If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Trumbull_County,_Ohio|Trumbull]] | | County: [[Trumbull_County,_Ohio|Trumbull]] | ||
|- | |- | ||
− | | Municipality: | + | | Municipality: Lordstown Township |
|- | |- | ||
| Operator Name: [[ERIC PETROLEUM CORP]] | | Operator Name: [[ERIC PETROLEUM CORP]] | ||
Line 21: | Line 21: | ||
| License Status: Producing | | License Status: Producing | ||
|- | |- | ||
− | | License Date: 1988- | + | | License Date: 1988-11-28 |
|- | |- | ||
| Spud Date: 1988-11-28 | | Spud Date: 1988-11-28 |
Well ID: 34-155-23224 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.175588587,"lon":-80.89551542,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Lordstown Township | |
Operator Name: ERIC PETROLEUM CORP | |
Well Pad ID: | |
Farm/Lease Name: HOWDERSHELT EARNEST | |
License Status: Producing | |
License Date: 1988-11-28 | |
Spud Date: 1988-11-28 | |
Spud Drilling Contractor: CUBBY DRLG | |
Final Drill Date: 1988-12-02 | |
Well Total Depth: 4753 ft | |
Configuration: Vertical | |
Latitude: 41.175588587 | |
Longitude: -80.89551542 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1988-09-15 | Issued Date 9/15/88 Expired Date 9/15/89 Acres 0140000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000 |
CO | 1988-11-28 | 2936 COLUMBIA NATURAL RES INC GeoDate 11/28/88 |
Oil and Gas | 1988-11-28 | Issued Date 9/15/88 Expired Date 9/15/89 Acres 0140000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 04753 Proposed Drill Depth 04753 |
Original Spud | 1988-11-28 | R.L. 12-3-88 |
Completed | 1988-12-02 | R.L. 12-3-88 |
Reached Total Depth | 1988-12-02 | R.L. 12-3-88 |
CO | 1989-01-25 | 2936 COLUMBIA NATURAL RES INC GeoDate 9/15/88 |
Completion Report Received | 1989-02-27 | R.L. 12-3-88 |
Construction Permit Expires | 1989-09-15 | R.L. 12-3-88 |
Change of Owner | 2010-10-27 | Operator changed from 2936, CHESAPEAKE APPALACHIA LLC to 5054, ERIC PETROLEUM CORP |
Record Last Modified | 2017-02-15 | R.L. 12-3-88 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 4452 | 4595 | 0 |
2006-09-11 | 4473 | 4477 | 13 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 15 | 750 Gal | 0 | FRAC:SAND/WATER |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1688623072 | 2013-10-29 | UrbanProduction Wells | No Violations | My inspection found the well in production. The well was equipped with a plunger lift unit. The tank battery consisted of a 100 barrel production tank, a short, 50 barrel brine tank, and a separator. Wooden post and wire fences surrounded all of the production equipment. The proper identification sign was posted. There was a 7 day production chart on the flow line coming near the separator. There was a plug on the load line. The lease road was in good condition with a locked gate at the entrance. The well was placed into production prior to House Bill 278. |
For data sources see[9]