X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-065-26141"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-065-26141
 
| Well ID: 37-065-26141
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.203118, -78.738991 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.203118, -78.738991 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: HUMPHREYS 3
 
| Farm/Lease Name: HUMPHREYS 3
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
 
| Spud Date: 2008-12-22
 
| Spud Date: 2008-12-22
 
|-
 
|-
 
| Permit Date: 2008-01-16
 
| Permit Date: 2008-01-16
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.203118
 
| Latitude: 41.203118
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2008-01-16
 +
| New Permit Application
 +
|-
 +
| 2008-12-22
 +
| Performed Spud Operation
 +
|-
 +
| 2008-12-29
 +
| Drilling Completion
 +
|-
 +
| 2009-12-08
 +
| Perforation
 +
|-
 +
| 2010-02-18
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 101:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 202: Line 243:
 
| 2010
 
| 2010
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 701.00 Bbl
 
| style="text-align: right;" | 701.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 209: Line 250:
 
| 2011
 
| 2011
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 400.00 Bbl
 
| style="text-align: right;" | 400.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 216: Line 257:
 
| 2013
 
| 2013
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 240.00 Bbl
 
| style="text-align: right;" | 240.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
Line 223: Line 264:
 
| 2014
 
| 2014
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 160.00 Bbl
 
| style="text-align: right;" | 160.00 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0028428
 +
|-
 +
| 2015
 +
| [[DANNIC ENERGY CORP]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 6,720.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0028428
 
| PA0028428
Line 230: Line 278:
 
| 2016
 
| 2016
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
Line 237: Line 285:
 
| 2017
 
| 2017
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 240.00 Bbl
 
| style="text-align: right;" | 240.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT

Latest revision as of 20:40, 16 May 2020

Well Details

Well ID: 37-065-26141
Loading map...
Country: United States
State: Pennsylvania
County: Jefferson
Municipality: Snyder Township
Operator Name: DANNIC ENERGY CORP
Well Pad ID:
Farm/Lease Name: HUMPHREYS 3
License Status:
Spud Date: 2008-12-22
Permit Date: 2008-01-16
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.203118
Longitude: -78.738991

For data sources see[1][2][3]

Well History

Date Event
2008-01-16 New Permit Application
2008-12-22 Performed Spud Operation
2008-12-29 Drilling Completion
2009-12-08 Perforation
2010-02-18 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2008 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2009 DANNIC ENERGY CORP 3.00 61 0.00 0 0.00 0
2010 DANNIC ENERGY CORP 857.63 365 0.00 0 0.00 0
2011 DANNIC ENERGY CORP 473.85 273 0.00 0 0.00 0
2012 DANNIC ENERGY CORP 348.01 274 0.00 0 0.00 0
2013 DANNIC ENERGY CORP 283.28 273 0.00 0 0.00 0
2014 DANNIC ENERGY CORP 239.00 273 0.00 0 0.00 0
2015 DANNIC ENERGY CORP 194.13 273 0.00 0 0.00 0
2016 DANNIC ENERGY CORP 274.00 366 0.00 0 0.00 0
2017 DANNIC ENERGY CORP 178.00 365 0.00 0 0.00 0
2018 DANNIC ENERGY CORP 114.08 62 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 DANNIC ENERGY CORP Produced Fluid 701.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0028428
2011 DANNIC ENERGY CORP Produced Fluid 400.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0028428
2013 DANNIC ENERGY CORP Produced Fluid 240.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2014 DANNIC ENERGY CORP Produced Fluid 160.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2015 DANNIC ENERGY CORP Produced Fluid 6,720.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2016 DANNIC ENERGY CORP Produced Fluid 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2017 DANNIC ENERGY CORP Produced Fluid 240.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1758862 Primary Facility 2008-12-23 Drilling/Alteration No Violations Noted
1834210 Primary Facility 2009-10-08 Routine/Complete Inspection No Violations Noted
1847369 Primary Facility 2009-11-25 Routine/Complete Inspection No Violations Noted
1848256 Primary Facility 2009-12-08 Routine/Complete Inspection No Violations Noted
1855851 Primary Facility 2010-01-13 Routine/Complete Inspection No Violations Noted
1860836 Primary Facility 2010-01-07 Administrative/File Review Violation(s) Noted
1878747 Primary Facility 2010-04-21 Routine/Complete Inspection No Violations Noted
2183886 Primary Facility 2013-06-27 Routine/Partial Inspection No Violations Noted
2442496 Primary Facility 2016-01-20 Routine/Complete Inspection No Violations Noted
2637969 Primary Facility 2017-09-20 Routine/Complete Inspection No Violations Noted This well was drilled in a forested area off of Siple Road in December 2008. No violations were noted during this inspection, but maintenance is required on the access road, and the permit number should be attached to the wellhead.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1860836 580711 01/07/2010 2010-01-07 212WELLRCD - Failure to submit well record within 30 days of completion of drilling Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
580711 254809 NOV - Notice of Violation Comply/Closed 2010-01-08

For data sources see[7]

References