X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-081-21245"

m
 
m
 
(9 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-081-21245
 
| Well ID: 37-081-21245
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 41.3266, -77.177313 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.3266, -77.177314 | width=100% | height=100% }}
 +
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 +
|-
 +
| County: [[Lycoming_County,_Pennsylvania|Lycoming]]
 +
|-
 +
| Municipality: [[Anthony Township,_Lycoming_County,_Pennsylvania|Anthony Township]]
 
|-
 
|-
 
| Operator Name: [[EXCO RESOURCES PA LLC]]
 
| Operator Name: [[EXCO RESOURCES PA LLC]]
 
|-
 
|-
| First Permit Date: 2013-07-17
+
| Well Pad ID:  
 +
|-
 +
| Farm/Lease Name: POOR SHOT P2 6H
 
|-
 
|-
| Last Permit Date: 2013-07-17
+
| License Status:  
 
|-
 
|-
| Spud Date: None
+
| Spud Date:  
 
|-
 
|-
| Unconventional: Yes
+
| Permit Date: 2013-07-17
 
|-
 
|-
| Horizontal: No
+
| Well Type: GAS
 
|-
 
|-
| Violations: None
+
| Unconventional Well: Y
 +
|-
 +
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.3266
 
| Latitude: 41.3266
 
|-
 
|-
| Longitude: -77.177313
+
| Longitude: -77.177314
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2013-07-17
 +
| New Permit Application
 +
|-
 +
| 2014-05-14
 +
| Permit Renewal Application
 +
|-
 +
| 2015-06-01
 +
| Permit Renewal Application
 +
|-
 +
| 2016-07-01
 +
| Permit Renewal Application
 +
|-
 +
| 2017-07-31
 +
| Permit Renewal Application
 +
|-
 +
| 2019-08-14
 +
| MOD
 
|-
 
|-
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
== Production Data ==
+
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
 +
<!--== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
|}
+
!scope="col" | Water Production Days
== Waste Data ==
+
|-
 +
|}-->
 +
 
 +
<!--== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator
!scope="col" | QUANTITY
+
!scope="col" | Waste Type
!scope="col" | UNITS
+
!scope="col" | Quantity
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Disposal Method
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY NAME
+
|-
!scope="col" | FACILITY CITY
+
|}-->
!scope="col" | FACILITY STATE
+
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 
| 2205615
 
| 2205615
 +
| Primary Facility
 
| 2013-09-04
 
| 2013-09-04
| Lycoming
+
| Routine/Complete Inspection
| Anthony Twp
+
| No Violations Noted
 +
| Pad under sonstruction, no vio.  meets Pre-operational inspection requirement
 +
|-
 +
| 2484066
 +
| Primary Facility
 +
| 2016-05-11
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Routine Inspection; 5/11/2016.
 +
I entered the location at 15:56 and began the inspection.  The well pad was constructed in 2013 and no wells were ever drilled on the pad although the permit remains active.  The entire cut slope is rock stabilized but the topsoil stockpile, berm on the fill slope, berm off the access road, and infiltration basin were all seeded but have very poor growth.  Overall vegetation on the site is poor and erosion is noted into the basin on three sides.  The pad is not constructed as permitted since a small expansion of the well pad on the southwest corner of the site is not shown on the plans yet this area is within the LOD.  Japanese Knot Weed is also established along the rock-lined ditch on the northeast side of the well pad.  I recommend eradicating the invasive species as soon as possible.  I also recommend establishing vegetation, evaluating the expanded well pad area, and converting the Sedimentation Basin into a Stormwater Detention Basin.  No Violations Noted.
 +
|-
 +
| 2814214
 +
| Primary Facility
 +
| 2018-12-12
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 +
| No wells drilled. Well permit active. Expires 7/17/2019.
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 02:45, 17 May 2020

Well Details

Well ID: 37-081-21245
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Anthony Township
Operator Name: EXCO RESOURCES PA LLC
Well Pad ID:
Farm/Lease Name: POOR SHOT P2 6H
License Status:
Spud Date:
Permit Date: 2013-07-17
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.3266
Longitude: -77.177314

For data sources see[1][2][3]

Well History

Date Event
2013-07-17 New Permit Application
2014-05-14 Permit Renewal Application
2015-06-01 Permit Renewal Application
2016-07-01 Permit Renewal Application
2017-07-31 Permit Renewal Application
2019-08-14 MOD

For data sources see[4]



Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2205615 Primary Facility 2013-09-04 Routine/Complete Inspection No Violations Noted Pad under sonstruction, no vio. meets Pre-operational inspection requirement
2484066 Primary Facility 2016-05-11 Routine/Complete Inspection No Violations Noted Routine Inspection; 5/11/2016.

I entered the location at 15:56 and began the inspection. The well pad was constructed in 2013 and no wells were ever drilled on the pad although the permit remains active. The entire cut slope is rock stabilized but the topsoil stockpile, berm on the fill slope, berm off the access road, and infiltration basin were all seeded but have very poor growth. Overall vegetation on the site is poor and erosion is noted into the basin on three sides. The pad is not constructed as permitted since a small expansion of the well pad on the southwest corner of the site is not shown on the plans yet this area is within the LOD. Japanese Knot Weed is also established along the rock-lined ditch on the northeast side of the well pad. I recommend eradicating the invasive species as soon as possible. I also recommend establishing vegetation, evaluating the expanded well pad area, and converting the Sedimentation Basin into a Stormwater Detention Basin. No Violations Noted.

2814214 Primary Facility 2018-12-12 Routine/Complete Inspection No Violations Noted No wells drilled. Well permit active. Expires 7/17/2019.

For data sources see[5]

References