37-063-36101

Well Details

Well ID: 37-063-36101
Loading map...
County: Indiana
Municipality: Grant Township
Operator Name: CNX GAS CO LLC
Well Pad ID:
Farm/Lease Name: SCOTT W LAMER 4
First Permit Date: 2008-06-27
Last Permit Date: 2008-06-27
Spud Date: 2009-04-27
Unconventional: No
Horizontal: No
Well Status: ACTIVE
Violations: 0
Latitude: 40.748976
Longitude: -78.979589

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2008-0 0.0 0.0 0.0 0.0 0.0 0.0
2009-0 15241.8 365.0 0.0 0.0 0.0 0.0
2010-0 15007.0 365.0 0.0 0.0 0.0 0.0
2011-0 0.0 0.0 0.0 0.0 0.0 0.0
2011-0 12040.93 365.0 0.0 0.0 0.0 0.0
2012-0 6546.0 366.0 0.0 0.0 0.0 0.0
2013-0 4384.98 365.0 0.0 0.0 0.0 0.0
2014-0 2457.44 365.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2009-0 BRINE 160.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA
2009-0 BRINE 1.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2009-0 BRINE 25.0 Bbl INJECTION DISPOSAL WELL PAS2D902BCLE SPENCER LAND CO #2 DISP WELL (033-22059) CURWENSVILLE PA
2009-0 BRINE 82.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2009-0 FRACKING FLUID 1.0 Bbl OTHER 37-063-36058
2009-0 FRACKING FLUID 600.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA
2010-0 PRODUCED FLUID 888.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2011-0 PRODUCED FLUID 258.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2011-0 PRODUCED FLUID 318.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-099-23127 NORTHSTAR #1 YOUNGSTOWN OH
2011-0 PRODUCED FLUID 89.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2012-0 PRODUCED FLUID 91.82 Bbl INJECTION DISPOSAL WELL 34-013-20609 BUCKEYE UIC BARNESVILLE #1 (SWIW#2) BARNESVILLE OH
2012-0 PRODUCED FLUID 50.0 Bbl INJECTION DISPOSAL WELL 34-007-22038 PAROBEK #2 (SWIW #12) OH
2013-0 PRODUCED FLUID 132.98 Bbl INJECTION DISPOSAL WELL PAS2D912BSOM MORRIS H CRITCHFIELD F76 DISP WELL (111-20006) FRIEDENS PA
2014-0 PRODUCED FLUID 15.74 Bbl INJECTION DISPOSAL WELL 34-013-20609 BUCKEYE UIC BARNESVILLE #1 (SWIW#2) BARNESVILLE OH
2014-0 PRODUCED FLUID 80.0 Bbl INJECTION DISPOSAL WELL 34-155-23795 PANDER #1 (SWIW #15) NEWTON FALLS OH

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1795818 2009-05-01 No Violations Noted drilling complete - moving equipment/E&S ok/ID&pit ok
1797776 2009-05-13 No Violations Noted Site ID sign in place. E&S plan on site. Well tag in place. Well is equipped for production.

Site not backfilled yet. Tank sound. Dirt dike installed arouned tank. Access road ok. Site ok. No signs of accelerated erosion on site or access road. Lined pit appeared sound and had adequate freeboard. No erosion/sedimentation issues found. No violations found.

1925226 2010-10-27 No Violations Noted Drilling completed 4/30/09. Well tag in place. Well is equipped for production. Pump-jack installed.

Tank sound. Vegetated dirt dike installed around tank. Access road stabilized with no signs of accelerated erosion.

  • Majority of site is adequately stabilized with vegetation with the exception of one small area approximately 20'x20' adjacent to the tank
   and dike that is sparsely vegetated.  This area needs to be seeded/mulched to ensure the site is properly stabilized/restored.  No signs of 
   erosion found on site.  Spoke to operator representative Mike Gatsky about this concern.  Scheduled meeting on site for the following day.  

Temporary BMP's have been removed. No violations found. Final stabilization and restoration complete pending completion of the above.

1925231 2010-10-28 No Violations Noted Drilling completed 4/30/09. Well tag in place. Well equipped for production. Pump-jack installed. Tank sound. Access road ok.

Inspection conducted with operator representative Mike Gatsky to discuss compliance assistance inspection of 10/27/10. Mike will seed and mulch the small area adjacent to the tank and dike that is sparsely vegetated. Site is located on a flat, well vegetated field, therefore no E&S issues are foreseen before emerging vegetation is present. Will perform follow-up inspection at a later date to ensure stabilization/restoration is achieved. Final stabilization and restoration complete pending completion of the above.

1959191 2011-03-17 No Violations Noted Drilling completed 4/30/09. Well tag in place. Well equipped for production. Pump-jack installed.

Production fluids tank appeared sound. Vegetated dirt dike installed around tank. Access road stabilized, with no signs of accelerated erosion Sparsely vegetated area adjacent to tank has been seeded and mulched in response to compliance assistance inspection of 10/28/2010. This area should be monitored to ensure vegetation takes hold and final stabilization/restoration is achieved. Remainder of site is stabilized with adequate vegetation. No signs of accelerated erosion on site. No E&S issues found. No violations found. Site in compliance.

2364169 2015-04-14 No Violations Noted At time of inspection

For data sources see[3]

References