Well Details

Well ID: 37-063-37137
Loading map...
County: Indiana
Municipality: Center Township
Operator Name: XTO ENERGY INC
Well Pad ID: 148497
Farm/Lease Name: HCPP A 8H
First Permit Date: 2011-06-23
Last Permit Date: 2011-06-23
Spud Date: 2011-10-23
Unconventional: Yes
Horizontal: Yes
Producing: Yes
Violations: None
Latitude: 40.524561
Longitude: -79.19808

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1995773 2011-08-10 No Violations Noted
2005240 2011-09-20 No Violations Noted ID PRESENT. SURFACE SET, NOT YET COMPLETED. NO ACCELERATES ES NOTED. NO VIOLATIONS NOTED. ACCOMPANIED BY OGI RICK HOOVER
2005601 2011-09-20 No Violations Noted
2011033 2011-10-12 No Violations Noted
2015121 2011-10-28 No Violations Noted
2015141 2011-10-25 No Violations Noted
2016282 2011-11-02 No Violations Noted At the time of inspection, Site ID sign, ESCGP-1, ES Plan, and PPC plan present, but recommend operator replace all and place in ziploc bag(or another waterproof measures) as documents located onsite are wet. Access road and pad adequately rocked. Secondary containment located on pad beneath rig. UDI 61 Rig currently drilling 8H. No pits onsite, tanks utilized for drilling operations. Closed loop system being utilized, operator plans to remove all wastes (including cuttings) from site and transport to approved facility. Wood chips are being mixed with cuttings prior to final disposal. No IW or accelerated ES issues noted onsite. Bmp's installed and functioning properly. Operator should continue to monitor and maintain all BMPS until final restoration achieved. Company man informed department that area behind well pad is not related to drilling activities, but rather HCPP.
2016916 2011-11-03 No Violations Noted
2020685 2011-11-16 No Violations Noted
2040023 2012-01-30 No Violations Noted Inspection result of notification from Stephen Smith of Xto at 930 of possible ES concerns with hillside stability along power plant road.

During inspection well drilled, rig off site. Sign ES plan, Escp-1 and PPC plan onsite.

Three tanks onsite surrounded by temporary containment. Pad lined with temp containment, actively being disposed of. Production equipment actively being installed. The fill slope at the northern end of pad along power plant road appears to be sliding.

At the time of this inspection it does not appear that erosion has occurred outside LOD. Operator has contacted engineer and preliminary plans are to either install rock gabions and/or additional bmp's in order to aid in stabilization of slope. Vegetative matting previously installed also appears to have slid with material along fill slope. Road side ditches and culverts are going to be protected by bmp's in order to prevent a possible pollution event.

2041947 2012-02-02 No Violations Noted Follow up Inspection result of notification from Stephen Smith of XTO ON 1/30/12 (and inspection) of possible ES concerns with slope stability along power plant road. Field meeting conducted to review written response addressing the slope instability with myself, WQS Marc Maestra, Rick Palmer, and XTO reps Stephen Smith, Dan Rice, as well as XTO's engineer During this meeting department noted that slope has moved slightly from 1/30/12 inspection. Although it appears that fill material is sliding down northern slope of pad near power plant RD, there again does not appear to be evidence of accelerated erosion and/or sedimentation issues outside of LOD at this time. Location of hillside failure is located near well heads and there is some distance (exacts not avaliable. ~100ft +) btw production equipment and location. Therefore, at this time XTO nor department feel that production equipment will be impacted by the slide and/or remediation efforts. A minor modification to ESCGP-1 shall be submitted to SWRO XTO agreeded to notifiy us at start of work
2045595 2012-02-23 No Violations Noted Follow up Inspection to examine remediation measures ongoing to address pad slope failure at multi well pad.

During this inspection construction crews actively addressing slope failure. (1) Two sections of large compost sox, culvert pipe and rock outlet (2) Slope was being cut back to reduce grade (3) a rock wall being placed at toe of slope to prevent further slide. Construction crews onsite were planning to have slope regraded by end of today.

Department will follow up early next week to examine completion of restoration/stabilization activities

2045806 2012-02-27 No Violations Noted ollow up Inspection to examine remediation measures ongoing to address pad slope failure at multi well pad. At the time of today’s inspection, it appears operator has completed earth disturbance work related to the remediation of slope failure. The slope appears to have been re-grade and tapered to a 2:1 and 3:1 slope. In addition to a rocked lined ditch, swale, diversion pipe, and compos sox; operator installed erosion control mats over slope. Operator plans to seed/mulch areas this week. According to XTO rep Stephen Smith, the construction sequence outlined on January 30, 2012 was followed, except for the installation of a gabion wall. AT this time the operator feels that a gabion wall is not necessary, but operator will continue to closely monitoring the area and if any additional movement is noted a gabion wall will be installed. During inspection, no accelerated ES issues were noted on pad or access road. Department will conduct a follow up inspection to ensure slope failure has been successfully controlled/corrected.
2046708 2012-02-27 No Violations Noted
2059518 2012-04-10 No Violations Noted
2061701 2012-04-16 In Compliance with Policy Administrative Inspection- Result of report of incident/release at homer city power plant unit A location on 4/8/12 (see attached). Based on operator respsone it appears that spill was properly handled accoridng to existing policy. Department reccomends that operator conitnue to closely mointor and maintain all bmp's and containment areas to ensure adequate preventative measures are maintained. A follow up site inspection will be conducted to ensure that distrubed areas are properly restored.
2088619 2012-08-01 No Violations Noted Routine inspection. At the time of this inspection, multi-well pad site ID signs, ES plan, and ESCGP-1 present. Department unable to locate drililng permits.

Well (8H) drilled and equipped for prodcution, no activity onsite during inspection. TD 11/26/11. Access road stable. Pad adequately rocked an maintained. No accelerated erosion or sedimeantion issues noted. Previously repaired slope failure has been permaently stabilized and revegetatived--compost sock(s) installed down gradient in order to perevent a possible pollution event if slide would reoccur- no ES concerns exist at time of this inspection. Site has been temporarily stabilized, operator has intention of drilling several more wells on property, to date permits have been obtained for 7H and 9H. Four MEI boxes located onsite, along with two roll off boxes. All appear sound. Four brine tanks and prodcuiton equipment located onsite within lined metal containment. No IW leaks or discharges noted.

2109574 2012-10-16 No Violations Noted At the time of this inspection, multi-well pad site ID signs, ES plan, and ESCGP-1 present.

Well (8H) drilled and equipped for prodcution, no activity onsite during inspection. TD 11/26/11. Access road stable. Pad adequately rocked an maintained. No accelerated erosion or sedimeantion issues noted. Previously repaired slope failure has been permaently stabilized and revegetatived--compost sock(s) installed down gradient in order to perevent a possible pollution event if slide would reoccur- no ES concerns exist at time of this inspection. Temporary soil piles secured with vegetative matting, although recommend operator maintain as some sections of matting have become lose. Site has been temporarily stabilized, operator has intention of drilling several more wells on property, to date permits have been obtained for 7H and 9H; therefore site has not yet been restored to PCSM plan. Four brine tanks and prodcuiton equipment located onsite within lined metal containment. No IW leaks or discharges noted.

2136126 2013-01-31 No Violations Noted Routine inspection. At the time of this inspection, multi-well pad site ID signs, ES plan, and ESCGP-1 present.

Well (8H) drilled and equipped for production, no activity onsite during inspection. TD 11/26/11.

Access road stable. Pad adequately rocked an maintained. No accelerated erosion or sedimentation issues noted. Former area of slope failure has been adquately restored with successsful vegetative growth. Observed that operator still has flowback line in place under HCPP roadway. Site has been temporarily stabilized, operator has intention of drilling several more wells on property, to date valid permits exists for 7H and 9H but drilling has not yet commenced; therefore, site has not yet been restored to PCSM plan. Four brine tanks and production equipment located onsite within lined metal containment. No IW leaks or discharges noted.

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2011-2 FRACING FLUID WASTE 322.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185 RESERVED ENVIRONMENTAL SERVICES MOUNT PLEASANT PA