X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-019-21661"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-019-21661
 
| Well ID: 37-019-21661
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.815944, -80.045972 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.815944, -80.045972 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: MAGILL UNIT 1H
 
| Farm/Lease Name: MAGILL UNIT 1H
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 2010-01-09
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2009-12-21
 
| Permit Date: 2009-12-21
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 40.815944
 
| Latitude: 40.815944
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2009-12-21
 +
| New Permit Application
 +
|-
 +
| 2010-01-09
 +
| Performed Spud Operation
 +
|-
 +
| 2010-02-05
 +
| Drilling Completion
 +
|-
 +
| 2010-03-19
 +
| Perforation
 +
|-
 +
| 2010-06-01
 +
| DEVIATED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 101:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 177: Line 218:
 
| 2019
 
| 2019
 
| [[PENNENERGY RESOURCES LLC]]
 
| [[PENNENERGY RESOURCES LLC]]
| style="text-align: right;" | 37,501.00
+
| style="text-align: right;" | 148,346.00
| style="text-align: right;" | 89
+
| style="text-align: right;" | 354
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 31
 
|-
 
|-
 
|}
 
|}
Line 202: Line 243:
 
| 2010
 
| 2010
 
| [[REX ENERGY OPERATING CORP]]
 
| [[REX ENERGY OPERATING CORP]]
| Produced Fluid (in Barrels)
+
| Fracing Fluid Waste
| style="text-align: right;" | 492.50 Bbl
+
| style="text-align: right;" | 7,590.00 Bbl
| IDENTIFY METHOD IN COMMENTS
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
|  
+
| PA0091472
 
|-
 
|-
 
| 2010
 
| 2010
 
| [[REX ENERGY OPERATING CORP]]
 
| [[REX ENERGY OPERATING CORP]]
| Fracing Fluid Waste (in Barrels)
+
| Drilling Fluid Waste
| style="text-align: right;" | 18,060.00 Bbl
+
| style="text-align: right;" | 57.50 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| 301353
+
| PA0091472
 +
|-
 +
| 2010
 +
| [[REX ENERGY OPERATING CORP]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 197.50 Bbl
 +
| IDENTIFY METHOD IN COMMENTS
 +
|
 
|-
 
|-
 
| 2010
 
| 2010
 
| [[REX ENERGY OPERATING CORP]]
 
| [[REX ENERGY OPERATING CORP]]
| Drilling Fluid Waste (in Barrels)
+
| Fracing Fluid Waste
| style="text-align: right;" | 1,607.50 Bbl
+
| style="text-align: right;" | 9,287.50 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
Line 223: Line 271:
 
| 2010
 
| 2010
 
| [[REX ENERGY OPERATING CORP]]
 
| [[REX ENERGY OPERATING CORP]]
| Fracing Fluid Waste (in Barrels)
+
| Fracing Fluid Waste
| style="text-align: right;" | 7,590.00 Bbl
+
| style="text-align: right;" | 18,060.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0091472
+
| 301353
 
|-
 
|-
 
| 2010
 
| 2010
 
| [[REX ENERGY OPERATING CORP]]
 
| [[REX ENERGY OPERATING CORP]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 1,468.00 Bbl
 
| style="text-align: right;" | 1,468.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 237: Line 285:
 
| 2010
 
| 2010
 
| [[REX ENERGY OPERATING CORP]]
 
| [[REX ENERGY OPERATING CORP]]
| Fracing Fluid Waste (in Barrels)
+
| Drilling Fluid Waste
| style="text-align: right;" | 9,287.50 Bbl
+
| style="text-align: right;" | 1,607.50 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
Line 244: Line 292:
 
| 2010
 
| 2010
 
| [[REX ENERGY OPERATING CORP]]
 
| [[REX ENERGY OPERATING CORP]]
| Drilling Fluid Waste (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 1,110.00 Bbl
+
| style="text-align: right;" | 492.50 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| IDENTIFY METHOD IN COMMENTS
| 301353
+
|  
 
|-
 
|-
 
| 2010
 
| 2010
 
| [[REX ENERGY OPERATING CORP]]
 
| [[REX ENERGY OPERATING CORP]]
| Drilling Fluid Waste (in Barrels)
+
| Fracing Fluid Waste
| style="text-align: right;" | 57.50 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
|-
 
| 2010
 
| [[REX ENERGY OPERATING CORP]]
 
| Fracing Fluid Waste (in Barrels)
 
 
| style="text-align: right;" | 165.00 Bbl
 
| style="text-align: right;" | 165.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 265: Line 306:
 
| 2010
 
| 2010
 
| [[REX ENERGY OPERATING CORP]]
 
| [[REX ENERGY OPERATING CORP]]
| Drilling Fluid Waste (in Barrels)
+
| Drilling Fluid Waste
| style="text-align: right;" | 197.50 Bbl
+
| style="text-align: right;" | 1,110.00 Bbl
| IDENTIFY METHOD IN COMMENTS
 
|
 
|-
 
| 2011
 
| [[REX ENERGY OPERATING CORP]]
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 1,968.00 Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| 34-099-23127
+
| 301353
 
|-
 
|-
 
| 2011
 
| 2011
 
| [[REX ENERGY OPERATING CORP]]
 
| [[REX ENERGY OPERATING CORP]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 1,053.00 Bbl
 
| style="text-align: right;" | 1,053.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 286: Line 320:
 
| 2011
 
| 2011
 
| [[REX ENERGY OPERATING CORP]]
 
| [[REX ENERGY OPERATING CORP]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 653.00 Bbl
 
| style="text-align: right;" | 653.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-155-23584
 
| 34-155-23584
 +
|-
 +
| 2011
 +
| [[REX ENERGY OPERATING CORP]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,968.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| 34-099-23127
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 104.40 Bbl
+
| style="text-align: right;" | 521.80 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-083-24137
+
| 34-155-21447
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[REX ENERGY OPERATING CORP]]
 
| [[REX ENERGY OPERATING CORP]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 100.92 Bbl
+
| style="text-align: right;" | 196.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-007-24523
+
| 34-007-22038
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 521.80 Bbl
+
| style="text-align: right;" | 861.90 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-21447
+
| 34-155-21438
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[REX ENERGY OPERATING CORP]]
 
| [[REX ENERGY OPERATING CORP]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 196.00 Bbl
+
| style="text-align: right;" | 100.92 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-007-22038
+
| 34-007-24523
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 861.90 Bbl
+
| style="text-align: right;" | 104.40 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-083-24137
 +
|-
 +
| 2013
 +
| [[RE GAS DEV LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 308.80 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-21438
+
| 34-155-23732
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 140.36 Bbl
 
| style="text-align: right;" | 140.36 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 335: Line 383:
 
| 2013
 
| 2013
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 427.14 Bbl
 
| style="text-align: right;" | 427.14 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 342: Line 390:
 
| 2013
 
| 2013
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 67.28 Bbl
 
| style="text-align: right;" | 67.28 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 349: Line 397:
 
| 2013
 
| 2013
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 526.64 Bbl
 
| style="text-align: right;" | 526.64 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-155-21438
 
| 34-155-21438
|-
 
| 2013
 
| [[RE GAS DEV LLC]]
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 308.80 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-23732
 
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 81.00 Bbl
 
| style="text-align: right;" | 81.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 369: Line 410:
 
|-
 
|-
 
| 2015
 
| 2015
|  
+
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 90.00 Bbl
+
| style="text-align: right;" | 100.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-133-20525
+
| 34-155-21893
 
|-
 
|-
 
| 2015
 
| 2015
|  
+
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 100.00 Bbl
+
| style="text-align: right;" | 90.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-21893
+
| 34-133-20525
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 410.00 Bbl
 
| style="text-align: right;" | 410.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
Line 391: Line 432:
 
| 2016
 
| 2016
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 +
| style="text-align: right;" | 105.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-24462
 +
|-
 +
| 2016
 +
| [[RE GAS DEV LLC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 223.00 Bbl
 
| style="text-align: right;" | 223.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-007-21847
 
| 34-007-21847
 
|-
 
|-
| 2016
+
| 2017
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Other Oil & Gas Wastes
| style="text-align: right;" | 105.00 Bbl
+
| style="text-align: right;" | 4.34 Tons
| INJECTION DISPOSAL WELL
+
| LANDFILL
| 34-133-24462
+
| SWF 1025
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 100.00 Bbl
 
| style="text-align: right;" | 100.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
Line 412: Line 460:
 
| 2017
 
| 2017
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Other Oil & Gas Wastes (in Tons) RWC 899
+
| Produced Fluid
| style="text-align: right;" | 4.34 Tons
 
| LANDFILL
 
| SWF 1025
 
|-
 
| 2017
 
| [[RE GAS DEV LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
 
| style="text-align: right;" | 1,270.00 Bbl
 
| style="text-align: right;" | 1,270.00 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
Line 426: Line 467:
 
| 2017
 
| 2017
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 380.00 Bbl
 
| style="text-align: right;" | 380.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 433: Line 474:
 
| 2018
 
| 2018
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-155-24079
 
| 34-155-24079
 +
|-
 +
| 2018
 +
| [[PENNENERGY RESOURCES LLC]]
 +
| Soil Contaminated by Oil
 +
| style="text-align: right;" | 5.67 Tons
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| PAD085690592
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 374.00 Bbl
 
| style="text-align: right;" | 374.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 447: Line 495:
 
| 2018
 
| 2018
 
| [[PENNENERGY RESOURCES LLC]]
 
| [[PENNENERGY RESOURCES LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Soil Contaminated by Oil & Gas Related Spills
| style="text-align: right;" | 810.00 Bbl
+
| style="text-align: right;" | 5.67 Tons
| REUSE (AT WELL PAD)
+
| RESIDUAL WASTE PROCESSING FACILITY
|  
+
| PAD085690592
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Drilling Fluid Waste (in Tons) RWC 803
+
| Drilling Fluid Waste
 
| style="text-align: right;" | 5.00 Tons
 
| style="text-align: right;" | 5.00 Tons
 
| LANDFILL
 
| LANDFILL
Line 460: Line 508:
 
|-
 
|-
 
| 2018
 
| 2018
 +
| [[RE GAS DEV LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 810.00 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 
| [[PENNENERGY RESOURCES LLC]]
 
| [[PENNENERGY RESOURCES LLC]]
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
+
| Produced Fluid
| style="text-align: right;" | 5.67 Tons
+
| style="text-align: right;" | 100.00 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| INJECTION DISPOSAL WELL
| PAD085690592
+
| 34-155-23196
 +
|-
 +
| 2019
 +
| [[PENNENERGY RESOURCES LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 217.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-22403
 
|-
 
|-
 
| 2019
 
| 2019
 
| [[PENNENERGY RESOURCES LLC]]
 
| [[PENNENERGY RESOURCES LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 293.00 Bbl
+
| style="text-align: right;" | 1,038.29 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 +
|-
 +
| 2019
 +
| [[PENNENERGY RESOURCES LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 42.57 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 
|-
 
|-
 
|}
 
|}
Line 566: Line 635:
 
|-
 
|-
 
|}
 
|}
<!--==== Penalties Applied ====
+
==== Penalties Applied ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Violation ID
 
!scope="col" | Violation ID
Line 577: Line 646:
 
!scope="col" | Amount Collected
 
!scope="col" | Amount Collected
 
|-
 
|-
|}-->
+
| 583061
 +
|
 +
|
 +
|
 +
|
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
 
  | title =Oil and Gas Compliance Report
 
  | title =Oil and Gas Compliance Report

Revision as of 21:42, 21 May 2020

Well Details

Well ID: 37-019-21661
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Forward Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 148814
Farm/Lease Name: MAGILL UNIT 1H
License Status:
Spud Date:
Permit Date: 2009-12-21
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.815944
Longitude: -80.045972

For data sources see[1][2][3]

Well History

Date Event
2009-12-21 New Permit Application
2010-01-09 Performed Spud Operation
2010-02-05 Drilling Completion
2010-03-19 Perforation
2010-06-01 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 REX ENERGY OPERATING CORP 0.00 0 0.00 0 0.00 0
2010 REX ENERGY OPERATING CORP 198,864.85 153 0.00 0 171.47 153
2011 REX ENERGY OPERATING CORP 399,777.00 353 0.00 0 112.00 353
2012 RE GAS DEV LLC 237,009.24 266 0.00 0 13.96 266
2013 RE GAS DEV LLC 271,154.27 365 0.00 0 39.42 365
2014 RE GAS DEV LLC 228,440.34 365 5.07 184 41.50 181
2015 RE GAS DEV LLC 237,903.81 359 0.00 0 30.20 209
2016 RE GAS DEV LLC 186,587.04 358 0.00 0 8.01 120
2017 RE GAS DEV LLC 167,091.47 356 0.00 0 5.19 176
2018 PENNENERGY RESOURCES LLC 158,878.57 353 0.00 0 1.63 62
2019 PENNENERGY RESOURCES LLC 148,346.00 354 0.00 0 0.00 31

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 REX ENERGY OPERATING CORP Fracing Fluid Waste 7,590.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 REX ENERGY OPERATING CORP Drilling Fluid Waste 57.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 REX ENERGY OPERATING CORP Drilling Fluid Waste 197.50 Bbl IDENTIFY METHOD IN COMMENTS
2010 REX ENERGY OPERATING CORP Fracing Fluid Waste 9,287.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010 REX ENERGY OPERATING CORP Fracing Fluid Waste 18,060.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010 REX ENERGY OPERATING CORP Produced Fluid 1,468.00 Bbl INJECTION DISPOSAL WELL 34-155-23584
2010 REX ENERGY OPERATING CORP Drilling Fluid Waste 1,607.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010 REX ENERGY OPERATING CORP Produced Fluid 492.50 Bbl IDENTIFY METHOD IN COMMENTS
2010 REX ENERGY OPERATING CORP Fracing Fluid Waste 165.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010 REX ENERGY OPERATING CORP Drilling Fluid Waste 1,110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 REX ENERGY OPERATING CORP Produced Fluid 1,053.00 Bbl INJECTION DISPOSAL WELL 34-049-23127
2011 REX ENERGY OPERATING CORP Produced Fluid 653.00 Bbl INJECTION DISPOSAL WELL 34-155-23584
2011 REX ENERGY OPERATING CORP Produced Fluid 1,968.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-099-23127
2012 RE GAS DEV LLC Produced Fluid 521.80 Bbl INJECTION DISPOSAL WELL 34-155-21447
2012 REX ENERGY OPERATING CORP Produced Fluid 196.00 Bbl INJECTION DISPOSAL WELL 34-007-22038
2012 RE GAS DEV LLC Produced Fluid 861.90 Bbl INJECTION DISPOSAL WELL 34-155-21438
2012 REX ENERGY OPERATING CORP Produced Fluid 100.92 Bbl INJECTION DISPOSAL WELL 34-007-24523
2012 RE GAS DEV LLC Produced Fluid 104.40 Bbl INJECTION DISPOSAL WELL 34-083-24137
2013 RE GAS DEV LLC Produced Fluid 308.80 Bbl INJECTION DISPOSAL WELL 34-155-23732
2013 RE GAS DEV LLC Produced Fluid 140.36 Bbl INJECTION DISPOSAL WELL 34-155-23223
2013 RE GAS DEV LLC Produced Fluid 427.14 Bbl INJECTION DISPOSAL WELL 34-155-23759
2013 RE GAS DEV LLC Produced Fluid 67.28 Bbl INJECTION DISPOSAL WELL 34-133-21076
2013 RE GAS DEV LLC Produced Fluid 526.64 Bbl INJECTION DISPOSAL WELL 34-155-21438
2014 RE GAS DEV LLC Produced Fluid 81.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2015 RE GAS DEV LLC Produced Fluid 100.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2015 RE GAS DEV LLC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-133-20525
2016 RE GAS DEV LLC Produced Fluid 410.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RE GAS DEV LLC Produced Fluid 105.00 Bbl INJECTION DISPOSAL WELL 34-133-24462
2016 RE GAS DEV LLC Produced Fluid 223.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2017 RE GAS DEV LLC Other Oil & Gas Wastes 4.34 Tons LANDFILL SWF 1025
2017 RE GAS DEV LLC Produced Fluid 100.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RE GAS DEV LLC Produced Fluid 1,270.00 Bbl REUSE (AT WELL PAD)
2017 RE GAS DEV LLC Produced Fluid 380.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 RE GAS DEV LLC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 PENNENERGY RESOURCES LLC Soil Contaminated by Oil 5.67 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 RE GAS DEV LLC Produced Fluid 374.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 PENNENERGY RESOURCES LLC Soil Contaminated by Oil & Gas Related Spills 5.67 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 RE GAS DEV LLC Drilling Fluid Waste 5.00 Tons LANDFILL 06-08438
2018 RE GAS DEV LLC Produced Fluid 810.00 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Produced Fluid 100.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 PENNENERGY RESOURCES LLC Produced Fluid 217.00 Bbl INJECTION DISPOSAL WELL 34-155-22403
2019 PENNENERGY RESOURCES LLC Produced Fluid 1,038.29 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Produced Fluid 42.57 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1855714 Primary Facility 2010-01-13 Drilling/Alteration No Violations Noted
1856957 Primary Facility 2010-01-19 Drilling/Alteration No Violations Noted
1869205 Primary Facility 2010-03-10 Drilling/Alteration Viol(s) Noted & Immediately Corrected
1869208 Primary Facility 2010-03-11 Drilling/Alteration No Violations Noted
1884620 Primary Facility 2010-05-11 Routine/Complete Inspection No Violations Noted
1890553 Primary Facility 2010-06-02 Routine/Complete Inspection No Violations Noted
1896831 Primary Facility 2010-07-01 Routine/Complete Inspection No Violations Noted
1941025 Primary Facility 2010-12-06 Routine/Complete Inspection No Violations Noted E&S BMP's in place at time of inspection. Ground was snow covered and frozen. Drilling pit and frac-pit reclaimed. Both Magill wells Unit 1H and 2H were equipped for production and producing at the time of the inspection. No spills found.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1869205 583061 03/10/2010 2010-03-10 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
583061

For data sources see[7]

References