If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-123-47142 | | Well ID: 37-123-47142 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 41.892456, -79.331486 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 19: | Line 19: | ||
| Farm/Lease Name: PITT LEASE 2942 | | Farm/Lease Name: PITT LEASE 2942 | ||
|- | |- | ||
− | | License Status: | + | | License Status: |
|- | |- | ||
− | | Spud Date: | + | | Spud Date: |
|- | |- | ||
− | | Permit Date: | + | | Permit Date: 2013-03-21 |
+ | |- | ||
+ | | Well Type: OIL | ||
|- | |- | ||
| Unconventional Well: N | | Unconventional Well: N | ||
|- | |- | ||
| Configuration: Vertical Well | | Configuration: Vertical Well | ||
+ | |- | ||
+ | | Conservation: No | ||
|- | |- | ||
| Latitude: 41.892456 | | Latitude: 41.892456 | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2013-03-21 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2013-08-27 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2013-08-29 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2013-10-04 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2013-12-02 | ||
+ | | NEWLY DRILLED | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 66: | Line 132: | ||
| style="text-align: right;" | 196.46 | | style="text-align: right;" | 196.46 | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
− | | style="text-align: right;" | 77. | + | | style="text-align: right;" | 77.5 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
Line 72: | Line 138: | ||
| [[CATALYST ENERGY INC]] | | [[CATALYST ENERGY INC]] | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 50.19 | | style="text-align: right;" | 50.19 | ||
| style="text-align: right;" | 152 | | style="text-align: right;" | 152 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2016 | | 2016 | ||
| [[CATALYST ENERGY INC]] | | [[CATALYST ENERGY INC]] | ||
− | | style="text-align: right;" | 118. | + | | style="text-align: right;" | 118.1 |
| style="text-align: right;" | 244 | | style="text-align: right;" | 244 | ||
| style="text-align: right;" | 136.53 | | style="text-align: right;" | 136.53 | ||
| style="text-align: right;" | 244 | | style="text-align: right;" | 244 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2017 | | 2017 | ||
Line 94: | Line 160: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2018 | | 2018 | ||
Line 103: | Line 169: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
|} | |} | ||
Line 115: | Line 181: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity | ||
Line 120: | Line 187: | ||
!scope="col" | Waste Facility ID | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | 2014 | + | | 2014 |
− | | Produced Fluid | + | | [[CATALYST ENERGY INC]] |
+ | | Produced Fluid | ||
| style="text-align: right;" | 930.32 Bbl | | style="text-align: right;" | 930.32 Bbl | ||
| CENT WASTE TRT FAC NPDES DISCHARGE | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
| PA0102784 | | PA0102784 | ||
|- | |- | ||
− | | 2016 | + | | 2015 |
− | | Produced Fluid | + | | [[CATALYST ENERGY INC]] |
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 8.35 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
+ | | PA0102784 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
| style="text-align: right;" | 11.00 Bbl | | style="text-align: right;" | 11.00 Bbl | ||
| CENT WASTE TRT FAC NPDES DISCHARGE | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
| PA0101508 | | PA0101508 | ||
|- | |- | ||
− | | 2016- | + | | 2016 |
− | | Produced Fluid | + | | [[CATALYST ENERGY INC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
+ | | style="text-align: right;" | 7.80 Bbl | ||
+ | | STORAGE PENDING DISPOSAL OR REUSE | ||
+ | | | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 37.80 Bbl | ||
| ROAD SPREADING | | ROAD SPREADING | ||
| | | | ||
|- | |- | ||
− | | | + | | 2017 |
− | | Produced Fluid | + | | [[CATALYST ENERGY INC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
− | | | + | | style="text-align: right;" | 5.48 Bbl |
+ | | ROAD SPREADING | ||
| | | | ||
|- | |- | ||
− | | 2017 | + | | 2017 |
− | | | + | | [[CATALYST ENERGY INC]] |
− | + | | Produced Fluid | |
− | |||
− | |||
− | |||
− | |||
− | | Produced Fluid | ||
| style="text-align: right;" | 266.00 Bbl | | style="text-align: right;" | 266.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
| PAS2D215BWAR | | PAS2D215BWAR | ||
|- | |- | ||
− | | 2017 | + | | 2017 |
− | | Produced Fluid | + | | [[CATALYST ENERGY INC]] |
+ | | Produced Fluid | ||
| style="text-align: right;" | 38.14 Bbl | | style="text-align: right;" | 38.14 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
| WMGR123NW005 | | WMGR123NW005 | ||
|- | |- | ||
− | | 2017- | + | | 2017 |
− | | Produced Fluid | + | | [[CATALYST ENERGY INC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
− | | | + | | style="text-align: right;" | 91.00 Bbl |
− | | | + | | CENT WASTE TRT FAC NPDES DISCHARGE |
+ | | PA0101508 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 146.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | PAS2D215BWAR | ||
|- | |- | ||
− | | 2018 | + | | 2018 |
− | | Produced Fluid | + | | [[CATALYST ENERGY INC]] |
+ | | Produced Fluid | ||
| style="text-align: right;" | 7.14 Bbl | | style="text-align: right;" | 7.14 Bbl | ||
| CENT WASTE TRT FAC NPDES DISCHARGE | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
| PA0101508 | | PA0101508 | ||
|- | |- | ||
− | | | + | | 2019 |
− | | Produced Fluid | + | | [[CATALYST ENERGY INC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
+ | | style="text-align: right;" | 49.33 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
| PAS2D215BWAR | | PAS2D215BWAR | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 10.00 Bbl | ||
+ | | PUBLIC SEWAGE TREATMENT PLANT | ||
+ | | PA0023213 | ||
|- | |- | ||
|} | |} | ||
Line 199: | Line 297: | ||
| 2200276 | | 2200276 | ||
| Primary Facility | | Primary Facility | ||
− | | 08 | + | | 2013-08-29 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 206: | Line 304: | ||
| 2281242 | | 2281242 | ||
| Primary Facility | | Primary Facility | ||
− | | 06 | + | | 2014-06-24 |
| Site Restoration | | Site Restoration | ||
| No Violations Noted | | No Violations Noted | ||
Line 248: | Line 346: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==References== | ==References== | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Pennsylvania Wells]] | [[Category:Pennsylvania Wells]] |
Well ID: 37-123-47142 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.892456,"lon":-79.331486,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Warren | |
Municipality: Brokenstraw Township | |
Operator Name: CATALYST ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: PITT LEASE 2942 | |
License Status: | |
Spud Date: | |
Permit Date: 2013-03-21 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.892456 | |
Longitude: -79.331486 |
Date | Event |
---|---|
2013-03-21 | New Permit Application |
2013-08-27 | Performed Spud Operation |
2013-08-29 | Drilling Completion |
2013-10-04 | Perforation |
2013-12-02 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | CATALYST ENERGY INC | 1,350.24 | 365 | 196.46 | 365 | 77.5 | 365 |
2015 | CATALYST ENERGY INC | 0.00 | 0 | 50.19 | 152 | 0.00 | 0 |
2016 | CATALYST ENERGY INC | 118.1 | 244 | 136.53 | 244 | 0.00 | 0 |
2017 | CATALYST ENERGY INC | 179.50 | 365 | 197.88 | 365 | 0.00 | 0 |
2018 | CATALYST ENERGY INC | 41.90 | 365 | 77.26 | 365 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | CATALYST ENERGY INC | Produced Fluid | 930.32 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2015 | CATALYST ENERGY INC | Produced Fluid | 8.35 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2016 | CATALYST ENERGY INC | Produced Fluid | 11.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 7.80 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | CATALYST ENERGY INC | Produced Fluid | 37.80 Bbl | ROAD SPREADING | |
2017 | CATALYST ENERGY INC | Produced Fluid | 5.48 Bbl | ROAD SPREADING | |
2017 | CATALYST ENERGY INC | Produced Fluid | 266.00 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2017 | CATALYST ENERGY INC | Produced Fluid | 38.14 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2017 | CATALYST ENERGY INC | Produced Fluid | 91.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | CATALYST ENERGY INC | Produced Fluid | 146.00 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2018 | CATALYST ENERGY INC | Produced Fluid | 7.14 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2019 | CATALYST ENERGY INC | Produced Fluid | 49.33 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2019 | CATALYST ENERGY INC | Produced Fluid | 10.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2200276 | Primary Facility | 2013-08-29 | Drilling/Alteration | No Violations Noted | |
2281242 | Primary Facility | 2014-06-24 | Site Restoration | No Violations Noted | Conventional oil well completed and operational. The frac pit was properly closed and the well site has approximately 70% vegetative cover. There were no leaks or spills. No violations noted at this time. |
2626911 | Primary Facility | 2017-08-18 | Routine/Complete Inspection | No Violations Noted | This is a producing combination well with an electric powered pump jack attached. The valves appear to be opened. No spills or leaks are noted on this site. The site is stable and vegetated. The well is tagged, and the site ID sign is on site. |
For data sources see[7]