X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-169-25644"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-169-25644
 
| Well ID: 34-169-25644
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.6747241762, -81.8636597377 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.67472418, -81.86365974 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Wayne County, Ohio|Wayne]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[INDUSTRY STANDARD SUPPLIES INC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2009-09-21
 
| Spud Date: 2009-09-21
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 40.6747241762
+
| Latitude: 40.67472418
 
|-
 
|-
| Longitude: -81.8636597377
+
| Longitude: -81.86365974
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2009-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2010-0
 +
| style="text-align:right;" | 5506.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 1612.0
 +
|
 +
|-
 +
|-
 +
| 2012-0
 +
| style="text-align:right;" | 6319.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 475.0
 +
|
 +
|-
 +
|-
 +
| 2013-0
 +
| style="text-align:right;" | 2953.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 310.0
 +
|
 +
|-
 +
|-
 +
| 2014-0
 +
| style="text-align:right;" | 2177.0
 +
| style="text-align:right;" | 365.0
 +
|
 +
|
 +
| style="text-align:right;" | 107.0
 +
| style="text-align:right;" | 365.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 103:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 +
|-
 +
| 1066772294
 +
| 2009-09-21
 +
|
 +
| Arrive to dig pits in Floodplain area and put pit up on the hill away from problems and most likely out of the floodplain.Rig also moving in to drill today.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 109027388
 +
| 2009-09-28
 +
|
 +
| Rig has moved and I had call about the mud on the location and the road.Neighbor was worried that the mud on the location would end up in the creek. I advised that there was a siltfence in place for that so it would no occur .I also advised that I would be on site today and would make sure there was not a problem.Check site and found that everything was just fine no run off problems .
 +
|
 +
|
 +
|
 +
|-
 
|-
 
|-
 
| -132218536
 
| -132218536
 
| 2009-09-18
 
| 2009-09-18
|
+
|  
 
| Met dozer operator on site and review site to be constructed for HB278 well.
 
| Met dozer operator on site and review site to be constructed for HB278 well.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1695089873
 
| -1695089873
 
| 2013-01-24
 
| 2013-01-24
|
+
|  
 
| This is a producing plunger lift well.  There were no problems noted at the time of the inspection.
 
| This is a producing plunger lift well.  There were no problems noted at the time of the inspection.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| 1066772294
 
| 2009-09-21
 
|
 
| Arrive to dig pits in Floodplain area and put pit up on the hill away from problems and most likely out of the floodplain.Rig also moving in to drill today.
 
|
 
|
 
|
 
|-
 
|-
 
| 109027388
 
| 2009-09-28
 
|
 
| Rig has moved and I had call about the mud on the location and the road.Neighbor was worried that the mud on the location would end up in the creek. I advised that there was a siltfence in place for that so it would no occur .I also advised that I would be on site today and would make sure there was not a problem.Check site and found that everything was just fine no run off problems .
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 1900723351
 
| 1900723351
 
| 2009-09-16
 
| 2009-09-16
|
+
|  
 
| Check on site and found that it is being built and rig should move on in two days.Site still needs a lot of work and most likely will not be ready.
 
| Check on site and found that it is being built and rig should move on in two days.Site still needs a lot of work and most likely will not be ready.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1926760370
 
| 1926760370
 
| 2009-09-22
 
| 2009-09-22
|
+
|  
 
| G & H Drilling set 421 ft 8 5/8 casing c/w 150 sks Uninversal -
 
| G & H Drilling set 421 ft 8 5/8 casing c/w 150 sks Uninversal -
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 2033721656
 
| 2033721656
 
| 2010-04-19
 
| 2010-04-19
|
+
|  
 
| Primary restoration has been done.
 
| Primary restoration has been done.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 2126140642
 
| 2126140642
 
| 2013-11-20
 
| 2013-11-20
|
+
|  
 
| This is a plinger lift well.  No apparent problems atr this time.
 
| This is a plinger lift well.  No apparent problems atr this time.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 962807371
 
| 962807371
 
| 2009-09-23
 
| 2009-09-23
|
+
|  
 
| G & H Drilling is dusting on 7 7/8 hole BOP in place - Pit liners are in place and level is good.
 
| G & H Drilling is dusting on 7 7/8 hole BOP in place - Pit liners are in place and level is good.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 01:57, 15 July 2015

Well Details

Well ID: 34-169-25644
Loading map...
County: Wayne
Municipality:
Operator Name: INDUSTRY STANDARD SUPPLIES INC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2009-09-21
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 40.67472418
Longitude: -81.86365974

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2009-0 0.0 0.0
2010-0 5506.0 1612.0
2012-0 6319.0 475.0
2013-0 2953.0 310.0
2014-0 2177.0 365.0 107.0 365.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1066772294 2009-09-21 Arrive to dig pits in Floodplain area and put pit up on the hill away from problems and most likely out of the floodplain.Rig also moving in to drill today.
109027388 2009-09-28 Rig has moved and I had call about the mud on the location and the road.Neighbor was worried that the mud on the location would end up in the creek. I advised that there was a siltfence in place for that so it would no occur .I also advised that I would be on site today and would make sure there was not a problem.Check site and found that everything was just fine no run off problems .
-132218536 2009-09-18 Met dozer operator on site and review site to be constructed for HB278 well.
-1695089873 2013-01-24 This is a producing plunger lift well. There were no problems noted at the time of the inspection.
1900723351 2009-09-16 Check on site and found that it is being built and rig should move on in two days.Site still needs a lot of work and most likely will not be ready.
1926760370 2009-09-22 G & H Drilling set 421 ft 8 5/8 casing c/w 150 sks Uninversal -
2033721656 2010-04-19 Primary restoration has been done.
2126140642 2013-11-20 This is a plinger lift well. No apparent problems atr this time.
962807371 2009-09-23 G & H Drilling is dusting on 7 7/8 hole BOP in place - Pit liners are in place and level is good.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.