X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-28805"

(Created page with "== Well Details == {{129-28805-Details}} __TOC__ == Well Inspection Data == {{129-28805-inspection}} == Production Data == {{129-28805-production}} == Waste Data == {{129-2880...")
 
m
 
(18 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{{129-28805-Details}}
+
{| class="wikitable welldetails" width="95%"
__TOC__
+
| Well ID: 37-129-28805
== Well Inspection Data ==
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.213181, -79.706461 | width=100% | height=100% }}
{{129-28805-inspection}}
+
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 +
|-
 +
| County: [[Westmoreland_County,_Pennsylvania|Westmoreland]]
 +
|-
 +
| Municipality: [[South Huntingdon Township,_Westmoreland_County,_Pennsylvania|South Huntingdon Township]]
 +
|-
 +
| Operator Name: [[CHEVRON APPALACHIA LLC]]
 +
|-
 +
| Well Pad ID: [[149234]]
 +
|-
 +
| Farm/Lease Name: SABATINE-SMOUSE UNIT 2H
 +
|-
 +
| License Status:
 +
|-
 +
| Spud Date:
 +
|-
 +
| Permit Date: 2012-12-07
 +
|-
 +
| Well Type: GAS
 +
|-
 +
| Unconventional Well: Y
 +
|-
 +
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: No
 +
|-
 +
| Latitude: 40.213181
 +
|-
 +
| Longitude: -79.706461
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2012-12-07
 +
| New Permit Application
 +
|-
 +
| 2013-01-24
 +
| Performed Spud Operation
 +
|-
 +
| 2013-07-24
 +
| Drilling Completion
 +
|-
 +
| 2013-10-17
 +
| Perforation
 +
|-
 +
| 2016-03-30
 +
| DEVIATED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 2013-10-17
 +
| 2013-10-22
 +
| style="text-align: right;" | 7,781
 +
| style="text-align: right;" | 4,239,750
 +
| style="text-align: right;" |
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="11"| 1
 +
| rowspan="1"| CMHPG
 +
| rowspan="1"| Ashland
 +
| rowspan="1"| Water Viscosifier
 +
| Carboxymethyl Hydroxporoyl Guar Blend
 +
| 68130-15-4
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.00002859
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| 15% Hcl Acid
 +
| rowspan="1"| Reagent/PPG
 +
| rowspan="1"| Used to open perfs
 +
| Hydrochloric Acid
 +
| 7647-01-0
 +
| style="text-align: right;" | 15
 +
| style="text-align: right;" | 0.00087634
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Iron Control A
 +
| rowspan="1"| Nalco
 +
| rowspan="1"| Iron Control
 +
| Ethylene Glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00007157
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| GBL
 +
| rowspan="1"| Clearwater
 +
| rowspan="1"| Gel Breaker
 +
| Ethylene Glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 60
 +
| style="text-align: right;" | 0.00000044
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Scale Inhibitor A
 +
| rowspan="1"| Nalco
 +
| rowspan="1"| Scale Inhibitor
 +
| Ethylene Glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00007578
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Unislik ST 50
 +
| rowspan="1"| CESI
 +
| rowspan="1"| Friction Reducer
 +
| Hydrotreated Light Distillite
 +
| 64742-47-8
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00036335
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Proppant
 +
| rowspan="1"| US Sand Co
 +
| rowspan="1"| Proppant
 +
| Crystalline Silica
 +
| 14808-60-7
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 8.89
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="3"| EC 6116a
 +
| rowspan="3"| Nalco
 +
| rowspan="3"| Biocide
 +
| Polyethylene Glycol
 +
| 25322-68-3
 +
| style="text-align: right;" | 60
 +
| style="text-align: right;" | 0.00015369
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1, 1-Dibromo-3-nitrilopropionamide
 +
| 10222-01-2
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00007684
 +
| style="text-align: right;" | 0
 +
|-
 +
| Dibromoacetonitrile
 +
| 3252-43-5
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.00001281
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Clean Volume
 +
| rowspan="1"| Chevron Applachia, LLC
 +
| rowspan="1"| Carrier/Base Fluid
 +
| H20
 +
| 7732-18-5
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 91.09
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =FracFocus Fracking Chemicals Database
 +
| date = 2019-04-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-06-19 }}</ref>
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
 
== Production Data ==
 
== Production Data ==
{{129-28805-production}}
+
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 556,703.00
 +
| style="text-align: right;" | 212
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 552,243.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 363,981.00
 +
| style="text-align: right;" | 366
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 271,565.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 216,401.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 186,851.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
{{129-28805-waste}}
+
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 983.77 Tons
 +
| LANDFILL
 +
| 100592
 +
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 1,364.40 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 +
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 6,202.40 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 3,992.34 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,458.33 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracturing Fluid Waste
 +
| style="text-align: right;" | 9.05 Tons
 +
| LANDFILL
 +
| 100663
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracturing Fluid Waste
 +
| style="text-align: right;" | 31.33 Tons
 +
| LANDFILL
 +
| 100172
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 37,782.33 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracturing Fluid Waste
 +
| style="text-align: right;" | 86.66 Tons
 +
| RESIDUAL WASTE TRANSFER FACILITY
 +
| MID074259565
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 1.25 Tons
 +
| LANDFILL
 +
| 100592
 +
|-
 +
| 2015
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,187.66 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2016
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 479.69 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW019
 +
|-
 +
| 2016
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 531.67 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 110.00 Bbl
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|
 +
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 229.33 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 74.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW001
 +
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 188.33 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 +
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 38.33 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 36.67 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 +
|-
 +
| 2018
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 263.32 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 36.67 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 +
|-
 +
| 2018
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 409.67 Bbl
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|
 +
|-
 +
| 2019
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 566.66 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 40.00 Bbl
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 +
|-
 +
| 2134603
 +
| Primary Facility
 +
| 2013-01-24
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Horiaontal Marcellus
 +
|-
 +
| 2134659
 +
| Primary Facility
 +
| 2013-01-25
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
|  Horiaontal Marcellus
 +
|-
 +
| 2148869
 +
| Primary Facility
 +
| 2013-03-18
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| E&S inspection. Blue-White water found in the drill cuttyings pit.
 +
|-
 +
| 2164819
 +
| Primary Facility
 +
| 2013-04-23
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| 4/23/2013 keane rig drilling on the 3H.
 +
|-
 +
| 2166024
 +
| Primary Facility
 +
| 2013-05-13
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
|  At the time of inspection the drill rig was on site and placed on containment.  The erosion and sedimentation plan was on site.  The various pit located onsite appear to be in sound condition and had the required 2' of freeboard.  The Department suggest the Operator continue to inspect the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|-
 +
| 2167526
 +
| Primary Facility
 +
| 2013-05-14
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| 5/14/2013 Keane rig skidding to the 1H
 +
|-
 +
| 2189371
 +
| Primary Facility
 +
| 2013-07-18
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| 7/18/2013 Sidewinder rig drilling at depth of 7767'.
 +
|-
 +
| 2194990
 +
| Primary Facility
 +
| 2013-08-06
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| 8/6/2013 moving rig off of pad.
 +
|-
 +
| 2216368
 +
| Primary Facility
 +
| 2013-10-24
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time of inspection the well was in the process of bring stimulated.  The E&S plan was onsite and appeared to be installed as  outlined in the plan.  No sign of accelerated erosion and sedimentation in relation to the well pad or access road at the time of inspection. The Department notes that the drill pit located onsite has been back filled and the stock pile from which the material came to backfill the pit has been hydro seeded and appears to be stable.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|-
 +
| 2228547
 +
| Primary Facility
 +
| 2013-11-11
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time of inspection the well was  stimulated.  The E&S plan was onsite and appeared to be installed as  outlined in the plan.  No sign of accelerated erosion and sedimentation in relation to the well pad or access road at the time of inspection. The Department also suggests the Operator add the approved OG071 to the mail box on site. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|-
 +
| 2272550
 +
| Primary Facility
 +
| 2014-05-21
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time of inspection well appeared to be drilled, stimulated and equipped for production. The Erosion and Sedimentation Plan was on site.  No accelerated erosion or sedimentation observed in relation to the access road or well pad area.  The perimeter E&S BMPs appear to properly installed and functioning properly.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
 +
|-
 +
| 2326219
 +
| Primary Facility
 +
| 2014-11-25
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time of inspection well appeared to be drilled, stimulated and equipped for production. The Erosion and Sedimentation Plan was on site.  No accelerated erosion or sedimentation observed in relation to the access road or well pad area.  The Operator appeared to be in the process of backfilling the flow back pit located onsite. The perimeter E&S BMPs appear to properly installed and functioning properly.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
 +
|-
 +
| 2377833
 +
| Primary Facility
 +
| 2015-06-10
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| 6/10/2015 Reclaiming pad, produced fluids tanks diked and GPU's.
 +
|-
 +
| 2378642
 +
| Primary Facility
 +
| 2015-06-11
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time of inspection the well appeared to be drilled and equipped for production.  Operator was in the process of restoring the site. Perimeter controls appear to be functioning properly.
 +
|-
 +
| 2501331
 +
| Primary Facility
 +
| 2016-07-14
 +
| Site Restoration
 +
| No Violations Noted
 +
| Inspection in response to a "Well Site Restoration Report" received by the Department on 3/14/2016, at the time of inspection all earth disturbance activities were complete, PCSM BMP’s installed and functioning.
 +
|-
 +
| 2516780
 +
| Primary Facility
 +
| 2016-08-31
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| At the time of inspection the well was drilled and equipped for production.  The well apparatus and brine tank appeared to be in sound condition.  No observation of accelerated erosion or sedimentation in relation to the well pad or access road.  DEP personnel on site during inspection Donna Davis and Sam Steingrabe and Also see inspection # 2516776 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|-
 +
| 2521149
 +
| Primary Facility
 +
| 2016-09-20
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| At the time of inspection the well was drilled and equipped for production.  The well apparatus and brine tank appeared to be in sound condition.  No observation of accelerated erosion or sedimentation in relation to the well pad or access road.  DEP personnel on site during inspection Donna Davis and Sam Steingrabe and Also see inspection # 2521146 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|-
 +
| 2538194
 +
| Primary Facility
 +
| 2016-11-08
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time of inspection the well was drilled and equipped for production.  The well apparatus and brine tank appeared to be in sound condition.  No observation of accelerated erosion or sedimentation in relation to the well pad or access road.  Also see inspection # 2538185 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|-
 +
| 2543524
 +
| Primary Facility
 +
| 2016-12-08
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| At the time of inspection the well was drilled and equipped for production.  The well apparatus and brine tank appeared to be in sound condition.  No observation of accelerated erosion or sedimentation in relation to the well pad or access road.  Also see inspection # 2543509 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|-
 +
| 2642997
 +
| Primary Facility
 +
| 2017-10-03
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well drilled and equipped for production. Well tag present. Well apparatus and brine tank appear to be in sound condition. No accelerated erosion or sedimentation observed on well site or access road. No evidence that suggests a release of production fluid.
 +
|-
 +
| 2772304
 +
| Primary Facility
 +
| 2018-08-21
 +
| Complaint Inspection
 +
| No Violations Noted
 +
| Inspection in response to complaint. At the time of inspection well equipped for production. Brine tanks within secondary containment and appears structurally sound. Inspection conducted during and following a precipitation event. Precipitation runoff appears to be flowing into designated basin on site. Basin appears to be functioning as designed. Areas surrounding well site permanently stabilized with no evidence of erosion. No E&S issues were observed on site and/or on access road. - Invalid Complaint Id. - 0
 +
|-
 +
| 2845744
 +
| Primary Facility
 +
| 2019-02-22
 +
| Complaint Inspection
 +
| No Violations Noted
 +
| Multi-well site (photo #2).
 +
At time of inspection well appears equipped for production. Well pad surrounded by security fence. Two brine tanks on site.
 +
|-
 +
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
==References==
 +
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]
 +
[[Category:FracFocus]]

Latest revision as of 13:48, 16 May 2020

Well Details

Well ID: 37-129-28805
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: South Huntingdon Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 149234
Farm/Lease Name: SABATINE-SMOUSE UNIT 2H
License Status:
Spud Date:
Permit Date: 2012-12-07
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.213181
Longitude: -79.706461

For data sources see[1][2][3]

Well History

Date Event
2012-12-07 New Permit Application
2013-01-24 Performed Spud Operation
2013-07-24 Drilling Completion
2013-10-17 Perforation
2016-03-30 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-10-17 2013-10-22 7,781 4,239,750

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 CMHPG Ashland Water Viscosifier Carboxymethyl Hydroxporoyl Guar Blend 68130-15-4 100 0.00002859 0
15% Hcl Acid Reagent/PPG Used to open perfs Hydrochloric Acid 7647-01-0 15 0.00087634 0
Iron Control A Nalco Iron Control Ethylene Glycol 107-21-1 30 0.00007157 0
GBL Clearwater Gel Breaker Ethylene Glycol 107-21-1 60 0.00000044 0
Scale Inhibitor A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00007578 0
Unislik ST 50 CESI Friction Reducer Hydrotreated Light Distillite 64742-47-8 30 0.00036335 0
Proppant US Sand Co Proppant Crystalline Silica 14808-60-7 100 8.89 0
EC 6116a Nalco Biocide Polyethylene Glycol 25322-68-3 60 0.00015369 0
1, 1-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00007684 0
Dibromoacetonitrile 3252-43-5 5 0.00001281 0
Clean Volume Chevron Applachia, LLC Carrier/Base Fluid H20 7732-18-5 100 91.09 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 556,703.00 212 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 552,243.00 365 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 363,981.00 366 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 271,565.00 365 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 216,401.00 365 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 186,851.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 CHEVRON APPALACHIA LLC Drill Cuttings 983.77 Tons LANDFILL 100592
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 1,364.40 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2013 CHEVRON APPALACHIA LLC Drilling Fluid Waste 6,202.40 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 3,992.34 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014 CHEVRON APPALACHIA LLC Produced Fluid 1,458.33 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 9.05 Tons LANDFILL 100663
2014 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 31.33 Tons LANDFILL 100172
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 37,782.33 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 86.66 Tons RESIDUAL WASTE TRANSFER FACILITY MID074259565
2014 CHEVRON APPALACHIA LLC Drill Cuttings 1.25 Tons LANDFILL 100592
2015 CHEVRON APPALACHIA LLC Produced Fluid 1,187.66 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHEVRON APPALACHIA LLC Produced Fluid 479.69 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 CHEVRON APPALACHIA LLC Produced Fluid 531.67 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHEVRON APPALACHIA LLC Produced Fluid 110.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 CHEVRON APPALACHIA LLC Produced Fluid 229.33 Bbl REUSE (AT WELL PAD)
2017 CHEVRON APPALACHIA LLC Produced Fluid 74.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 CHEVRON APPALACHIA LLC Produced Fluid 188.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 38.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 CHEVRON APPALACHIA LLC Drilling Fluid Waste 36.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 CHEVRON APPALACHIA LLC Produced Fluid 263.32 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 36.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 CHEVRON APPALACHIA LLC Produced Fluid 409.67 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 CHEVRON APPALACHIA LLC Produced Fluid 566.66 Bbl REUSE (AT WELL PAD)
2019 CHEVRON APPALACHIA LLC Produced Fluid 40.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2134603 Primary Facility 2013-01-24 Drilling/Alteration No Violations Noted Horiaontal Marcellus
2134659 Primary Facility 2013-01-25 Drilling/Alteration No Violations Noted Horiaontal Marcellus
2148869 Primary Facility 2013-03-18 Routine/Complete Inspection No Violations Noted E&S inspection. Blue-White water found in the drill cuttyings pit.
2164819 Primary Facility 2013-04-23 Drilling/Alteration No Violations Noted 4/23/2013 keane rig drilling on the 3H.
2166024 Primary Facility 2013-05-13 Routine/Complete Inspection No Violations Noted At the time of inspection the drill rig was on site and placed on containment. The erosion and sedimentation plan was on site. The various pit located onsite appear to be in sound condition and had the required 2' of freeboard. The Department suggest the Operator continue to inspect the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2167526 Primary Facility 2013-05-14 Drilling/Alteration No Violations Noted 5/14/2013 Keane rig skidding to the 1H
2189371 Primary Facility 2013-07-18 Drilling/Alteration No Violations Noted 7/18/2013 Sidewinder rig drilling at depth of 7767'.
2194990 Primary Facility 2013-08-06 Drilling/Alteration No Violations Noted 8/6/2013 moving rig off of pad.
2216368 Primary Facility 2013-10-24 Routine/Complete Inspection No Violations Noted At the time of inspection the well was in the process of bring stimulated. The E&S plan was onsite and appeared to be installed as outlined in the plan. No sign of accelerated erosion and sedimentation in relation to the well pad or access road at the time of inspection. The Department notes that the drill pit located onsite has been back filled and the stock pile from which the material came to backfill the pit has been hydro seeded and appears to be stable. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2228547 Primary Facility 2013-11-11 Routine/Complete Inspection No Violations Noted At the time of inspection the well was stimulated. The E&S plan was onsite and appeared to be installed as outlined in the plan. No sign of accelerated erosion and sedimentation in relation to the well pad or access road at the time of inspection. The Department also suggests the Operator add the approved OG071 to the mail box on site. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2272550 Primary Facility 2014-05-21 Routine/Complete Inspection No Violations Noted At the time of inspection well appeared to be drilled, stimulated and equipped for production. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2326219 Primary Facility 2014-11-25 Routine/Complete Inspection No Violations Noted At the time of inspection well appeared to be drilled, stimulated and equipped for production. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The Operator appeared to be in the process of backfilling the flow back pit located onsite. The perimeter E&S BMPs appear to properly installed and functioning properly. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2377833 Primary Facility 2015-06-10 Routine/Complete Inspection No Violations Noted 6/10/2015 Reclaiming pad, produced fluids tanks diked and GPU's.
2378642 Primary Facility 2015-06-11 Routine/Complete Inspection No Violations Noted At the time of inspection the well appeared to be drilled and equipped for production. Operator was in the process of restoring the site. Perimeter controls appear to be functioning properly.
2501331 Primary Facility 2016-07-14 Site Restoration No Violations Noted Inspection in response to a "Well Site Restoration Report" received by the Department on 3/14/2016, at the time of inspection all earth disturbance activities were complete, PCSM BMP’s installed and functioning.
2516780 Primary Facility 2016-08-31 Routine/Partial Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. DEP personnel on site during inspection Donna Davis and Sam Steingrabe and Also see inspection # 2516776 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2521149 Primary Facility 2016-09-20 Routine/Partial Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. DEP personnel on site during inspection Donna Davis and Sam Steingrabe and Also see inspection # 2521146 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2538194 Primary Facility 2016-11-08 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. Also see inspection # 2538185 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2543524 Primary Facility 2016-12-08 Routine/Partial Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. Also see inspection # 2543509 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2642997 Primary Facility 2017-10-03 Routine/Complete Inspection No Violations Noted Well drilled and equipped for production. Well tag present. Well apparatus and brine tank appear to be in sound condition. No accelerated erosion or sedimentation observed on well site or access road. No evidence that suggests a release of production fluid.
2772304 Primary Facility 2018-08-21 Complaint Inspection No Violations Noted Inspection in response to complaint. At the time of inspection well equipped for production. Brine tanks within secondary containment and appears structurally sound. Inspection conducted during and following a precipitation event. Precipitation runoff appears to be flowing into designated basin on site. Basin appears to be functioning as designed. Areas surrounding well site permanently stabilized with no evidence of erosion. No E&S issues were observed on site and/or on access road. - Invalid Complaint Id. - 0
2845744 Primary Facility 2019-02-22 Complaint Inspection No Violations Noted Multi-well site (photo #2).

At time of inspection well appears equipped for production. Well pad surrounded by security fence. Two brine tanks on site.

For data sources see[8]

References