X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-063-37137"

m
 
(15 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
| Well ID: 063-37137
+
| Well ID: 37-063-37137
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.524561, -79.19808 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.524561, -79.198081 | width=100% | height=100% }}
 +
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 +
|-
 +
| County: [[Indiana_County,_Pennsylvania|Indiana]]
 
|-
 
|-
| County: [[Indiana County, Pennsylvania|Indiana]]
+
| Municipality: [[Center Township,_Indiana_County,_Pennsylvania|Center Township]]
 
|-
 
|-
| Municipality: [[Center Township, Indiana County, Pennsylvania|Center Township]]
+
| Operator Name: [[XTO ENERGY INC]]
 
|-
 
|-
| Operator Name: [[XTO ENERGY INC|XTO ENERGY INC]]
+
| Well Pad ID: [[148497]]
 
|-
 
|-
 
| Farm/Lease Name: HCPP A 8H
 
| Farm/Lease Name: HCPP A 8H
 
|-
 
|-
| First Permit Date: 2011-06-23
+
| License Status:  
 
|-
 
|-
| Last Permit Date: 2011-06-23
+
| Spud Date:  
 
|-
 
|-
| Spud Date: 2011-10-23
+
| Permit Date: 2011-06-23
 
|-
 
|-
| Unconventional: Yes
+
| Well Type: GAS
 
|-
 
|-
| Horizontal: Yes
+
| Unconventional Well: Y
 
|-
 
|-
| Producing: Yes
+
| Configuration: Horizontal Well
 
|-
 
|-
| Violations: None
+
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 40.524561
 
| Latitude: 40.524561
 
|-
 
|-
| Longitude: -79.19808
+
| Longitude: -79.198081
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2011-06-23
 +
| New Permit Application
 +
|-
 +
| 2011-10-23
 +
| Performed Spud Operation
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 2012-03-05
 +
| 2012-03-05
 +
| style="text-align: right;" | 8,040
 +
| style="text-align: right;" | 2,510,433
 +
| style="text-align: right;" |
 
|-
 
|-
 
|}
 
|}
__TOC__
+
==== Fluid Composition Data ====
== Well Inspection Data ==
+
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="20"| 1
 +
| rowspan="3"| Friction Reducer - MC MX-14-5
 +
| rowspan="3"| Multi-Chem Group
 +
| rowspan="3"| Friction Reducer
 +
|
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| Other -(non hazardous)
 +
|
 +
| style="text-align: right;" | 70.00
 +
| style="text-align: right;" | 0.03
 +
| style="text-align: right;" |
 +
|-
 +
| Distillates, petroleum, hydrotreated light
 +
| 64742-47-8
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.01
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="4"| Biocide - MC 8520
 +
| rowspan="4"| Multi-Chem Group
 +
| rowspan="4"| Biocide
 +
| 3,4,4-Trimethyloxazolidine
 +
| 75673-43-7
 +
| style="text-align: right;" | 4.50
 +
| style="text-align: right;" | 0.00062000
 +
| style="text-align: right;" |
 +
|-
 +
|
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| 4,4-Dimethyloxazolidine
 +
| 51200-87-4
 +
| style="text-align: right;" | 95.00
 +
| style="text-align: right;" | 0.01
 +
| style="text-align: right;" |
 +
|-
 +
| 2-Amino-2-methylpropan-1-ol
 +
| 124-68-5
 +
| style="text-align: right;" | 0.50
 +
| style="text-align: right;" | 0.00007000
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="3"| Acid - 7.5 HCl Acid
 +
| rowspan="3"| PPG Industries
 +
| rowspan="3"| Acid
 +
|
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| Hydrochloric acid
 +
| 7647-01-0
 +
| style="text-align: right;" | 7.50
 +
| style="text-align: right;" | 0.03
 +
| style="text-align: right;" |
 +
|-
 +
| Other -(non hazardous)
 +
|
 +
| style="text-align: right;" | 92.50
 +
| style="text-align: right;" | 0.40
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Water
 +
| rowspan="1"|
 +
| rowspan="1"|
 +
| Water
 +
| 7732-18-5
 +
| style="text-align: right;" | 100.00
 +
| style="text-align: right;" | 86.77
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="3"| Biocide - MC 8650
 +
| rowspan="3"| Multi-Chem Group
 +
| rowspan="3"| Biocide
 +
| Other -(non hazardous)
 +
|
 +
| style="text-align: right;" | 40.00
 +
| style="text-align: right;" | 0.00243000
 +
| style="text-align: right;" |
 +
|-
 +
|
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| Glutaraldehyde
 +
| 111-30-8
 +
| style="text-align: right;" | 60.00
 +
| style="text-align: right;" | 0.00365000
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="3"| Acid Corrosion Inhibitor - EcoAcid CI
 +
| rowspan="3"| Geosafe Chemicals
 +
| rowspan="3"| Corrosion Inhibitor
 +
|
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| Diethylene glycol monobutyl ether
 +
| 112-34-5
 +
| style="text-align: right;" | 50.00
 +
| style="text-align: right;" | 0.00017000
 +
| style="text-align: right;" |
 +
|-
 +
| Other -(non hazardous)
 +
|
 +
| style="text-align: right;" | 50.00
 +
| style="text-align: right;" | 0.00017000
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| Scale Inhibitor - MC-MX-588-2
 +
| rowspan="2"| Multi-Chem Group
 +
| rowspan="2"| Scale Inhibitor
 +
| Other -(non hazardous)
 +
|
 +
| style="text-align: right;" | 100.00
 +
| style="text-align: right;" | 0.01
 +
| style="text-align: right;" |
 +
|-
 +
|
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Sand
 +
| rowspan="1"|
 +
| rowspan="1"| Proppant
 +
| Quartz
 +
| 14808-60-7
 +
| style="text-align: right;" | 100.00
 +
| style="text-align: right;" | 12.69
 +
| style="text-align: right;" |
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =FracFocus Fracking Chemicals Database
 +
| date = 2019-04-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-06-19 }}</ref>
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2011
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 486,791.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 182,417.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 139,426.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 103,706.00
 +
| style="text-align: right;" | 330
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2017
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 87,323.00
 +
| style="text-align: right;" | 341
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 104,285.45
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 114,126.25
 +
| style="text-align: right;" | 352
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
| 2011
 +
| [[XTO ENERGY INC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 322.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0254185
 +
|-
 +
| 2013
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 2,070.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0254185
 +
|-
 +
| 2013
 +
| [[XTO ENERGY INC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 183.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2013
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 895.00 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0254185
 +
|-
 +
| 2013
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 85.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23759
 +
|-
 +
| 2013
 +
| [[XTO ENERGY INC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 2,218.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0254185
 +
|-
 +
| 2013
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 895.00 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0254185
 +
|-
 +
| 2013
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,736.00 Bbl
 +
| RESIDUAL WASTE TRANSFER FACILITY
 +
| 101674
 +
|-
 +
| 2014
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,672.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NW009
 +
|-
 +
| 2014
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 407.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 +
|-
 +
| 2015
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 201.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 +
|-
 +
| 2015
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,969.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NW009
 +
|-
 +
| 2016
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 983.69 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NW009
 +
|-
 +
| 2016
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 705.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 +
|-
 +
| 2017
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 124.09 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2017
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 117.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
|  34-133-24189
 +
|-
 +
| 2017
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,024.01 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 +
|-
 +
| 2018
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,421.90 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 +
|-
 +
| 2018
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 98.14 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-24096
 +
|-
 +
| 2018
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 38.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
|  34-133-24189
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 186.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-24096
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 412.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
|  34-133-24189
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 134.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 745.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 156.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-21076
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 
| 1995773
 
| 1995773
 +
| Primary Facility
 
| 2011-08-10
 
| 2011-08-10
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 2005240
 
| 2005240
 +
| Primary Facility
 
| 2011-09-20
 
| 2011-09-20
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| ID PRESENT. SURFACE SET, NOT YET COMPLETED. NO ACCELERATES ES NOTED. NO VIOLATIONS NOTED. ACCOMPANIED BY OGI RICK HOOVER
 
| ID PRESENT. SURFACE SET, NOT YET COMPLETED. NO ACCELERATES ES NOTED. NO VIOLATIONS NOTED. ACCOMPANIED BY OGI RICK HOOVER
|
 
|-
 
 
|-
 
|-
 
| 2005601
 
| 2005601
 +
| Primary Facility
 
| 2011-09-20
 
| 2011-09-20
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
|
 
|-
 
 
|-
 
|-
 
| 2011033
 
| 2011033
 +
| Primary Facility
 
| 2011-10-12
 
| 2011-10-12
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 2015121
 
| 2015121
 +
| Primary Facility
 
| 2011-10-28
 
| 2011-10-28
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 2015141
 
| 2015141
 +
| Primary Facility
 
| 2011-10-25
 
| 2011-10-25
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 2016282
 
| 2016282
 +
| Primary Facility
 
| 2011-11-02
 
| 2011-11-02
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, Site ID sign, ESCGP-1, ES Plan, and PPC plan present, but recommend operator replace all and place in ziploc bag(or another waterproof measures)  as documents located onsite are wet.  Access road and pad adequately rocked. Secondary containment located on pad beneath rig. UDI 61 Rig currently drilling 8H.  No pits onsite, tanks utilized for drilling operations. Closed loop system being utilized, operator plans to remove all wastes (including cuttings) from site and transport to approved facility. Wood chips are being mixed with cuttings prior to final disposal.  No IW or accelerated ES issues noted onsite.  Bmp's installed and functioning properly. Operator should continue to monitor and maintain all BMPS until final restoration achieved. Company man  informed department that area behind well pad is not related to drilling activities, but rather HCPP.
 
| At the time of inspection, Site ID sign, ESCGP-1, ES Plan, and PPC plan present, but recommend operator replace all and place in ziploc bag(or another waterproof measures)  as documents located onsite are wet.  Access road and pad adequately rocked. Secondary containment located on pad beneath rig. UDI 61 Rig currently drilling 8H.  No pits onsite, tanks utilized for drilling operations. Closed loop system being utilized, operator plans to remove all wastes (including cuttings) from site and transport to approved facility. Wood chips are being mixed with cuttings prior to final disposal.  No IW or accelerated ES issues noted onsite.  Bmp's installed and functioning properly. Operator should continue to monitor and maintain all BMPS until final restoration achieved. Company man  informed department that area behind well pad is not related to drilling activities, but rather HCPP.
|
 
|-
 
 
|-
 
|-
 
| 2016916
 
| 2016916
 +
| Primary Facility
 
| 2011-11-03
 
| 2011-11-03
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 2020685
 
| 2020685
 +
| Primary Facility
 
| 2011-11-16
 
| 2011-11-16
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
|
 
|-
 
 
|-
 
|-
 
| 2040023
 
| 2040023
 +
| Primary Facility
 
| 2012-01-30
 
| 2012-01-30
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| Inspection result of notification from Stephen Smith of Xto at 930 of possible ES concerns with hillside stability along power plant road.  
+
| Inspection result of notification from Stephen Smith of Xto at 930 of possible ES concerns with hillside stability along power plant road.
 
 
During inspection well drilled, rig off site. Sign ES plan, Escp-1 and PPC plan onsite.
 
 
 
Three tanks onsite surrounded by temporary containment. Pad lined with temp containment, actively being disposed of.  Production equipment actively being installed. The fill slope at the northern end of pad along power plant road appears to be sliding.
 
 
 
At the time of this inspection it does not appear that erosion has occurred outside LOD. Operator  has contacted engineer and preliminary plans  are to either install rock gabions and/or additional bmp's in order to aid in stabilization of slope. Vegetative matting previously installed also appears to have slid with material along fill slope. Road side ditches and culverts are going to be protected by bmp's in order to prevent a possible pollution event.
 
 
 
|
 
|-
 
 
|-
 
|-
 
| 2041947
 
| 2041947
 +
| Primary Facility
 
| 2012-02-02
 
| 2012-02-02
 +
| Follow-up Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Follow up Inspection result of notification from Stephen Smith of XTO ON 1/30/12 (and inspection) of possible ES concerns with slope stability along power plant road. Field meeting conducted to review written response addressing the slope instability with myself, WQS Marc Maestra, Rick Palmer,  and XTO reps Stephen Smith, Dan Rice, as well as XTO's engineer During this meeting department noted that slope has moved slightly from 1/30/12 inspection. Although it appears that fill material is sliding down northern slope of pad near power plant RD, there again does not  appear to be evidence of accelerated erosion and/or sedimentation issues outside of LOD at this time. Location of hillside failure is located near well heads and there is some distance (exacts not avaliable. ~100ft +) btw production equipment and location. Therefore, at this time XTO nor department feel that production equipment will be impacted by the slide and/or remediation efforts. A minor modification to ESCGP-1 shall be submitted to SWRO XTO agreeded to notifiy us at start of work
 
| Follow up Inspection result of notification from Stephen Smith of XTO ON 1/30/12 (and inspection) of possible ES concerns with slope stability along power plant road. Field meeting conducted to review written response addressing the slope instability with myself, WQS Marc Maestra, Rick Palmer,  and XTO reps Stephen Smith, Dan Rice, as well as XTO's engineer During this meeting department noted that slope has moved slightly from 1/30/12 inspection. Although it appears that fill material is sliding down northern slope of pad near power plant RD, there again does not  appear to be evidence of accelerated erosion and/or sedimentation issues outside of LOD at this time. Location of hillside failure is located near well heads and there is some distance (exacts not avaliable. ~100ft +) btw production equipment and location. Therefore, at this time XTO nor department feel that production equipment will be impacted by the slide and/or remediation efforts. A minor modification to ESCGP-1 shall be submitted to SWRO XTO agreeded to notifiy us at start of work
|
 
|-
 
 
|-
 
|-
 
| 2045595
 
| 2045595
 +
| Primary Facility
 
| 2012-02-23
 
| 2012-02-23
 +
| Follow-up Inspection
 
| No Violations Noted
 
| No Violations Noted
| Follow up Inspection to examine remediation measures ongoing to address pad slope failure at multi well pad.  
+
| Follow up Inspection to examine remediation measures ongoing to address pad slope failure at multi well pad.
 
 
During this inspection construction crews actively addressing slope failure.
 
(1) Two sections of large compost sox, culvert pipe and rock outlet
 
(2) Slope was being cut back to reduce grade
 
(3) a rock wall being placed at toe of slope to prevent further slide. Construction crews onsite were planning to have slope regraded by end of today.
 
 
 
Department will follow up early next week to examine completion of restoration/stabilization activities
 
 
 
|
 
|-
 
 
|-
 
|-
 
| 2045806
 
| 2045806
 +
| Primary Facility
 
| 2012-02-27
 
| 2012-02-27
 +
| Follow-up Inspection
 
| No Violations Noted
 
| No Violations Noted
| ollow up Inspection to examine remediation measures ongoing to address pad slope failure at multi well pad. At the time of today’s inspection, it appears  operator has completed earth disturbance work related to the remediation of slope failure. The slope appears to have been re-grade and tapered to a 2:1 and 3:1 slope. In addition to a rocked lined ditch, swale, diversion pipe, and compos sox; operator installed erosion control mats over slope. Operator plans to seed/mulch areas this week. According to XTO rep Stephen Smith, the construction sequence outlined on January 30, 2012 was followed, except for the installation of a gabion wall.  AT this time the operator feels that a gabion wall is not necessary, but operator will continue to closely monitoring  the area and if any additional movement is noted a gabion wall will be  installed. During inspection, no accelerated ES issues were noted on pad or access road. Department will conduct a follow up inspection to ensure slope failure has been successfully controlled/corrected.  
+
| ollow up Inspection to examine remediation measures ongoing to address pad slope failure at multi well pad. At the time of today’s inspection, it appears  operator has completed earth disturbance work related to the remediation of slope failure. The slope appears to have been re-grade and tapered to a 2:1 and 3:1 slope. In addition to a rocked lined ditch, swale, diversion pipe, and compos sox; operator installed erosion control mats over slope. Operator plans to seed/mulch areas this week. According to XTO rep Stephen Smith, the construction sequence outlined on January 30, 2012 was followed, except for the installation of a gabion wall.  AT this time the operator feels that a gabion wall is not necessary, but operator will continue to closely monitoring  the area and if any additional movement is noted a gabion wall will be  installed. During inspection, no accelerated ES issues were noted on pad or access road. Department will conduct a follow up inspection to ensure slope failure has been successfully controlled/corrected.
 
 
|
 
|-
 
 
|-
 
|-
 
| 2046708
 
| 2046708
 +
| Primary Facility
 
| 2012-02-27
 
| 2012-02-27
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 2059518
 
| 2059518
 +
| Primary Facility
 
| 2012-04-10
 
| 2012-04-10
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
|
 
|-
 
 
|-
 
|-
 
| 2061701
 
| 2061701
 +
| Primary Facility
 
| 2012-04-16
 
| 2012-04-16
 +
| Incident- Response to Accident or Event
 
| In Compliance with Policy
 
| In Compliance with Policy
 
| Administrative Inspection- Result of report of incident/release at homer city power plant unit A location on 4/8/12 (see attached). Based on operator respsone it appears that spill was properly handled accoridng to existing policy. Department reccomends that operator conitnue to closely mointor and maintain all bmp's and containment areas to ensure adequate preventative measures are maintained.  A follow up site inspection will be conducted to ensure that distrubed areas are properly restored.
 
| Administrative Inspection- Result of report of incident/release at homer city power plant unit A location on 4/8/12 (see attached). Based on operator respsone it appears that spill was properly handled accoridng to existing policy. Department reccomends that operator conitnue to closely mointor and maintain all bmp's and containment areas to ensure adequate preventative measures are maintained.  A follow up site inspection will be conducted to ensure that distrubed areas are properly restored.
|
 
|-
 
 
|-
 
|-
 
| 2088619
 
| 2088619
 +
| Primary Facility
 
| 2012-08-01
 
| 2012-08-01
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Routine inspection. At the time of this inspection, multi-well pad site ID signs, ES plan, and ESCGP-1 present. Department unable to locate drililng permits.
 
| Routine inspection. At the time of this inspection, multi-well pad site ID signs, ES plan, and ESCGP-1 present. Department unable to locate drililng permits.
Well (8H) drilled and equipped for prodcution, no activity onsite during inspection.  TD 11/26/11.
 
Access road stable. Pad adequately rocked an maintained.
 
No accelerated erosion or sedimeantion issues noted.
 
Previously repaired slope failure has been permaently stabilized and revegetatived--compost sock(s) installed down gradient in order to perevent a possible pollution event if slide would reoccur- no ES concerns exist at time of this inspection.
 
Site has been temporarily stabilized, operator has intention of drilling several more wells on property, to date permits have been obtained for 7H and 9H.
 
Four MEI boxes located onsite, along with two roll off boxes.  All appear sound.
 
Four brine tanks and prodcuiton equipment located onsite within lined metal containment.
 
No IW leaks or discharges noted.
 
 
|
 
|-
 
 
|-
 
|-
 
| 2109574
 
| 2109574
 +
| Primary Facility
 
| 2012-10-16
 
| 2012-10-16
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| At the time of this inspection, multi-well pad site ID signs, ES plan, and ESCGP-1 present.  
+
| At the time of this inspection, multi-well pad site ID signs, ES plan, and ESCGP-1 present.
Well (8H) drilled and equipped for prodcution, no activity onsite during inspection.  TD 11/26/11.
 
Access road stable. Pad adequately rocked an maintained.
 
No accelerated erosion or sedimeantion issues noted.
 
Previously repaired slope failure has been permaently stabilized and revegetatived--compost sock(s) installed down gradient in order to perevent a possible pollution event if slide would reoccur- no ES concerns exist at time of this inspection. Temporary soil piles secured with vegetative matting, although recommend operator maintain as some sections of matting have become lose.
 
Site has been temporarily stabilized, operator has intention of drilling several more wells on property, to date permits have been obtained for 7H and 9H; therefore site has not yet been restored to PCSM plan.
 
Four brine tanks and prodcuiton equipment located onsite within lined metal containment.
 
No IW leaks or discharges noted.
 
 
 
|
 
|-
 
 
|-
 
|-
 
| 2136126
 
| 2136126
 +
| Primary Facility
 
| 2013-01-31
 
| 2013-01-31
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| Routine inspection. At the time of this inspection, multi-well pad site ID signs, ES plan, and ESCGP-1 present.  
+
| Routine inspection. At the time of this inspection, multi-well pad site ID signs, ES plan, and ESCGP-1 present.
Well (8H) drilled and equipped for production, no activity onsite during inspection.  TD 11/26/11.
 
 
 
Access road stable. Pad adequately rocked an maintained. No accelerated erosion or sedimentation issues noted. Former area of slope failure has been adquately restored with successsful vegetative growth. Observed that operator still has flowback line in place under HCPP roadway. Site has been temporarily stabilized, operator has intention of drilling several more wells on property, to date valid permits exists for 7H and 9H but drilling has not yet commenced; therefore, site has not yet been restored to PCSM plan.
 
Four brine tanks and production equipment located onsite within lined metal containment.
 
No IW leaks or discharges noted.
 
 
 
|
 
 
|-
 
|-
|}
+
| 2183585
== Production Data ==
+
| Primary Facility
{| class="wikitable sortable" width="95%"
+
| 2013-06-13
!scope="col" | PERIOD
+
| Administrative/File Review
!scope="col" | GAS QUANTITY
+
| In Compliance with Policy
!scope="col" | GAS PRODUCTION DAYS
+
| On-site meeting with XTO rep Dan Rice regarding site restoration. Mr. Rice requested meeting to discuss stabilization and express concerns pertaining to side slope on left side of pad when standing at pad entrance.
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
| 2012-2
+
| 2247639
| style="text-align:right;" | 0.0
+
| Primary Facility
| style="text-align:right;" | 0.0
+
| 2014-02-19
| style="text-align:right;" | 0.0
+
| Routine/Partial Inspection
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| Site ID sign present, in compliance with Act 9 standards. ERP on-site. Permit numbers posted. Department recommends Operator remove posted permit numbers for any permits which are no longer valid.
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2489598
 +
| Primary Facility
 +
| 2016-05-25
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| Multi-well pad. At the time of this inspection, well 8H drilled and appears equipped for production. According to records, drilling occurred 8/07/2011-11/26/2011. Well tag present, legible.
 +
Wells 2H, 3H, 4H drilled and appear equipped for production. Fence located around wells.
 +
Four on-site brine tanks appear sound, located within a lined, metal secondary containment unit. 
 +
Access road stabilized.
 +
Site ID sign present, in compliance with Act 9 standards. ERP on-site.
 +
Inspection conducted with WQS Cindy Witham.
 
|-
 
|-
| 2012-1
+
| 2502627
| style="text-align:right;" | 0.0
+
| Primary Facility
| style="text-align:right;" | 0.0
+
| 2016-07-18
| style="text-align:right;" | 0.0
+
| Routine/Complete Inspection
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| Multi-well Marcellus site. Well appears equipped for production.  
| style="text-align:right;" | 0.0
+
At time of inspection site ID sign, well permit, E&S plan, ESCGP, and PPC plan all on site. No E&S issues observed on access road. No E&S issues observed on site. Well tag present, legible and affixed in a permanent manner. Brine tank located in secondary containment appears structurally sound.
 
|-
 
|-
 +
| 2519644
 +
| Primary Facility
 +
| 2016-09-13
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Multi-well Marcellus site.
 +
At time of inspection Site ID sign, PPC plan, E&S plan, Well permit, and ESCGP on site.
 +
No E&S issues observed on access road. Well pad rocked, no E&S issues observed.
 +
It appears well is equipped for production. Well head surrounded by fence. Well tag present and legible.
 +
Brine tank located in secondary containment appears structurally sound.
 +
The NOT for the ESCGP-1 associated with this well site (ESX09-063-0005) has been approved at the time of this inspection.
 
|-
 
|-
| 2011-2
+
| 2654777
| style="text-align:right;" | 0.0
+
| Primary Facility
| style="text-align:right;" | 0.0
+
| 2017-10-26
| style="text-align:right;" | 0.0
+
| Routine/Complete Inspection
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| Well appears equipped for production.  
| style="text-align:right;" | 0.0
+
Well head surrounded by security fence.
 +
The NOT for this site was terminated on 9-13-16.
 
|-
 
|-
 +
| 2668716
 +
| Primary Facility
 +
| 2017-12-08
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
|
 
|-
 
|-
| 2011-1
+
| 2761112
| style="text-align:right;" | 0.0
+
| Primary Facility
| style="text-align:right;" | 0.0
+
| 2018-08-07
| style="text-align:right;" | 0.0
+
| Routine/Complete Inspection
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| Well appears equipped for production. Well head surrounded by security fence and cement barriers. Four brine tanks located on site.
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 
|}
 
|}
== Waste Data ==
+
<!--==== Violations Commited ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Inspection ID
!scope="col" | TYPE
+
!scope="col" | Violation ID
!scope="col" | QUANTITY
+
!scope="col" | Violation Date
!scope="col" | UNITS
+
!scope="col" | Date Resolved
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Violation Code
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Violation Type
!scope="col" | WASTE FACILITY NAME
+
!scope="col" | Violation Comments
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2011-2
+
|}-->
| FRACING FLUID WASTE
+
<!--==== Penalties Applied ====
| style="text-align:right;" | 322.0
+
{| class="wikitable sortable" width="95%"
| Bbl
+
!scope="col" | Violation ID
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
!scope="col" | Penalty ID
| PA0254185
+
!scope="col" | Penalty Code
| RESERVED ENVIRONMENTAL SERVICES
+
!scope="col" | Penalty Status
| MOUNT PLEASANT
+
!scope="col" | Penalty Date
| PA
+
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 
|-
 
|-
|}
+
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
==References==
 +
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]
 +
[[Category:FracFocus]]

Latest revision as of 06:26, 16 May 2020

Well Details

Well ID: 37-063-37137
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: Center Township
Operator Name: XTO ENERGY INC
Well Pad ID: 148497
Farm/Lease Name: HCPP A 8H
License Status:
Spud Date:
Permit Date: 2011-06-23
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.524561
Longitude: -79.198081

For data sources see[1][2][3]

Well History

Date Event
2011-06-23 New Permit Application
2011-10-23 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-03-05 2012-03-05 8,040 2,510,433

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Friction Reducer - MC MX-14-5 Multi-Chem Group Friction Reducer
Other -(non hazardous) 70.00 0.03
Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.01
Biocide - MC 8520 Multi-Chem Group Biocide 3,4,4-Trimethyloxazolidine 75673-43-7 4.50 0.00062000
4,4-Dimethyloxazolidine 51200-87-4 95.00 0.01
2-Amino-2-methylpropan-1-ol 124-68-5 0.50 0.00007000
Acid - 7.5 HCl Acid PPG Industries Acid
Hydrochloric acid 7647-01-0 7.50 0.03
Other -(non hazardous) 92.50 0.40
Water Water 7732-18-5 100.00 86.77
Biocide - MC 8650 Multi-Chem Group Biocide Other -(non hazardous) 40.00 0.00243000
Glutaraldehyde 111-30-8 60.00 0.00365000
Acid Corrosion Inhibitor - EcoAcid CI Geosafe Chemicals Corrosion Inhibitor
Diethylene glycol monobutyl ether 112-34-5 50.00 0.00017000
Other -(non hazardous) 50.00 0.00017000
Scale Inhibitor - MC-MX-588-2 Multi-Chem Group Scale Inhibitor Other -(non hazardous) 100.00 0.01
Sand Proppant Quartz 14808-60-7 100.00 12.69

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2012 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2013 XTO ENERGY INC 486,791.00 365 0.00 0 0.00 0
2014 XTO ENERGY INC 182,417.00 365 0.00 0 0.00 0
2015 XTO ENERGY INC 139,426.00 365 0.00 0 0.00 0
2016 XTO ENERGY INC 103,706.00 330 0.00 0 0.00 0
2017 XTO ENERGY INC 87,323.00 341 0.00 0 0.00 0
2018 XTO ENERGY INC 104,285.45 365 0.00 0 0.00 0
2019 XTO ENERGY INC 114,126.25 352 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 XTO ENERGY INC Fracing Fluid Waste 322.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 XTO ENERGY INC Produced Fluid 2,070.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 XTO ENERGY INC Fracing Fluid Waste 183.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 XTO ENERGY INC Produced Fluid 895.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2013 XTO ENERGY INC Produced Fluid 85.00 Bbl INJECTION DISPOSAL WELL 34-155-23759
2013 XTO ENERGY INC Fracing Fluid Waste 2,218.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 XTO ENERGY INC Produced Fluid 895.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2013 XTO ENERGY INC Produced Fluid 1,736.00 Bbl RESIDUAL WASTE TRANSFER FACILITY 101674
2014 XTO ENERGY INC Produced Fluid 1,672.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Produced Fluid 407.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 201.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 1,969.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 983.69 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 705.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 124.09 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 XTO ENERGY INC Produced Fluid 117.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 1,024.01 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 1,421.90 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 98.14 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018 XTO ENERGY INC Produced Fluid 38.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 186.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 412.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 134.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 XTO ENERGY INC Produced Fluid 745.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 156.00 Bbl INJECTION DISPOSAL WELL 34-133-21076

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1995773 Primary Facility 2011-08-10 Drilling/Alteration No Violations Noted
2005240 Primary Facility 2011-09-20 Routine/Complete Inspection No Violations Noted ID PRESENT. SURFACE SET, NOT YET COMPLETED. NO ACCELERATES ES NOTED. NO VIOLATIONS NOTED. ACCOMPANIED BY OGI RICK HOOVER
2005601 Primary Facility 2011-09-20 Drilling/Alteration No Violations Noted
2011033 Primary Facility 2011-10-12 Drilling/Alteration No Violations Noted
2015121 Primary Facility 2011-10-28 Drilling/Alteration No Violations Noted
2015141 Primary Facility 2011-10-25 Drilling/Alteration No Violations Noted
2016282 Primary Facility 2011-11-02 Routine/Complete Inspection No Violations Noted At the time of inspection, Site ID sign, ESCGP-1, ES Plan, and PPC plan present, but recommend operator replace all and place in ziploc bag(or another waterproof measures) as documents located onsite are wet. Access road and pad adequately rocked. Secondary containment located on pad beneath rig. UDI 61 Rig currently drilling 8H. No pits onsite, tanks utilized for drilling operations. Closed loop system being utilized, operator plans to remove all wastes (including cuttings) from site and transport to approved facility. Wood chips are being mixed with cuttings prior to final disposal. No IW or accelerated ES issues noted onsite. Bmp's installed and functioning properly. Operator should continue to monitor and maintain all BMPS until final restoration achieved. Company man informed department that area behind well pad is not related to drilling activities, but rather HCPP.
2016916 Primary Facility 2011-11-03 Drilling/Alteration No Violations Noted
2020685 Primary Facility 2011-11-16 Drilling/Alteration No Violations Noted
2040023 Primary Facility 2012-01-30 Routine/Complete Inspection No Violations Noted Inspection result of notification from Stephen Smith of Xto at 930 of possible ES concerns with hillside stability along power plant road.
2041947 Primary Facility 2012-02-02 Follow-up Inspection No Violations Noted Follow up Inspection result of notification from Stephen Smith of XTO ON 1/30/12 (and inspection) of possible ES concerns with slope stability along power plant road. Field meeting conducted to review written response addressing the slope instability with myself, WQS Marc Maestra, Rick Palmer, and XTO reps Stephen Smith, Dan Rice, as well as XTO's engineer During this meeting department noted that slope has moved slightly from 1/30/12 inspection. Although it appears that fill material is sliding down northern slope of pad near power plant RD, there again does not appear to be evidence of accelerated erosion and/or sedimentation issues outside of LOD at this time. Location of hillside failure is located near well heads and there is some distance (exacts not avaliable. ~100ft +) btw production equipment and location. Therefore, at this time XTO nor department feel that production equipment will be impacted by the slide and/or remediation efforts. A minor modification to ESCGP-1 shall be submitted to SWRO XTO agreeded to notifiy us at start of work
2045595 Primary Facility 2012-02-23 Follow-up Inspection No Violations Noted Follow up Inspection to examine remediation measures ongoing to address pad slope failure at multi well pad.
2045806 Primary Facility 2012-02-27 Follow-up Inspection No Violations Noted ollow up Inspection to examine remediation measures ongoing to address pad slope failure at multi well pad. At the time of today’s inspection, it appears operator has completed earth disturbance work related to the remediation of slope failure. The slope appears to have been re-grade and tapered to a 2:1 and 3:1 slope. In addition to a rocked lined ditch, swale, diversion pipe, and compos sox; operator installed erosion control mats over slope. Operator plans to seed/mulch areas this week. According to XTO rep Stephen Smith, the construction sequence outlined on January 30, 2012 was followed, except for the installation of a gabion wall. AT this time the operator feels that a gabion wall is not necessary, but operator will continue to closely monitoring the area and if any additional movement is noted a gabion wall will be installed. During inspection, no accelerated ES issues were noted on pad or access road. Department will conduct a follow up inspection to ensure slope failure has been successfully controlled/corrected.
2046708 Primary Facility 2012-02-27 Drilling/Alteration No Violations Noted
2059518 Primary Facility 2012-04-10 Drilling/Alteration No Violations Noted
2061701 Primary Facility 2012-04-16 Incident- Response to Accident or Event In Compliance with Policy Administrative Inspection- Result of report of incident/release at homer city power plant unit A location on 4/8/12 (see attached). Based on operator respsone it appears that spill was properly handled accoridng to existing policy. Department reccomends that operator conitnue to closely mointor and maintain all bmp's and containment areas to ensure adequate preventative measures are maintained. A follow up site inspection will be conducted to ensure that distrubed areas are properly restored.
2088619 Primary Facility 2012-08-01 Routine/Complete Inspection No Violations Noted Routine inspection. At the time of this inspection, multi-well pad site ID signs, ES plan, and ESCGP-1 present. Department unable to locate drililng permits.
2109574 Primary Facility 2012-10-16 Routine/Complete Inspection No Violations Noted At the time of this inspection, multi-well pad site ID signs, ES plan, and ESCGP-1 present.
2136126 Primary Facility 2013-01-31 Routine/Complete Inspection No Violations Noted Routine inspection. At the time of this inspection, multi-well pad site ID signs, ES plan, and ESCGP-1 present.
2183585 Primary Facility 2013-06-13 Administrative/File Review In Compliance with Policy On-site meeting with XTO rep Dan Rice regarding site restoration. Mr. Rice requested meeting to discuss stabilization and express concerns pertaining to side slope on left side of pad when standing at pad entrance.
2247639 Primary Facility 2014-02-19 Routine/Partial Inspection No Violations Noted Site ID sign present, in compliance with Act 9 standards. ERP on-site. Permit numbers posted. Department recommends Operator remove posted permit numbers for any permits which are no longer valid.
2489598 Primary Facility 2016-05-25 Routine/Partial Inspection No Violations Noted Multi-well pad. At the time of this inspection, well 8H drilled and appears equipped for production. According to records, drilling occurred 8/07/2011-11/26/2011. Well tag present, legible.

Wells 2H, 3H, 4H drilled and appear equipped for production. Fence located around wells. Four on-site brine tanks appear sound, located within a lined, metal secondary containment unit. Access road stabilized. Site ID sign present, in compliance with Act 9 standards. ERP on-site. Inspection conducted with WQS Cindy Witham.

2502627 Primary Facility 2016-07-18 Routine/Complete Inspection No Violations Noted Multi-well Marcellus site. Well appears equipped for production.

At time of inspection site ID sign, well permit, E&S plan, ESCGP, and PPC plan all on site. No E&S issues observed on access road. No E&S issues observed on site. Well tag present, legible and affixed in a permanent manner. Brine tank located in secondary containment appears structurally sound.

2519644 Primary Facility 2016-09-13 Routine/Complete Inspection No Violations Noted Multi-well Marcellus site.

At time of inspection Site ID sign, PPC plan, E&S plan, Well permit, and ESCGP on site. No E&S issues observed on access road. Well pad rocked, no E&S issues observed. It appears well is equipped for production. Well head surrounded by fence. Well tag present and legible. Brine tank located in secondary containment appears structurally sound. The NOT for the ESCGP-1 associated with this well site (ESX09-063-0005) has been approved at the time of this inspection.

2654777 Primary Facility 2017-10-26 Routine/Complete Inspection No Violations Noted Well appears equipped for production.

Well head surrounded by security fence. The NOT for this site was terminated on 9-13-16.

2668716 Primary Facility 2017-12-08 Routine/Complete Inspection No Violations Noted
2761112 Primary Facility 2018-08-07 Routine/Complete Inspection No Violations Noted Well appears equipped for production. Well head surrounded by security fence and cement barriers. Four brine tanks located on site.

For data sources see[8]

References