7,308 0
2011-10-05 4 106210; 121520; 75740 4,701,186 7,429 0
2011-10-05 5 106210; 121520; 75740 4,701,186 7,519 0
2011-10-06 6 106210; 121520; 75740 4,701,186 7,849 0
2011-10-06 7 106210; 121520; 75740 4,701,186 7,712 0
2011-10-06 8 106210; 121520; 75740 4,701,186 7,499 0
2011-10-07 9 106210; 121520; 75740 4,701,186 7,424 0
2011-10-04 10 106210; 121520; 75740 4,701,186 7,483 0
2011-10-07 11 106210; 121520; 75740 4,701,186 7,149 0
2011-10-08 12 106210; 121520; 75740 4,701,186 6,899 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 VANTAGE ENERGY APPALACHIA LLC 156,106.49 50 0.00 0 0.00 0
2012 VANTAGE ENERGY APPALACHIA LLC 962,739.96 365 0.00 0 0.00 0
2013 VANTAGE ENERGY APPALACHIA LLC 609,508.60 351 0.00 0 0.00 0
2014 VANTAGE ENERGY APPALACHIA LLC 489,923.30 351 0.00 0 0.00 0
2015 VANTAGE ENERGY APPALACHIA LLC 413,934.83 361 0.00 0 0.00 0
2016 VANTAGE ENERGY APPALACHIA LLC 335,078.33 366 0.00 0 0.00 0
2017 RICE DRILLING B LLC 276,528.69 360 0.00 0 0.00 0
2018 RICE DRILLING B LLC 195,657.00 253 0.00 0 0.00 0
2019 RICE DRILLING B LLC 260,231.00 327 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 VANTAGE ENERGY APPALACHIA LLC Produced Fluid 795.00 Bbl INJECTION DISPOSAL WELL 4355
2011 VANTAGE ENERGY APPALACHIA LLC Produced Fluid 550.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2011 VANTAGE ENERGY APPALACHIA LLC Produced Fluid 2,158.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 VANTAGE ENERGY APPALACHIA LLC Fracing Fluid Waste 7,611.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2011 VANTAGE ENERGY APPALACHIA LLC Produced Fluid 500.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 VANTAGE ENERGY APPALACHIA LLC Produced Fluid 9,759.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 VANTAGE ENERGY APPALACHIA LLC Produced Fluid 1,230.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 VANTAGE ENERGY APPALACHIA LLC Produced Fluid 1,894.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2014 VANTAGE ENERGY APPALACHIA LLC Produced Fluid 187.00 Bbl INJECTION DISPOSAL WELL 34-155-24078
2014 VANTAGE ENERGY APPALACHIA LLC Produced Fluid 81.00 Bbl INJECTION DISPOSAL WELL 34-155-21447
2014 VANTAGE ENERGY APPALACHIA LLC Produced Fluid 36.67 Bbl INJECTION DISPOSAL WELL 34-059-24202
2014 VANTAGE ENERGY APPALACHIA LLC Produced Fluid 1,010.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2014 VANTAGE ENERGY APPALACHIA LLC Produced Fluid 421.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2014 VANTAGE ENERGY APPALACHIA LLC Produced Fluid 130.00 Bbl INJECTION DISPOSAL WELL 34-155-23759
2014 VANTAGE ENERGY APPALACHIA LLC Produced Fluid 382.00 Bbl INJECTION DISPOSAL WELL 34-155-23732
2015 VANTAGE ENERGY APPALACHIA LLC Produced Fluid 111.89 Bbl INJECTION DISPOSAL WELL 34-155-21447
2015 VANTAGE ENERGY APPALACHIA LLC Produced Fluid 96.86 Bbl INJECTION DISPOSAL WELL 34-155-23223
2015 VANTAGE ENERGY APPALACHIA LLC Produced Fluid 160.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015 VANTAGE ENERGY APPALACHIA LLC Produced Fluid 70.00 Bbl INJECTION DISPOSAL WELL 34-155-24078
2015 VANTAGE ENERGY APPALACHIA LLC Produced Fluid 594.67 Bbl REUSE OTHER THAN ROAD SPREADING
2015 VANTAGE ENERGY APPALACHIA LLC Produced Fluid 81.96 Bbl INJECTION DISPOSAL WELL 34-155-23732
2015 VANTAGE ENERGY APPALACHIA LLC Produced Fluid 112.50 Bbl INJECTION DISPOSAL WELL 34-155-23759
2016 VANTAGE ENERGY APPALACHIA LLC Other Oil & Gas Wastes 23.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2016 VANTAGE ENERGY APPALACHIA LLC Produced Fluid 870.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 VANTAGE ENERGY APPALACHIA LLC Produced Fluid 103.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2017 VANTAGE ENERGY APPALACHIA LLC Soil Contaminated by Oil & Gas Related Spills 0.19 Tons LANDFILL CID # 28726
2017 VANTAGE ENERGY APPALACHIA LLC Other Oil & Gas Wastes 42.00 Bbl REUSE (AT WELL PAD)
2017 VANTAGE ENERGY APPALACHIA LLC Produced Fluid 184.25 Bbl REUSE (AT WELL PAD)
2017 VANTAGE ENERGY APPALACHIA LLC Other Oil & Gas Wastes 5.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 VANTAGE ENERGY APPALACHIA LLC Servicing Fluid 2.98 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017 VANTAGE ENERGY APPALACHIA LLC Produced Fluid 28.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 VANTAGE ENERGY APPALACHIA LLC Produced Fluid 41.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2017 VANTAGE ENERGY APPALACHIA LLC Soil Contaminated by Oil 0.19 Tons LANDFILL CID # 28726
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 131.67 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Produced Fluid 223.53 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 76.67 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Produced Fluid 107.70 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2008026 Primary Facility 2011-10-04 Drilling/Alteration No Violations Noted Rig up to frac well; fracing stage 1&2 of 14 stages; Pumpco on site; Location E&S good;
2083760 Primary Facility 2012-06-19 Routine/Complete Inspection No Violations Noted
2126694 Primary Facility 2012-12-20 Routine/Complete Inspection No Violations Noted ROUTINE INSPECTION. SITE COMPLIANT AT TIME OF INSPECTION.
2128376 Primary Facility 2013-01-03 Routine/Complete Inspection No Violations Noted
2195680 Primary Facility 2013-08-13 Routine/Complete Inspection No Violations Noted ROUTINE INSPECTION. INSPECTED WELL SITE AS PER A COMPLAINT OF FUMES / ODOR FROM FRACING FROM A LOCAL RESIDENT. NO SMELLS OR MONITOR READINGS AT TIME OF INSPECTION.
2410877 Primary Facility 2015-08-05 Routine/Complete Inspection No Violations Noted Well in production. Well in compliance.

For data sources see[8]

References