X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-085-23992"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-085-23992
 
| Well ID: 37-085-23992
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.466264, -80.303855 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.466264, -80.303855 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: AGNEW L 1
 
| Farm/Lease Name: AGNEW L 1
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 2006-05-09
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2006-01-13
 
| Permit Date: 2006-01-13
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 41.466264
 
| Latitude: 41.466264
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2006-01-13
 +
| New Permit Application
 +
|-
 +
| 2006-05-09
 +
| Performed Spud Operation
 +
|-
 +
| 2006-05-15
 +
| Drilling Completion
 +
|-
 +
| 2006-05-24
 +
| Perforation
 +
|-
 +
| 2006-12-28
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 101:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 87: Line 128:
 
| 2006
 
| 2006
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| style="text-align: right;" | 7,635.00
+
| style="text-align: right;" | 7635.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 96: Line 137:
 
| 2007
 
| 2007
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| style="text-align: right;" | 6,553.00
+
| style="text-align: right;" | 6553.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 105: Line 146:
 
| 2008
 
| 2008
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| style="text-align: right;" | 3,775.00
+
| style="text-align: right;" | 3775.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 114: Line 155:
 
| 2009
 
| 2009
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| style="text-align: right;" | 2,588.00
+
| style="text-align: right;" | 2588.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 232: Line 273:
 
| 2010
 
| 2010
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 50.00 Bbl
 
| style="text-align: right;" | 50.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 239: Line 280:
 
| 2012
 
| 2012
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 100.00 Bbl
 
| style="text-align: right;" | 100.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 246: Line 287:
 
| 2013
 
| 2013
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 +
| style="text-align: right;" | 10 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0101508
 +
|-
 +
| 2013
 +
| [[VISTA OPR INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 10.00 Bbl
 
| style="text-align: right;" | 10.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE

Latest revision as of 09:49, 15 May 2020

Well Details

Well ID: 37-085-23992
Loading map...
Country: United States
State: Pennsylvania
County: Mercer
Municipality: Salem Township
Operator Name: DIAMOND ENERGY PARTNERS LLC
Well Pad ID:
Farm/Lease Name: AGNEW L 1
License Status: ACTIVE
Spud Date:
Permit Date: 2006-01-13
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: Yes
Latitude: 41.466264
Longitude: -80.303855

For data sources see[1][2][3]

Well History

Date Event
2006-01-13 New Permit Application
2006-05-09 Performed Spud Operation
2006-05-15 Drilling Completion
2006-05-24 Perforation
2006-12-28 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2006 VISTA OPR INC 7635.00 365 0.00 0 0.00 0
2007 VISTA OPR INC 6553.00 365 0.00 0 0.00 0
2008 VISTA OPR INC 3775.00 365 0.00 0 0.00 0
2009 VISTA OPR INC 2588.00 365 0.00 0 0.00 0
2010 VISTA OPR INC 2,350.00 365 0.00 0 0.00 0
2011 VISTA OPR INC 1,864.00 365 0.00 0 0.00 0
2012 VISTA OPR INC 1,652.00 365 0.00 0 0.00 0
2013 VISTA OPR INC 798.00 365 71.10 365 0.00 0
2014 VISTA OPR INC 1,211.00 365 0.00 0 0.00 0
2015 VISTA OPR INC 1,370.00 365 0.00 0 0.00 0
2016 VISTA OPR INC 54.00 365 0.00 0 0.00 0
2017 VISTA OPR INC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2006 VISTA OPR INC Brine 330.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2008 VISTA OPR INC Brine 170.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2009 VISTA OPR INC Brine 110.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2010 VISTA OPR INC Produced Fluid 50.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2012 VISTA OPR INC Produced Fluid 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2013 VISTA OPR INC Produced Fluid 10 Bbl CENT WASTE TRT FAC NPDES PA0101508
2013 VISTA OPR INC Produced Fluid 10.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1534894 Primary Facility 2006-05-11 Drilling/Alteration No Violations Noted

For data sources see[7]

References