X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-125-22108"

m
 
m
 
(8 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-125-22108
 
| Well ID: 37-125-22108
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.111022, -80.511727 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.111022, -80.511728 | width=100% | height=100% }}
 +
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 +
|-
 +
| County: [[Washington_County,_Pennsylvania|Washington]]
 +
|-
 +
| Municipality: [[Donegal Township,_Washington_County,_Pennsylvania|Donegal Township]]
 
|-
 
|-
 
| Operator Name: [[BELDEN & BLAKE CORP]]
 
| Operator Name: [[BELDEN & BLAKE CORP]]
 
|-
 
|-
| First Permit Date: 2003-10-27
+
| Well Pad ID:  
 +
|-
 +
| Farm/Lease Name: FAIRGROUND UNIT 2
 
|-
 
|-
| Last Permit Date: 2003-10-27
+
| License Status: PLUGGED & ABANDONED
 
|-
 
|-
| Spud Date: 2003-11-03
+
| Spud Date:  
 
|-
 
|-
| Unconventional: No
+
| Permit Date: 2003-10-27
 
|-
 
|-
| Horizontal: No
+
| Well Type: GAS
 
|-
 
|-
| Violations: None
+
| Unconventional Well: N
 +
|-
 +
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.111022
 
| Latitude: 40.111022
 
|-
 
|-
| Longitude: -80.511727
+
| Longitude: -80.511728
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2003-10-27
 +
| New Permit Application
 +
|-
 +
| 2003-11-03
 +
| Performed Spud Operation
 +
|-
 +
| 2003-12-01
 +
| Drilling Completion
 +
|-
 +
| 2004-01-13
 +
| Drilling Completion
 +
|-
 +
| 2004-04-14
 +
| NEWLY DRILLED
 +
|-
 +
| 2004-06-02
 +
| FULLY PLUGGED
 
|-
 
|-
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
== Production Data ==
+
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Job Number
!scope="col" | GAS QUANTITY
+
!scope="col" | Job Start Date
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Job End Date
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | True Vertical Depth (ft)
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Total Water Volume (gal)
!scope="col" | OIL QUANTITY
+
!scope="col" | Total Non-Water Volume (gal)
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
| 2010-0
+
|}-->
| style="text-align:right;" | 0.0
+
<!--==== Fluid Composition Data ====
| style="text-align:right;" | 0.0
+
{| class="wikitable sortable" width="95%"
| style="text-align:right;" | 0.0
+
!scope="col" | Job Number
| style="text-align:right;" | 0.0
+
!scope="col" | Trade Name
| style="text-align:right;" | 0.0
+
!scope="col" | Supplier
| style="text-align:right;" | 0.0
+
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 
|-
 
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 
|-
 
|-
| 2009-0
+
| 2003
| style="text-align:right;" | 0.0
+
| [[BELDEN & BLAKE CORP]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2009
 +
| [[BELDEN & BLAKE CORP]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2003-0
+
| 2010
| style="text-align:right;" | 0.0
+
| [[BELDEN & BLAKE CORP]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator
!scope="col" | QUANTITY
+
!scope="col" | Waste Type
!scope="col" | UNITS
+
!scope="col" | Quantity
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Disposal Method
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2003-0
+
| 2003
| DRILLING
+
| [[BELDEN & BLAKE CORP]]
| style="text-align:right;" | 11156.0
+
| Drilling
| Bbl
+
| style="text-align: right;" | 168.00 Bbl
| ROAD SPREADING
+
| Brine or Industrial Waste Treatment Plt
|
+
| PA0102784
| ARROW OILFIELD SERVICES
 
|
 
|  
 
 
|-
 
|-
|-
+
| 2003
| 2003-0
+
| [[BELDEN & BLAKE CORP]]
| DRILLING
+
| Drilling
| style="text-align:right;" | 11156.0
+
| style="text-align: right;" | 10,988.00 Bbl
| Bbl
+
| Road Spreading
| BRINE OR INDUSTRIAL WASTE TREATMENT PLT
 
|
 
| WASTE TREATMENT CORP
 
|
 
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 
| 1321006
 
| 1321006
 +
| Primary Facility
 
| 2003-11-06
 
| 2003-11-06
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| cementing 9 5/8
 
| cementing 9 5/8
|
 
|-
 
 
|-
 
|-
 
| 1321375
 
| 1321375
 +
| Primary Facility
 
| 2004-03-22
 
| 2004-03-22
 +
| Bond Release
 
| No Violations Noted
 
| No Violations Noted
 
| Both plugs on same bench.  Grading, ditching ok.  reveg. partial at this time.  Bench landing to be converted to fairgrounds parking.  Field check reveals vent pipe w/proptective posts here at monuments which are identified.  Some slips on the backfill.  Awaits final grading, & topsoil redistribution, slip repair, ... Will recheck at later date.  Monuments OK w/ID attached..
 
| Both plugs on same bench.  Grading, ditching ok.  reveg. partial at this time.  Bench landing to be converted to fairgrounds parking.  Field check reveals vent pipe w/proptective posts here at monuments which are identified.  Some slips on the backfill.  Awaits final grading, & topsoil redistribution, slip repair, ... Will recheck at later date.  Monuments OK w/ID attached..
|
 
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 07:27, 15 May 2020

Well Details

Well ID: 37-125-22108
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Donegal Township
Operator Name: BELDEN & BLAKE CORP
Well Pad ID:
Farm/Lease Name: FAIRGROUND UNIT 2
License Status: PLUGGED & ABANDONED
Spud Date:
Permit Date: 2003-10-27
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.111022
Longitude: -80.511728

For data sources see[1][2][3]

Well History

Date Event
2003-10-27 New Permit Application
2003-11-03 Performed Spud Operation
2003-12-01 Drilling Completion
2004-01-13 Drilling Completion
2004-04-14 NEWLY DRILLED
2004-06-02 FULLY PLUGGED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2003 BELDEN & BLAKE CORP 0.00 0 0.00 0 0.00 0
2009 BELDEN & BLAKE CORP 0.00 0 0.00 0 0.00 0
2010 BELDEN & BLAKE CORP 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2003 BELDEN & BLAKE CORP Drilling 168.00 Bbl Brine or Industrial Waste Treatment Plt PA0102784
2003 BELDEN & BLAKE CORP Drilling 10,988.00 Bbl Road Spreading

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1321006 Primary Facility 2003-11-06 Drilling/Alteration No Violations Noted cementing 9 5/8
1321375 Primary Facility 2004-03-22 Bond Release No Violations Noted Both plugs on same bench. Grading, ditching ok. reveg. partial at this time. Bench landing to be converted to fairgrounds parking. Field check reveals vent pipe w/proptective posts here at monuments which are identified. Some slips on the backfill. Awaits final grading, & topsoil redistribution, slip repair, ... Will recheck at later date. Monuments OK w/ID attached..

For data sources see[7]

References