X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-115-20073"

m (Maintenance script moved page 42-115-20073 to 37-115-20073: -i0)
m
 
(10 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
| Well ID: 42-115-20073
+
| Well ID: 37-115-20073
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 41.716858, -76.076555 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.716858, -76.076556 | width=100% | height=100% }}
 +
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 +
|-
 +
| County: [[Susquehanna_County,_Pennsylvania|Susquehanna]]
 
|-
 
|-
| County: [[Susquehanna County, Pennsylvania|Susquehanna]]
+
| Municipality: [[Auburn Township,_Susquehanna_County,_Pennsylvania|Auburn Township]]
 
|-
 
|-
| Municipality: [[Auburn Township, Susquehanna County, Pennsylvania|Auburn Township]]
+
| Operator Name: [[CHESAPEAKE APPALACHIA LLC]]
 
|-
 
|-
| Operator Name: [[CHESAPEAKE APPALACHIA LLC|CHESAPEAKE APPALACHIA LLC]]
+
| Well Pad ID: [[147961]]
 
|-
 
|-
 
| Farm/Lease Name: CLAPPER 627103 2H
 
| Farm/Lease Name: CLAPPER 627103 2H
 
|-
 
|-
| First Permit Date: 2008-12-16
+
| License Status:  
 
|-
 
|-
| Last Permit Date: 2008-12-16
+
| Spud Date:  
 
|-
 
|-
| Spud Date: 2009-04-04
+
| Permit Date: 2008-12-16
 
|-
 
|-
| Unconventional: Yes
+
| Well Type: GAS
 
|-
 
|-
| Horizontal: Yes
+
| Unconventional Well: Y
 
|-
 
|-
| Producing: Yes
+
| Configuration: Horizontal Well
 
|-
 
|-
| Violations: None
+
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.716858
 
| Latitude: 41.716858
 
|-
 
|-
| Longitude: -76.076555
+
| Longitude: -76.076556
|-
 
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
== Well Inspection Data ==
+
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Date
!scope="col" | DATE
+
!scope="col" | Event
!scope="col" | DESCRIPTION
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
 
|-
 
|-
| 1794662
+
| 2008-12-16
| 2009-04-29
+
| New Permit Application
| No Violations Noted
 
| An existing road was used to access the well site.  The road and drill pad are stoned with limestone.  The Site ID sign and E/S Plan  were present at the entrance of the access road.  The pit had approximately 5' of freeboard.  At the time of inspection, the depth of drilling was at  6750'.    According to the drillers' log on site, Marcellus was encountered at approximately 6685'.  Some small shows of gas were encountered as noted on inspection form.
 
|  
 
 
|-
 
|-
 +
| 2009-04-04
 +
| Performed Spud Operation
 
|-
 
|-
| 1799725
+
| 2009-05-17
| 2009-05-21
+
| Drilling Completion
| No Violations Noted
 
| At the time of inspection, the drilling crew was tripping drill pipe out of the hole.  The company man indicated that the pipe was tripped out once in order to replace a bad motor.  Upon resuming drilling after replacing the motor, there was a spike in pressure.  During inspection it was not known what caused the pressure spike, but likely was a result of mud stuck in the pipe from setting it down in the rat hole.  Drilling depth was 12,122'.
 
 
 
During inspection, pump trucks were also on site pumping out liquid from the pit.  Approximately 6' of freeboard was observed in the pit.
 
 
 
 
 
|
 
 
|-
 
|-
 +
| 2009-09-09
 +
| Perforation
 
|-
 
|-
| 1822436
+
| 2009-09-09
| 2009-08-18
+
| Performed Stimulation  
| No Violations Noted
 
| At time of inspection I met with Company Man Max Oliver of Chesapeake.  Mr. Oliver informed me they were getting ready to perforate  Clapper 2H and 4H wells.  A small service rig was on site and set up over the hole.  Mr. Oliver indicated they are planning to perforate approximately 6 sections on each well.  Fracking is tentatively secheduled for Sept. 7th. Frac tanks were being staged on an upper field near the entrance to the property.    An excavator was also on site filling in the reserve pit with soil from adjacent stockpile. Pit was being compacted with sheepsfoot roller, and soil was hauled with large dump truck.    Pipe line workers were also installing pipe near the access road to the well pad.   
 
 
 
|
 
 
|-
 
|-
 +
| 2011-03-04
 +
| DEVIATED
 
|-
 
|-
| 1853171
+
|}
| 2010-01-04
+
For data sources see<ref>{{cite web
| No Violations Noted
+
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
| During a previous DEP inspection completed on 12/11/09, a violation was cited for failure to properly install a well tag on the completed wellOn January 4th 2010, the DEP received a letter and a picture from Chesapeake in response to the violation.  The letter indicates that a well tag was installed on the well on 12/19/09, which was made evident in a photograph received along with the letter.   
+
| date = 2020-02-27
 
+
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
Based on the above letter and photograph received, the operator has properly tagged the well, and the previous violation has been corrected. 
+
  | accessdate = 2020-02-27 }}</ref>
 
+
<!--== Fracking Activities ==
|  
+
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 
|-
 
|-
| 1968895
+
|}-->
| 2011-04-20
+
 
| No Violations Noted
+
== Stimulation Data ==
| Well is online.  Inspected cellar.  no evidence of bubbling.  Well is protected by chain-link fence.  No activity on site.  No violations observed.
+
{| class="wikitable sortable" width="95%"
|  
+
!scope="col" | Stimulation Date
|-
+
!scope="col" | Phase Number
|-
+
!scope="col" | Chemical Agent
| 2047583
+
!scope="col" | Volume (gal)
| 2012-03-05
+
!scope="col" | Treating Pressure (psi)
| No Violations Noted
+
!scope="col" | Breakdown Pressure (psi)
|  
 
|  
 
 
|-
 
|-
|-
+
| 2009-09-09
| 2047596
+
| style="text-align: right;" |
| 2012-03-05
+
 
| No Violations Noted
+
| style="text-align: right;" | 0
| Review weekly/post-storm inspections for 11/7 thru 12/26/2011.
+
| style="text-align: right;" | 0
|  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Completion Reports - Stimulations
 +
| publisher = Pennsylvania Department of Conservation and Natural Resources
 +
| date = 2020-03-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-03-02 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
|-
+
!scope="col" | Water Production Days
| 2012-2
 
| style="text-align:right;" | 428935.0
 
| style="text-align:right;" | 177.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
 
|-
 
|-
| 2012-1
+
| 2009
| style="text-align:right;" | 440528.0
+
| [[CHESAPEAKE APPALACHIA LLC]]
| style="text-align:right;" | 182.0
+
| style="text-align: right;" | 1041611.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 92
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2010
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| style="text-align: right;" | 2,433,549.00
 +
| style="text-align: right;" | 319
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-2
+
| 2011
| style="text-align:right;" | 597825.0
+
| [[CHESAPEAKE APPALACHIA LLC]]
| style="text-align:right;" | 184.0
+
| style="text-align: right;" | 1,260,176.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 364
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2012
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| style="text-align: right;" | 869,463.00
 +
| style="text-align: right;" | 359
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-1
+
| 2013
| style="text-align:right;" | 662351.0
+
| [[CHESAPEAKE APPALACHIA LLC]]
| style="text-align:right;" | 180.0
+
| style="text-align: right;" | 712,481.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2014
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| style="text-align: right;" | 743,334.00
 +
| style="text-align: right;" | 363
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2010-2
+
| 2015
| style="text-align:right;" | 1012973.0
+
| [[CHESAPEAKE APPALACHIA LLC]]
| style="text-align:right;" | 184.0
+
| style="text-align: right;" | 355,796.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 246
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2016
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| style="text-align: right;" | 697,416.00
 +
| style="text-align: right;" | 361
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2010-3
+
| 2017
| style="text-align:right;" | 2841152.0
+
| [[CHESAPEAKE APPALACHIA LLC]]
| style="text-align:right;" | 270.0
+
| style="text-align: right;" | 509,221.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 348
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2018
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| style="text-align: right;" | 457,567.00
 +
| style="text-align: right;" | 336
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2009-0
+
| 2019
| style="text-align:right;" | 1041611.0
+
| [[CHESAPEAKE APPALACHIA LLC]]
| style="text-align:right;" | 92.0
+
| style="text-align: right;" | 457,104.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 364
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator
!scope="col" | QUANTITY
+
!scope="col" | Waste Type
!scope="col" | UNITS
+
!scope="col" | Quantity
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Disposal Method
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|-
 
| 2012-2
 
| PRODUCED FLUID
 
| style="text-align:right;" | 55.0
 
| Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
| REUSE FOR HYDRAULIC FRACTURING
 
|
 
|
 
|-
 
 
|-
 
|-
| 2010-3
+
| 2010
| FRACING FLUID WASTE
+
| [[CHESAPEAKE APPALACHIA LLC]]
| style="text-align:right;" | 4795.0
+
| Fracing Fluid Waste
| Bbl
+
| style="text-align: right;" | 2,397.50 Bbl
 
| IDENTIFY METHOD IN COMMENTS
 
| IDENTIFY METHOD IN COMMENTS
 
|  
 
|  
| NOT LISTED (PROVIDE NAME & ADDRESS IN COMMENTS)
 
|
 
| PA
 
|-
 
 
|-
 
|-
| 2010-3
+
| 2010
| FRACING FLUID WASTE
+
| [[CHESAPEAKE APPALACHIA LLC]]
| style="text-align:right;" | 195.0
+
| Fracing Fluid Waste
| Bbl
+
| style="text-align: right;" | 97.50 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0008451
 
| PA0008451
| SUNBURY GENERATION WASTE WATER TRMT FAC
 
| SHAMOKIN DAM
 
| PA
 
 
|-
 
|-
 +
| 2011
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 36.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 
|-
 
|-
| 2011-1
+
| 2012
| FRACING FLUID WASTE
+
| [[CHESAPEAKE APPALACHIA LLC]]
| style="text-align:right;" | 18.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 73.20 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE FOR DRILLING OR PLUGGING
+
|-
 +
| 2013
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 191.50 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| PA
 
 
|-
 
|-
 +
| 2014
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 40.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NC008
 
|-
 
|-
| 2011-2
+
| 2014
| FRACING FLUID WASTE
+
| [[CHESAPEAKE APPALACHIA LLC]]
| style="text-align:right;" | 18.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 54.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE OF BRINE TO FRAC A WELL
+
|-
 +
| 2015
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 50.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 +
|-
 +
| 2017
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 37.50 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC008
 +
|-
 +
| 2017
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 56.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 +
|-
 +
| 2017
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 35.00 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
 +
| 2019
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 50.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC010
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 +
|-
 +
| 1794662
 +
| Primary Facility
 +
| 2009-04-29
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| An existing road was used to access the well site.  The road and drill pad are stoned with limestone.  The Site ID sign and E/S Plan  were present at the entrance of the access road.  The pit had approximately 5' of freeboard.  At the time of inspection, the depth of drilling was at  6750'.    According to the drillers' log on site, Marcellus was encountered at approximately 6685'.  Some small shows of gas were encountered as noted on inspection form.
 +
|-
 +
| 1799725
 +
| Primary Facility
 +
| 2009-05-21
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| At the time of inspection, the drilling crew was tripping drill pipe out of the hole.  The company man indicated that the pipe was tripped out once in order to replace a bad motor.  Upon resuming drilling after replacing the motor, there was a spike in pressure.  During inspection it was not known what caused the pressure spike, but likely was a result of mud stuck in the pipe from setting it down in the rat hole.  Drilling depth was 12,122'.
 +
|-
 +
| 1822436
 +
| Primary Facility
 +
| 2009-08-18
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| At time of inspection I met with Company Man Max Oliver of Chesapeake.  Mr. Oliver informed me they were getting ready to perforate  Clapper 2H and 4H wells.  A small service rig was on site and set up over the hole.  Mr. Oliver indicated they are planning to perforate approximately 6 sections on each well.  Fracking is tentatively secheduled for Sept. 7th.  Frac tanks were being staged on an upper field near the entrance to the property.    An excavator was also on site filling in the reserve pit with soil from adjacent stockpile. Pit was being compacted with sheepsfoot roller, and soil was hauled with large dump truck.    Pipe line workers were also installing pipe near the access road to the well pad.
 +
|-
 +
| 1853171
 +
| Primary Facility
 +
| 2010-01-04
 +
| Follow-up Inspection
 +
| No Violations Noted
 +
| During a previous DEP inspection completed on 12/11/09, a violation was cited for failure to properly install a well tag on the completed well.  On January 4th 2010, the DEP received a letter and a picture from Chesapeake in response to the violation.  The letter indicates that a well tag was installed on the well on 12/19/09, which was made evident in a photograph received along with the letter.
 
|-
 
|-
| 2012-1
+
| 1968895
| PRODUCED FLUID
+
| Primary Facility
| style="text-align:right;" | 18.2
+
| 2011-04-20
| Bbl
+
| Routine/Complete Inspection
| REUSE OTHER THAN ROAD SPREADING
+
| No Violations Noted
|  
+
| Well is online.  Inspected cellar.  no evidence of bubbling.  Well is protected by chain-link fence.  No activity on site.  No violations observed.
| REUSE FOR HYDRAULIC FRACTURING
+
|-
 +
| 2047583
 +
| Primary Facility
 +
| 2012-03-05
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2047596
 +
| Primary Facility
 +
| 2012-03-05
 +
| Administrative/File Review
 +
| No Violations Noted
 +
| Review weekly/post-storm inspections for 11/7 thru 12/26/2011.
 +
|-
 +
| 2650826
 +
| Primary Facility
 +
| 2017-10-23
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2711629
 +
| Primary Facility
 +
| 2018-03-28
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| I performed a RTNC inspection of the Clapper well site on March 28. The site had a long access road with two active log piles along it.  There was no impact from the log piles.  The road was stable and solid.  The pad surface was covered with #3 stone and stable. The wells were properly labeled.  The cut and fill slopes were well vegetated and stable.  The wells associated with this site are as follows:
 +
115-20073
 +
115-20108.
 +
 +
There were no erosional issues noted.
 +
 +
There were no violations.
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 19:46, 15 May 2020

Well Details

Well ID: 37-115-20073
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Auburn Township
Operator Name: CHESAPEAKE APPALACHIA LLC
Well Pad ID: 147961
Farm/Lease Name: CLAPPER 627103 2H
License Status:
Spud Date:
Permit Date: 2008-12-16
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.716858
Longitude: -76.076556

For data sources see[1][2][3]

Well History

Date Event
2008-12-16 New Permit Application
2009-04-04 Performed Spud Operation
2009-05-17 Drilling Completion
2009-09-09 Perforation
2009-09-09 Performed Stimulation
2011-03-04 DEVIATED

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2009-09-09 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 CHESAPEAKE APPALACHIA LLC 1041611.00 92 0.00 0 0.00 0
2010 CHESAPEAKE APPALACHIA LLC 2,433,549.00 319 0.00 0 0.00 0
2011 CHESAPEAKE APPALACHIA LLC 1,260,176.00 364 0.00 0 0.00 0
2012 CHESAPEAKE APPALACHIA LLC 869,463.00 359 0.00 0 0.00 0
2013 CHESAPEAKE APPALACHIA LLC 712,481.00 365 0.00 0 0.00 0
2014 CHESAPEAKE APPALACHIA LLC 743,334.00 363 0.00 0 0.00 0
2015 CHESAPEAKE APPALACHIA LLC 355,796.00 246 0.00 0 0.00 0
2016 CHESAPEAKE APPALACHIA LLC 697,416.00 361 0.00 0 0.00 0
2017 CHESAPEAKE APPALACHIA LLC 509,221.00 348 0.00 0 0.00 0
2018 CHESAPEAKE APPALACHIA LLC 457,567.00 336 0.00 0 0.00 0
2019 CHESAPEAKE APPALACHIA LLC 457,104.00 364 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 CHESAPEAKE APPALACHIA LLC Fracing Fluid Waste 2,397.50 Bbl IDENTIFY METHOD IN COMMENTS
2010 CHESAPEAKE APPALACHIA LLC Fracing Fluid Waste 97.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2011 CHESAPEAKE APPALACHIA LLC Fracing Fluid Waste 36.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHESAPEAKE APPALACHIA LLC Produced Fluid 73.20 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHESAPEAKE APPALACHIA LLC Produced Fluid 191.50 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHESAPEAKE APPALACHIA LLC Produced Fluid 40.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC008
2014 CHESAPEAKE APPALACHIA LLC Produced Fluid 54.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHESAPEAKE APPALACHIA LLC Produced Fluid 50.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHESAPEAKE APPALACHIA LLC Produced Fluid 37.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2017 CHESAPEAKE APPALACHIA LLC Produced Fluid 56.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 CHESAPEAKE APPALACHIA LLC Produced Fluid 35.00 Bbl REUSE (AT WELL PAD)
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 50.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1794662 Primary Facility 2009-04-29 Drilling/Alteration No Violations Noted An existing road was used to access the well site. The road and drill pad are stoned with limestone. The Site ID sign and E/S Plan were present at the entrance of the access road. The pit had approximately 5' of freeboard. At the time of inspection, the depth of drilling was at 6750'. According to the drillers' log on site, Marcellus was encountered at approximately 6685'. Some small shows of gas were encountered as noted on inspection form.
1799725 Primary Facility 2009-05-21 Drilling/Alteration No Violations Noted At the time of inspection, the drilling crew was tripping drill pipe out of the hole. The company man indicated that the pipe was tripped out once in order to replace a bad motor. Upon resuming drilling after replacing the motor, there was a spike in pressure. During inspection it was not known what caused the pressure spike, but likely was a result of mud stuck in the pipe from setting it down in the rat hole. Drilling depth was 12,122'.
1822436 Primary Facility 2009-08-18 Drilling/Alteration No Violations Noted At time of inspection I met with Company Man Max Oliver of Chesapeake. Mr. Oliver informed me they were getting ready to perforate Clapper 2H and 4H wells. A small service rig was on site and set up over the hole. Mr. Oliver indicated they are planning to perforate approximately 6 sections on each well. Fracking is tentatively secheduled for Sept. 7th. Frac tanks were being staged on an upper field near the entrance to the property. An excavator was also on site filling in the reserve pit with soil from adjacent stockpile. Pit was being compacted with sheepsfoot roller, and soil was hauled with large dump truck. Pipe line workers were also installing pipe near the access road to the well pad.
1853171 Primary Facility 2010-01-04 Follow-up Inspection No Violations Noted During a previous DEP inspection completed on 12/11/09, a violation was cited for failure to properly install a well tag on the completed well. On January 4th 2010, the DEP received a letter and a picture from Chesapeake in response to the violation. The letter indicates that a well tag was installed on the well on 12/19/09, which was made evident in a photograph received along with the letter.
1968895 Primary Facility 2011-04-20 Routine/Complete Inspection No Violations Noted Well is online. Inspected cellar. no evidence of bubbling. Well is protected by chain-link fence. No activity on site. No violations observed.
2047583 Primary Facility 2012-03-05 Routine/Complete Inspection No Violations Noted
2047596 Primary Facility 2012-03-05 Administrative/File Review No Violations Noted Review weekly/post-storm inspections for 11/7 thru 12/26/2011.
2650826 Primary Facility 2017-10-23 Routine/Complete Inspection No Violations Noted
2711629 Primary Facility 2018-03-28 Routine/Complete Inspection No Violations Noted I performed a RTNC inspection of the Clapper well site on March 28. The site had a long access road with two active log piles along it. There was no impact from the log piles. The road was stable and solid. The pad surface was covered with #3 stone and stable. The wells were properly labeled. The cut and fill slopes were well vegetated and stable. The wells associated with this site are as follows:

115-20073 115-20108.

There were no erosional issues noted.

There were no violations.

For data sources see[8]

References