If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 129-28647 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.508125,"lon":-79.545813,"icon":""}]} |
County: Westmoreland | |
Municipality: Bell Township | |
Operator Name: CNX GAS CO LLC | |
First Permit Date: 2011-08-02 | |
Last Permit Date: 2011-08-02 | |
Spud Date: None | |
Unconventional: Yes | |
Horizontal: Yes | |
Violations: None | |
Latitude: 40.508125 | |
Longitude: -79.545813 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
2059495 | 2012-04-16 | No Violations Noted | Inspection in response to a SPUD notice received of Thursday April 12 2012. At the time of inspection the site was being constructed. The E&S plan was on site and was properly implemented. The site was temporary stabilized as outlined in the E&S Plan. The Department notes an unlined pit onsite at the time of inspection. No accelerated erosion observed in relation to the access road or well pad area at the time of the inspection. | |
2086918 | 2012-07-23 | No Violations Noted | At the time of inspection the well was drilled to the kickoff depth. The site appeared to be in sound condition. No accelerated or sedimentation observed in relation to the well pad or access road. The site has been temporarily stabilized and all BMP's appear to be properly installed and maintained. THE Department suggest the Operator continue to monitor the site on a weekly basis and after precipitation event to ensure E&S in not leaving the site. | |
2092854 | 2012-08-20 | No Violations Noted | At the time of inspection the well was drilled but not equipped for production. The well pad appeared to be in sound condition. No accelerated erosion or sedimentation observed. The pit located onsite appeared to in sound condition and had the required 2 feet of free board. The Department suggests the operator continue to monitor the site weekly and after precipitation events to ensure the stability of the site is retained. | |
2127551 | 2013-01-03 | No Violations Noted | At the time of inspection the well was drilled but not equipped for production. The well pad appeared to be in sound condition. No accelerated erosion or sedimentation observed. The pit located onsite appeared to in sound condition and had the required 2 feet of free board. The Department suggests the operator continue to monitor the site weekly and after precipitation events to ensure the stability of the site is retained. | |
2138177 | 2013-02-11 | No Violations Noted | no violations noted |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2011-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|