If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0014171016000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.025853,"lon":-112.193588,"icon":""}]} |
Location: 00/16-10-001-17W4/0 | |
Location Alias: 00/16-10-01-17 W4M | |
Location Alias 2: 00/16-10-001-17 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 001 | |
Meridian: 4 | |
Range: 17 | |
Section: 10 | |
County/Municipality: County of Warner No. 5 | |
Well Name: CPEC COUTTS 16-10-1-17 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0169753 | |
License Date: 1994-08-22 | |
License Status: Issued | |
Spud Date: 1995-08-17 | |
Final Drill Date: 1995-08-21 | |
Well Total Depth: 965.00 m | |
Surface Hole Latitude: 49.025853 | |
Surface Hole Longitude: -112.193588 |
Date | Event |
---|---|
1994-08-22 | Obtained License |
1995-08-18 | Surface Casing Operation Performed |
1995-08-19 | Direction Drilling Operation Performed - Deviate |
1995-08-21 | Finished Drilling |
1995-08-21 | Well Log Performed |
1995-08-21 | Well Mode changed to Drilled and Cased |
1995-08-22 | Production Casing Operation Performed |
1995-08-22 | Rig Released |
1995-08-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-08-25 | Perforation Treatment Performed - Jet Perforation |
1995-08-25 | Plug Back Performed |
1995-08-26 | Perforation Treatment Performed - Jet Perforation |
1995-08-29 | Well Began Production |
1995-08-29 | Well Fluid changed to Crude Oil |
1995-08-29 | Well Mode changed to Pumping |
1995-09-15 | Well Log Performed |
1997-10-01 | Well Fluid changed to Crude Oil |
1997-10-01 | Well Mode changed to Suspended |
1999-10-01 | Well Fluid changed to Crude Oil |
1999-10-01 | Well Mode changed to Pumping |
2007-01-10 | Perforation Treatment Performed - Cement Squeeze |
2007-01-10 | Plug Back Performed |
2007-01-10 | Well Fluid changed to Crude Oil |
2007-01-10 | Well Mode changed to Abandoned Zone |
2007-01-20 | Perforation Treatment Performed - Jet Perforation |
2007-01-22 | Perforation Treatment Performed - Jet Perforation |
2007-01-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2007-10-04 | Perforation Treatment Performed - Jet Perforation |
2007-10-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1995-08-19 | 358.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1995-08-25 | Perforation | 918.00 | 923.00 | 13 |
2007-10-04 | Perforation | 923.00 | 927.00 | 17 |
2007-10-04 | Perforation | 935.00 | 944.10 | 17 |
2007-10-05 | Acid Treatment | 923.00 | 927.00 | 0 |
2007-10-05 | Acid Treatment | 935.00 | 944.10 | 0 |
1995-08-25 | Packing Device Capped w/Cement | 905.00 | 913.00 | 0 |
1995-08-25 | Perforation | 872.00 | 875.00 | 13 |
1995-08-26 | Perforation | 865.00 | 869.00 | 13 |
2007-01-10 | Cement Squeeze | 865.00 | 869.00 | 0 |
2007-01-10 | Cement Squeeze | 872.00 | 875.00 | 0 |
2007-01-20 | Perforation | 872.00 | 875.00 | 13 |
2007-01-22 | Perforation | 915.00 | 923.00 | 17 |
2007-01-23 | Acid Treatment | 915.00 | 923.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1995 | 2764 | 0.0 | 0.0 | 0.0 |
1996 | 6213 | 0.0 | 0.0 | 0.0 |
1999 | 2196 | 0.0 | 0.0 | 0.0 |
2000 | 8604 | 0.0 | 0.0 | 0.0 |
2001 | 8426 | 0.0 | 0.0 | 0.0 |
2002 | 7633 | 0.0 | 0.0 | 0.0 |
2003 | 7059 | 0.0 | 0.0 | 0.0 |
2004 | 6706 | 0.0 | 0.0 | 0.0 |
2005 | 5318 | 0.0 | 0.0 | 0.0 |
2006 | 6769 | 0.0 | 0.0 | 0.0 |
2007 | 120 | 0.0 | 0.0 | 0.0 |
For data sources see[6]