X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-123-47142"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-123-47142
 
| Well ID: 37-123-47142
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.892456, -79.331486 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.892456, -79.331486 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: PITT LEASE 2942
 
| Farm/Lease Name: PITT LEASE 2942
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 08/27/2013
+
| Spud Date:  
 
|-
 
|-
| Permit Date: 3/21/2013
+
| Permit Date: 2013-03-21
 +
|-
 +
| Well Type: OIL
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.892456
 
| Latitude: 41.892456
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2013-03-21
 +
| New Permit Application
 +
|-
 +
| 2013-08-27
 +
| Performed Spud Operation
 +
|-
 +
| 2013-08-29
 +
| Drilling Completion
 +
|-
 +
| 2013-10-04
 +
| Perforation
 +
|-
 +
| 2013-12-02
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 66: Line 132:
 
| style="text-align: right;" | 196.46
 
| style="text-align: right;" | 196.46
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
| style="text-align: right;" | 77.50
+
| style="text-align: right;" | 77.5
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
Line 72: Line 138:
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 50.19
 
| style="text-align: right;" | 50.19
 
| style="text-align: right;" | 152
 
| style="text-align: right;" | 152
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| style="text-align: right;" | 118.10
+
| style="text-align: right;" | 118.1
 
| style="text-align: right;" | 244
 
| style="text-align: right;" | 244
 
| style="text-align: right;" | 136.53
 
| style="text-align: right;" | 136.53
 
| style="text-align: right;" | 244
 
| style="text-align: right;" | 244
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 94: Line 160:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 103: Line 169:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 115: Line 181:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 120: Line 187:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2014-0
+
| 2014
| Produced Fluid (in Barrels)
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 930.32 Bbl
 
| style="text-align: right;" | 930.32 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2016-0
+
| 2015
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 8.35 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0102784
 +
|-
 +
| 2016
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 11.00 Bbl
 
| style="text-align: right;" | 11.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2016-0
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
| style="text-align: right;" | 11.00 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 7.80 Bbl
 +
| STORAGE PENDING DISPOSAL OR REUSE
 +
|
 +
|-
 +
| 2016
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 37.80 Bbl
 
| ROAD SPREADING
 
| ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2016-0
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
| style="text-align: right;" | 7.80 Bbl
+
| Produced Fluid
| STORAGE PENDING DISPOSAL OR REUSE
+
| style="text-align: right;" | 5.48 Bbl
 +
| ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2017-0
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
| style="text-align: right;" | 91.00 Bbl
+
| Produced Fluid
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0101508
 
|-
 
| 2017-0
 
| Produced Fluid (in Barrels) RWC 802
 
 
| style="text-align: right;" | 266.00 Bbl
 
| style="text-align: right;" | 266.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| PAS2D215BWAR
 
| PAS2D215BWAR
 
|-
 
|-
| 2017-0
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 38.14 Bbl
 
| style="text-align: right;" | 38.14 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW005
 
| WMGR123NW005
 
|-
 
|-
| 2017-0
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
| style="text-align: right;" | 5.48 Bbl
+
| Produced Fluid
| ROAD SPREADING
+
| style="text-align: right;" | 91.00 Bbl
|  
+
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0101508
 +
|-
 +
| 2018
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 146.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D215BWAR
 
|-
 
|-
| 2018-0
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 7.14 Bbl
 
| style="text-align: right;" | 7.14 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2018-0
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
| style="text-align: right;" | 146.00 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 49.33 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| PAS2D215BWAR
 
| PAS2D215BWAR
 +
|-
 +
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 10.00 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0023213
 
|-
 
|-
 
|}
 
|}
Line 199: Line 297:
 
| 2200276
 
| 2200276
 
| Primary Facility
 
| Primary Facility
| 08/29/2013
+
| 2013-08-29
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 206: Line 304:
 
| 2281242
 
| 2281242
 
| Primary Facility
 
| Primary Facility
| 06/24/2014
+
| 2014-06-24
 
| Site Restoration
 
| Site Restoration
 
| No Violations Noted
 
| No Violations Noted
Line 248: Line 346:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 00:22, 15 May 2020

Well Details

Well ID: 37-123-47142
Loading map...
Country: United States
State: Pennsylvania
County: Warren
Municipality: Brokenstraw Township
Operator Name: CATALYST ENERGY INC
Well Pad ID:
Farm/Lease Name: PITT LEASE 2942
License Status:
Spud Date:
Permit Date: 2013-03-21
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.892456
Longitude: -79.331486

For data sources see[1][2][3]

Well History

Date Event
2013-03-21 New Permit Application
2013-08-27 Performed Spud Operation
2013-08-29 Drilling Completion
2013-10-04 Perforation
2013-12-02 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 CATALYST ENERGY INC 1,350.24 365 196.46 365 77.5 365
2015 CATALYST ENERGY INC 0.00 0 50.19 152 0.00 0
2016 CATALYST ENERGY INC 118.1 244 136.53 244 0.00 0
2017 CATALYST ENERGY INC 179.50 365 197.88 365 0.00 0
2018 CATALYST ENERGY INC 41.90 365 77.26 365 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 CATALYST ENERGY INC Produced Fluid 930.32 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2015 CATALYST ENERGY INC Produced Fluid 8.35 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2016 CATALYST ENERGY INC Produced Fluid 11.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016 CATALYST ENERGY INC Produced Fluid 7.80 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 CATALYST ENERGY INC Produced Fluid 37.80 Bbl ROAD SPREADING
2017 CATALYST ENERGY INC Produced Fluid 5.48 Bbl ROAD SPREADING
2017 CATALYST ENERGY INC Produced Fluid 266.00 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2017 CATALYST ENERGY INC Produced Fluid 38.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 CATALYST ENERGY INC Produced Fluid 91.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2018 CATALYST ENERGY INC Produced Fluid 146.00 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2018 CATALYST ENERGY INC Produced Fluid 7.14 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2019 CATALYST ENERGY INC Produced Fluid 49.33 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2019 CATALYST ENERGY INC Produced Fluid 10.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2200276 Primary Facility 2013-08-29 Drilling/Alteration No Violations Noted
2281242 Primary Facility 2014-06-24 Site Restoration No Violations Noted Conventional oil well completed and operational. The frac pit was properly closed and the well site has approximately 70% vegetative cover. There were no leaks or spills. No violations noted at this time.
2626911 Primary Facility 2017-08-18 Routine/Complete Inspection No Violations Noted This is a producing combination well with an electric powered pump jack attached. The valves appear to be opened. No spills or leaks are noted on this site. The site is stable and vegetated. The well is tagged, and the site ID sign is on site.

For data sources see[7]

References