X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-063-24507"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-063-24507
 
| Well ID: 37-063-24507
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.560702, -79.237134 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.560702, -79.237134 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: BARBARA STILES 1
 
| Farm/Lease Name: BARBARA STILES 1
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 12/06/1978
+
| Spud Date: 1978-12-06
 
|-
 
|-
| Permit Date: 10/30/1978
+
| Permit Date: 1978-10-30
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.560702
 
| Latitude: 40.560702
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1978-10-30
 +
| New Permit Application
 +
|-
 +
| 1978-12-06
 +
| Performed Spud Operation
 +
|-
 +
| 1978-12-12
 +
| Drilling Completion
 +
|-
 +
| 1978-12-19
 +
| Perforation
 +
|-
 +
| 1979-01-11
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 61: Line 127:
 
|-
 
|-
 
| 1986
 
| 1986
| [[ADOBE RESOURCES CORP]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 11,921.00
 
| style="text-align: right;" | 11,921.00
 
| style="text-align: right;" | 121
 
| style="text-align: right;" | 121
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1987
 
| 1987
| [[ADOBE RESOURCES CORP]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 3,902.00
 
| style="text-align: right;" | 3,902.00
 
| style="text-align: right;" | 55
 
| style="text-align: right;" | 55
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1988
 
| 1988
| [[ADOBE RESOURCES CORP]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 1,947.00
 
| style="text-align: right;" | 1,947.00
 
| style="text-align: right;" | 21
 
| style="text-align: right;" | 21
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1989
 
| 1989
| [[ADOBE RESOURCES CORP]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 6,082.00
 
| style="text-align: right;" | 6,082.00
 
| style="text-align: right;" | 93
 
| style="text-align: right;" | 93
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1991
 
| 1991
| [[ADOBE RESOURCES CORP]]
+
| style="text-align: right;" |
| style="text-align: right;" | 9,348.00
+
| style="text-align: right;" | 9348.00
 
| style="text-align: right;" | 277
 
| style="text-align: right;" | 277
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1994
 +
| [[ENERGY CORP OF AMER]]
 +
| style="text-align: right;" | 7613.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1995
 +
| [[ENERGY CORP OF AMER]]
 +
| style="text-align: right;" | 7979.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1996
 
| 1996
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 6,134.00
+
| style="text-align: right;" | 6134
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1997
 
| 1997
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 5,419.00
+
| style="text-align: right;" | 5419
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1998
 
| 1998
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 3,095.00
+
| style="text-align: right;" | 3095
 
| style="text-align: right;" | 212
 
| style="text-align: right;" | 212
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999
 
| 1999
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 4,862.00
+
| style="text-align: right;" | 4862
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000
 
| 2000
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 4,319.00
+
| style="text-align: right;" | 4319
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001
 
| 2001
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 3,664.00
+
| style="text-align: right;" | 3664
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002
 
| 2002
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 2,333.00
+
| style="text-align: right;" | 2333
 
| style="text-align: right;" | 307
 
| style="text-align: right;" | 307
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003
 
| 2003
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 3,011.00
+
| style="text-align: right;" | 3011
 
| style="text-align: right;" | 302
 
| style="text-align: right;" | 302
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004
 
| 2004
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 2,139.00
+
| style="text-align: right;" | 2139
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005
 
| 2005
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 1,990.00
+
| style="text-align: right;" | 1990
 
| style="text-align: right;" | 303
 
| style="text-align: right;" | 303
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006
 
| 2006
| style="text-align: right;" |
+
| [[ENERGY CORP OF AMER]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007
 
| 2007
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 1,611.00
+
| style="text-align: right;" | 1611.00
 
| style="text-align: right;" | 182
 
| style="text-align: right;" | 182
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
 
| style="text-align: right;" | 302.00
 
| style="text-align: right;" | 302.00
 
| style="text-align: right;" | 181
 
| style="text-align: right;" | 181
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
| style="text-align: right;" |
+
| [[ENERGY CORP OF AMER]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 236: Line 320:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 245: Line 329:
 
| style="text-align: right;" | 277
 
| style="text-align: right;" | 277
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 254: Line 338:
 
| style="text-align: right;" | 297
 
| style="text-align: right;" | 297
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 263: Line 347:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 272: Line 356:
 
| style="text-align: right;" | 272
 
| style="text-align: right;" | 272
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 281: Line 365:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 290: Line 374:
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 299: Line 383:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 308: Line 392:
 
| style="text-align: right;" | 306
 
| style="text-align: right;" | 306
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[GREYLOCK CONVENTIONAL LLC]]
 +
| style="text-align: right;" | 1,120.00
 +
| style="text-align: right;" | 337
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 322: Line 415:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 361: Line 455:
 
!scope="col" | Penalty Amount
 
!scope="col" | Penalty Amount
 
!scope="col" | Amount Collected
 
!scope="col" | Amount Collected
|-
 
|}-->
 
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
 
|-
 
|-
 
|}-->
 
|}-->

Latest revision as of 10:38, 15 May 2020

Well Details

Well ID: 37-063-24507
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: Center Township
Operator Name: GREYLOCK CONVENTIONAL LLC
Well Pad ID:
Farm/Lease Name: BARBARA STILES 1
License Status: ACTIVE
Spud Date: 1978-12-06
Permit Date: 1978-10-30
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.560702
Longitude: -79.237134

For data sources see[1][2][3]

Well History

Date Event
1978-10-30 New Permit Application
1978-12-06 Performed Spud Operation
1978-12-12 Drilling Completion
1978-12-19 Perforation
1979-01-11 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1986 11,921.00 121 0.00 0 0.00 0
1987 3,902.00 55 0.00 0 0.00 0
1988 1,947.00 21 0.00 0 0.00 0
1989 6,082.00 93 0.00 0 0.00 0
1991 9348.00 277 0.00 0 0.00 0
1994 ENERGY CORP OF AMER 7613.00 365 0.00 0 0.00 0
1995 ENERGY CORP OF AMER 7979.00 365 0.00 0 0.00 0
1996 ENERGY CORP OF AMER 6134 365 0.00 0 0.00 0
1997 ENERGY CORP OF AMER 5419 365 0.00 0 0.00 0
1998 ENERGY CORP OF AMER 3095 212 0.00 0 0.00 0
1999 ENERGY CORP OF AMER 4862 365 0.00 0 0.00 0
2000 ENERGY CORP OF AMER 4319 366 0.00 0 0.00 0
2001 ENERGY CORP OF AMER 3664 365 0.00 0 0.00 0
2002 ENERGY CORP OF AMER 2333 307 0.00 0 0.00 0
2003 ENERGY CORP OF AMER 3011 302 0.00 0 0.00 0
2004 ENERGY CORP OF AMER 2139 366 0.00 0 0.00 0
2005 ENERGY CORP OF AMER 1990 303 0.00 0 0.00 0
2006 ENERGY CORP OF AMER 0.00 0 0.00 0 0.00 0
2007 ENERGY CORP OF AMER 1611.00 182 0.00 0 0.00 0
2008 ENERGY CORP OF AMER 302.00 181 0.00 0 0.00 0
2009 ENERGY CORP OF AMER 0.00 0 0.00 0 0.00 0
2010 ENERGY CORP OF AMER 1,331.00 365 0.00 0 0.00 0
2011 ENERGY CORP OF AMER 1,444.00 277 0.00 0 0.00 0
2012 ENERGY CORP OF AMER 1,001.00 297 0.00 0 0.00 0
2013 ENERGY CORP OF AMER 733.00 365 0.00 0 0.00 0
2014 ENERGY CORP OF AMER 623.00 272 0.00 0 0.00 0
2015 ENERGY CORP OF AMER 898.00 365 0.00 0 0.00 0
2016 ENERGY CORP OF AMER 809.00 366 0.00 0 0.00 0
2017 GREYLOCK CONVENTIONAL LLC 822.00 365 0.00 0 0.00 0
2018 GREYLOCK CONVENTIONAL LLC 735.00 306 0.00 0 0.00 0
2019 GREYLOCK CONVENTIONAL LLC 1,120.00 337 0.00 0 0.00 0

For data sources see[5]


References