X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-30405"

m
m
Line 189: Line 189:
  
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Wells]]

Revision as of 18:16, 28 June 2014

Well Details

Well ID: 37-005-30405
Loading map...
Operator Name: XTO ENERGY INC
First Permit Date: 2009-07-08
Last Permit Date: 2009-07-08
Spud Date: 2010-04-08
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.843161
Longitude: -79.254203

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 6393.0 359.0 0.0 0.0 0.0 0.0
2012-0 10258.0 366.0 0.0 0.0 0.0 0.0
2011-0 8338.0 345.0 0.0 0.0 0.0 0.0
2010-0 4178.0 242.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2010-0 PRODUCED FLUID 41.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAR000519462 ADVANCED WASTE SERVICES OF PA (NEW CASTLE) NEW CASTLE PA
2010-0 PRODUCED FLUID 6.0 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026310 CLEARFIELD MUNICIPAL SEWAGE TREATMENT PLANT CLEARFIELD PA
2010-0 PRODUCED FLUID 5.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA
2010-0 PRODUCED FLUID 1.0 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034 JOHNSTOWN SEWAGE TREATMENT PLANT JOHNSTOWN PA
2010-0 PRODUCED FLUID 6.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY JOSEPHINE PA
2010-0 PRODUCED FLUID 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0020346 PUNXSUTAWNEY BORO STP PUNXSUTAWNEY PA
2010-0 PRODUCED FLUID 2.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS COMPANY SALTSBURG PA
2013-0 PRODUCED FLUID 47.0 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0020346 PUNXSUTAWNEY BORO SEWAGE TREATMENT PLANT PUNXSUTAWNEY PA

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1877346 2010-04-14 No Violations Noted Drilling appeared to have been completed at the time of the inspection. Below grade pits located onsite and both had more than the required two feet of freeboard. Observed no accelerated erosion & sedimentation with respect to the access road or well-site. Noted that the silt fencing had been installed across an existing swale at the bottom of the disturbed area for the well pad construction. Installed in the manner the silt fencing will not function properly. A collection ditch stabilized with rock or erosion control matting with a small sediment trap at the outlet would have been a more effective erosion control BMP.

References