Difference between revisions of "37-021-21156"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-021-21156
 
| Well ID: 37-021-21156
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.408886, -78.952666 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.408886, -78.952666 | width=100% | height=100% }}  
 +
|-
 +
| County: [[Cambria County, Pennsylvania|Cambria]]
 +
|-
 +
| Municipality: [[Jackson Township, Cambria County, Pennsylvania|Jackson Township]]
 
|-
 
|-
 
| Operator Name: [[PEOPLES NATURAL GAS CO LLC]]
 
| Operator Name: [[PEOPLES NATURAL GAS CO LLC]]
 +
|-
 +
| Well Pad ID:
 +
|-
 +
| Farm/Lease Name: READE 6
 
|-
 
|-
 
| First Permit Date: 2010-07-15
 
| First Permit Date: 2010-07-15
Line 11: Line 19:
 
| Last Permit Date: 2010-07-15
 
| Last Permit Date: 2010-07-15
 
|-
 
|-
| Spud Date: None
+
| Spud Date:  
 
|-
 
|-
 
| Unconventional: No
 
| Unconventional: No
Line 17: Line 25:
 
| Horizontal: No
 
| Horizontal: No
 
|-
 
|-
| Violations: None
+
| Well Status:
 +
|-
 +
| Violations: 0
 
|-
 
|-
 
| Latitude: 40.408886
 
| Latitude: 40.408886
Line 34: Line 44:
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 46: Line 62:
 
!scope="col" | FACILITY STATE
 
!scope="col" | FACILITY STATE
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 53: Line 75:
 
!scope="col" | COMMENT
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 
|-
 
|-
 
| 1911226
 
| 1911226
Line 60: Line 84:
  
  
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 67: Line 93:
 
| No Violations Noted
 
| No Violations Noted
 
| A pre drilling meeting was held at the Rager Mtn Storage field office.  DEP representative, Paul Wyrwas, Rick Hoover, and Ed Renwick along with PNG representatives (Paul Sekinger, Nicholas Barone and others), Union Drilling and remaining subcontractors were present.  Review of the Drilling procedure along with the future plans of the site.  At the time of inspection, no E&S and IW issues. Site pad was in the process of completion.  Filter fence was installed along with wooden barrier.  DEP requested that an additional filter fencing or sock absorbent should be installed on the down gradient side of wooden barrier due high quality stream area and steepness of grade.  Area of disturbance is 3 acres.  PPC plan is also present at the site.  DEP requested type of liner to be used at the site and request for a bond log of cement upon completion of cementing.  It appears that the well is >1000 ft from any potable wells.
 
| A pre drilling meeting was held at the Rager Mtn Storage field office.  DEP representative, Paul Wyrwas, Rick Hoover, and Ed Renwick along with PNG representatives (Paul Sekinger, Nicholas Barone and others), Union Drilling and remaining subcontractors were present.  Review of the Drilling procedure along with the future plans of the site.  At the time of inspection, no E&S and IW issues. Site pad was in the process of completion.  Filter fence was installed along with wooden barrier.  DEP requested that an additional filter fencing or sock absorbent should be installed on the down gradient side of wooden barrier due high quality stream area and steepness of grade.  Area of disturbance is 3 acres.  PPC plan is also present at the site.  DEP requested type of liner to be used at the site and request for a bond log of cement upon completion of cementing.  It appears that the well is >1000 ft from any potable wells.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Inspection Report
 
+
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 11:20, 26 June 2015

Well Details

Well ID: 37-021-21156
Loading map...
County: Cambria
Municipality: Jackson Township
Operator Name: PEOPLES NATURAL GAS CO LLC
Well Pad ID:
Farm/Lease Name: READE 6
First Permit Date: 2010-07-15
Last Permit Date: 2010-07-15
Spud Date:
Unconventional: No
Horizontal: No
Well Status:
Violations: 0
Latitude: 40.408886
Longitude: -78.952666

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1911226 2010-09-02 No Violations Noted At the time of inspection, no E&S and IW issues. Site pad was in the process of completion. Filter fence was installed. Access road was in the process of completion. Site design showed series of drainage culverts along access road. Spud meeting schedule for the week of 9/13/10. PNG supplied DEP with a drilling plan for the proposed storage well.


1912793 2010-09-14 No Violations Noted A pre drilling meeting was held at the Rager Mtn Storage field office. DEP representative, Paul Wyrwas, Rick Hoover, and Ed Renwick along with PNG representatives (Paul Sekinger, Nicholas Barone and others), Union Drilling and remaining subcontractors were present. Review of the Drilling procedure along with the future plans of the site. At the time of inspection, no E&S and IW issues. Site pad was in the process of completion. Filter fence was installed along with wooden barrier. DEP requested that an additional filter fencing or sock absorbent should be installed on the down gradient side of wooden barrier due high quality stream area and steepness of grade. Area of disturbance is 3 acres. PPC plan is also present at the site. DEP requested type of liner to be used at the site and request for a bond log of cement upon completion of cementing. It appears that the well is >1000 ft from any potable wells.

For data sources see[3]