== Well Details == | == Well Details == | ||
− | {| class="wikitable" width="95%" | + | {| class="wikitable welldetails" width="95%" |
| Well ID: 37-005-30620 | | Well ID: 37-005-30620 | ||
− | | style=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.966553, -79.227608 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Country: United States |
|- | |- | ||
− | | | + | | State: Pennsylvania |
|- | |- | ||
− | | | + | | County: [[Armstrong_County,_Pennsylvania|Armstrong]] |
|- | |- | ||
− | | | + | | Municipality: [[Redbank Township,_Armstrong_County,_Pennsylvania|Redbank Township]] |
|- | |- | ||
− | | | + | | Operator Name: |
|- | |- | ||
− | | | + | | Well Pad ID: |
|- | |- | ||
− | | | + | | Farm/Lease Name: PHILLIPS 4 |
|- | |- | ||
− | | Latitude: 40. | + | | License Status: |
+ | |- | ||
+ | | Spud Date: | ||
+ | |- | ||
+ | | Permit Date: 2010-05-11 | ||
+ | |- | ||
+ | | Well Type: GAS | ||
+ | |- | ||
+ | | Unconventional Well: N | ||
+ | |- | ||
+ | | Configuration: Vertical Well | ||
+ | |- | ||
+ | | Conservation: No | ||
+ | |- | ||
+ | | Latitude: 40.966553 | ||
|- | |- | ||
| Longitude: -79.227608 | | Longitude: -79.227608 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Permits Issued Detail Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref><ref>{{cite web | ||
+ | | title = Spud Data Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-04-30 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-16 }}</ref><ref>{{cite web | ||
+ | | title = Oil and Gas Well Pad Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2010-05-11 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2010-06-21 | ||
+ | | Performed Spud Operation | ||
|- | |- | ||
|} | |} | ||
− | == | + | For data sources see<ref>{{cite web |
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Job Number |
− | !scope="col" | | + | !scope="col" | Trade Name |
− | !scope="col" | | + | !scope="col" | Supplier |
− | !scope="col" | | + | !scope="col" | Purpose |
− | !scope="col" | | + | !scope="col" | Ingredient Name |
− | !scope="col" | | + | !scope="col" | CAS Number |
− | !scope="col" | | + | !scope="col" | Additive Percentage by Mass |
− | |} | + | !scope="col" | Job Percentage by Mass |
− | == | + | !scope="col" | Mass Used (lb) |
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Stimulation Date |
− | !scope="col" | | + | !scope="col" | Phase Number |
− | !scope="col" | | + | !scope="col" | Chemical Agent |
− | !scope="col" | | + | !scope="col" | Volume (gal) |
− | !scope="col" | | + | !scope="col" | Treating Pressure (psi) |
− | !scope="col" | | + | !scope="col" | Breakdown Pressure (psi) |
− | + | |- | |
− | + | |}--> | |
− | + | ||
− | |} | + | <!--== Production Data == |
− | == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Period |
− | !scope="col" | | + | !scope="col" | Operator Name |
− | !scope="col" | | + | !scope="col" | Gas Quantity (mcf) |
− | !scope="col" | | + | !scope="col" | Gas Production Days |
− | !scope="col" | | + | !scope="col" | Oil Quantity (bbl) |
+ | !scope="col" | Oil Production Days | ||
+ | !scope="col" | Water Quantity (bbl) | ||
+ | !scope="col" | Water Production Days | ||
|- | |- | ||
− | | | + | |}--> |
− | + | ||
− | | | + | <!--== Waste Data == |
− | | | + | {| class="wikitable sortable" width="95%" |
− | | | + | !scope="col" | Period |
+ | !scope="col" | Operator | ||
+ | !scope="col" | Waste Type | ||
+ | !scope="col" | Quantity | ||
+ | !scope="col" | Disposal Method | ||
+ | !scope="col" | Waste Facility ID | ||
|- | |- | ||
+ | |}--> | ||
+ | |||
+ | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Inspection ID | ||
+ | !scope="col" | Inspection Category | ||
+ | !scope="col" | Inspection Date | ||
+ | !scope="col" | Inspection Type | ||
+ | !scope="col" | Inspection Result | ||
+ | !scope="col" | Inspection Comments | ||
|- | |- | ||
| 1894068 | | 1894068 | ||
+ | | Primary Facility | ||
| 2010-06-24 | | 2010-06-24 | ||
+ | | Routine/Complete Inspection | ||
| Violation(s) Noted | | Violation(s) Noted | ||
| Drilling was ongoing at the time of the inspection. Below grade pit located onsite and it had more than the required two feet of lined freeboard. Noted that the silt fence or hay bales had not been installed as outlined in the E&S plan rendering, however this BMP was not needed to minimize accelerated erosion and sedimentation on this site. Access road erosion controls were not adequate to effectively minimize accelerated erosion & sedimentation. There was no observed way to effectively collect runoff from the access road and the surrounding area appeared to be a former strip job area that was devoid of vegetation capable of handling the runoff flow. In addition a culvert had been placed under the access road near an UNT (Unamed Tributary) to Pine Run and this culvert had no BMP's to effectively minimize accelerated erosion & sedimentation. The outflow from this culvert flows directly into the UNT to Pine Run without any erosion controls to minimize sediment generation & transport. | | Drilling was ongoing at the time of the inspection. Below grade pit located onsite and it had more than the required two feet of lined freeboard. Noted that the silt fence or hay bales had not been installed as outlined in the E&S plan rendering, however this BMP was not needed to minimize accelerated erosion and sedimentation on this site. Access road erosion controls were not adequate to effectively minimize accelerated erosion & sedimentation. There was no observed way to effectively collect runoff from the access road and the surrounding area appeared to be a former strip job area that was devoid of vegetation capable of handling the runoff flow. In addition a culvert had been placed under the access road near an UNT (Unamed Tributary) to Pine Run and this culvert had no BMP's to effectively minimize accelerated erosion & sedimentation. The outflow from this culvert flows directly into the UNT to Pine Run without any erosion controls to minimize sediment generation & transport. | ||
− | |||
− | |||
|- | |- | ||
| 1894851 | | 1894851 | ||
+ | | Primary Facility | ||
| 2010-06-24 | | 2010-06-24 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| | | | ||
− | |||
− | |||
|- | |- | ||
| 1896788 | | 1896788 | ||
+ | | Primary Facility | ||
| 2010-07-07 | | 2010-07-07 | ||
+ | | Routine/Complete Inspection | ||
| Outstanding Violations - No Viols Req'd | | Outstanding Violations - No Viols Req'd | ||
| Drilling appeared to have been completed at the time of the inspection. Observed no accelerated erosion & sedimentation in relation to the site. Culverted runoff ditch had clean rock placed in the inlet and outlet of the culvert however additional work was required due to the existing nature of the surrounding landscape. Spoke with operator representative Mr. Ripple while onsite and he stated that final road grading work will be completed the end of next or the beginning of the following week. | | Drilling appeared to have been completed at the time of the inspection. Observed no accelerated erosion & sedimentation in relation to the site. Culverted runoff ditch had clean rock placed in the inlet and outlet of the culvert however additional work was required due to the existing nature of the surrounding landscape. Spoke with operator representative Mr. Ripple while onsite and he stated that final road grading work will be completed the end of next or the beginning of the following week. | ||
− | |||
− | |||
|- | |- | ||
| 1902371 | | 1902371 | ||
+ | | Primary Facility | ||
| 2010-08-02 | | 2010-08-02 | ||
+ | | Routine/Complete Inspection | ||
| Outstanding Violations - No Viols Req'd | | Outstanding Violations - No Viols Req'd | ||
| Drilling appeared to have been completed at the time of the inspection. Observed no accelerated erosion & sedimentation in relation to the site. Culverted runoff ditch had clean rock placed in the inlet and outlet of the culvert however additional work was required due to the existing nature of the surrounding landscape. Spoke with operator representative Mr. Ripple while onsite. Mr. Ripple stated that final road work had not as of yet been completed. Mr. Ripple stated that rock had been placed in the culvert outlet, however sediment was noted as beginning to fill in between the rocks. Mr. Ripple and WQS Higgins spoke about the implementation of a small sediment trap and rock lined ditch. Mr. Ripple indicated that he will implement the sediment trap in the near future. | | Drilling appeared to have been completed at the time of the inspection. Observed no accelerated erosion & sedimentation in relation to the site. Culverted runoff ditch had clean rock placed in the inlet and outlet of the culvert however additional work was required due to the existing nature of the surrounding landscape. Spoke with operator representative Mr. Ripple while onsite. Mr. Ripple stated that final road work had not as of yet been completed. Mr. Ripple stated that rock had been placed in the culvert outlet, however sediment was noted as beginning to fill in between the rocks. Mr. Ripple and WQS Higgins spoke about the implementation of a small sediment trap and rock lined ditch. Mr. Ripple indicated that he will implement the sediment trap in the near future. | ||
− | |||
− | |||
|- | |- | ||
| 1912962 | | 1912962 | ||
+ | | Primary Facility | ||
| 2010-09-14 | | 2010-09-14 | ||
+ | | Compliance Evaluation | ||
| No Violations Noted | | No Violations Noted | ||
| Final road grading and culvert erosion control had been completed. Due to the nature of the surrounding area, specifically what appears to be a former strip mine area, the access road, culvert, and erosion controls will need to be monitored and maintained to insure their functionality on a regular basis. | | Final road grading and culvert erosion control had been completed. Due to the nature of the surrounding area, specifically what appears to be a former strip mine area, the access road, culvert, and erosion controls will need to be monitored and maintained to insure their functionality on a regular basis. | ||
+ | |- | ||
+ | |} | ||
+ | ==== Violations Commited ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Inspection ID | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Violation Date | ||
+ | !scope="col" | Date Resolved | ||
+ | !scope="col" | Violation Code | ||
+ | !scope="col" | Violation Type | ||
+ | !scope="col" | Violation Comments | ||
+ | |- | ||
+ | | 1894068 | ||
+ | | 590203 | ||
+ | | 06/24/2010 | ||
+ | | 2010-06-24 | ||
+ | | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | ||
+ | | Environmental Health & Safety | ||
+ | | | ||
+ | |- | ||
+ | | 1894068 | ||
+ | | 590204 | ||
+ | | 06/24/2010 | ||
+ | | 2010-06-24 | ||
+ | | 102.4INADPLN - E&S Plan not adequate | ||
+ | | Administrative | ||
| | | | ||
|- | |- | ||
|} | |} | ||
+ | ==== Penalties Applied ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Penalty ID | ||
+ | !scope="col" | Penalty Code | ||
+ | !scope="col" | Penalty Status | ||
+ | !scope="col" | Penalty Date | ||
+ | !scope="col" | Enforcement Date | ||
+ | !scope="col" | Penalty Amount | ||
+ | !scope="col" | Amount Collected | ||
+ | |- | ||
+ | | 590203 | ||
+ | | 259588 | ||
+ | | NOV - Notice of Violation | ||
+ | | Comply/Closed | ||
+ | | | ||
+ | | 2010-09-14 | ||
+ | | style="text-align: right;" | | ||
+ | | style="text-align: right;" | | ||
+ | |- | ||
+ | | 590204 | ||
+ | | 259588 | ||
+ | | NOV - Notice of Violation | ||
+ | | Comply/Closed | ||
+ | | | ||
+ | | 2010-09-14 | ||
+ | | style="text-align: right;" | | ||
+ | | style="text-align: right;" | | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Compliance Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
==References== | ==References== | ||
− | + | <references/> | |
− | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
+ | [[Category:Pennsylvania Wells]] |
Well ID: 37-005-30620 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.966553,"lon":-79.227608,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Redbank Township | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: PHILLIPS 4 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-05-11 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.966553 | |
Longitude: -79.227608 |
Date | Event |
---|---|
2010-05-11 | New Permit Application |
2010-06-21 | Performed Spud Operation |
For data sources see[4]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1894068 | Primary Facility | 2010-06-24 | Routine/Complete Inspection | Violation(s) Noted | Drilling was ongoing at the time of the inspection. Below grade pit located onsite and it had more than the required two feet of lined freeboard. Noted that the silt fence or hay bales had not been installed as outlined in the E&S plan rendering, however this BMP was not needed to minimize accelerated erosion and sedimentation on this site. Access road erosion controls were not adequate to effectively minimize accelerated erosion & sedimentation. There was no observed way to effectively collect runoff from the access road and the surrounding area appeared to be a former strip job area that was devoid of vegetation capable of handling the runoff flow. In addition a culvert had been placed under the access road near an UNT (Unamed Tributary) to Pine Run and this culvert had no BMP's to effectively minimize accelerated erosion & sedimentation. The outflow from this culvert flows directly into the UNT to Pine Run without any erosion controls to minimize sediment generation & transport. |
1894851 | Primary Facility | 2010-06-24 | Drilling/Alteration | No Violations Noted | |
1896788 | Primary Facility | 2010-07-07 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | Drilling appeared to have been completed at the time of the inspection. Observed no accelerated erosion & sedimentation in relation to the site. Culverted runoff ditch had clean rock placed in the inlet and outlet of the culvert however additional work was required due to the existing nature of the surrounding landscape. Spoke with operator representative Mr. Ripple while onsite and he stated that final road grading work will be completed the end of next or the beginning of the following week. |
1902371 | Primary Facility | 2010-08-02 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | Drilling appeared to have been completed at the time of the inspection. Observed no accelerated erosion & sedimentation in relation to the site. Culverted runoff ditch had clean rock placed in the inlet and outlet of the culvert however additional work was required due to the existing nature of the surrounding landscape. Spoke with operator representative Mr. Ripple while onsite. Mr. Ripple stated that final road work had not as of yet been completed. Mr. Ripple stated that rock had been placed in the culvert outlet, however sediment was noted as beginning to fill in between the rocks. Mr. Ripple and WQS Higgins spoke about the implementation of a small sediment trap and rock lined ditch. Mr. Ripple indicated that he will implement the sediment trap in the near future. |
1912962 | Primary Facility | 2010-09-14 | Compliance Evaluation | No Violations Noted | Final road grading and culvert erosion control had been completed. Due to the nature of the surrounding area, specifically what appears to be a former strip mine area, the access road, culvert, and erosion controls will need to be monitored and maintained to insure their functionality on a regular basis. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1894068 | 590203 | 06/24/2010 | 2010-06-24 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | |
1894068 | 590204 | 06/24/2010 | 2010-06-24 | 102.4INADPLN - E&S Plan not adequate | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
590203 | 259588 | NOV - Notice of Violation | Comply/Closed | 2010-09-14 | |||
590204 | 259588 | NOV - Notice of Violation | Comply/Closed | 2010-09-14 |
For data sources see[5]