X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465110212000

Well Details

Well ID: 0465110212000
Loading map...
Location: 00/12-02-046-11W5/0
Location Alias: 00/12-02-46-11 W5M
Location Alias 2: 00/12-02-046-11 W5/00
Province: Alberta
County/Municipality: Brazeau County
Well Name: BELLATRIX HZ PEMBINA 12-2-46-11
Operator Name: Bellatrix Exploration Ltd.
License Number: 0445930
License Date: 2012-05-16
License Status: Amended
Spud Date: 2012-08-07
Final Drill Date: 2012-09-02
Well Total Depth: 5013.8 m
Surface Hole Latitude: 52.912719
Surface Hole Longitude: -115.499353

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
07 Aug 2012 Chinook Drilling Inc. 15 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-08-16 1624
2012-08-18 2197 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-09-20 Multi-Stage Fracture 4973 4973.1 0
2012-09-20 Multi-Stage Fracture 4872 4872.1 0
2012-09-20 Multi-Stage Fracture 4792.7 4792.8 0
2012-09-20 Multi-Stage Fracture 4712 4712.1 0
2012-09-20 Multi-Stage Fracture 4628.4 4628.5 0
2012-09-20 Multi-Stage Fracture 4555.7 4555.8 0
2012-09-20 Multi-Stage Fracture 4471.8 4471.9 0
2012-09-20 Multi-Stage Fracture 4386.4 4386.5 0
2012-09-20 Multi-Stage Fracture 4313.7 4313.8 0
2012-09-20 Multi-Stage Fracture 4229 4229.1 0
2012-09-20 Multi-Stage Fracture 4156.2 4156.3 0
2012-09-20 Multi-Stage Fracture 4065.4 4065.5 0
2012-09-20 Multi-Stage Fracture 3987.9 3988 0
2012-09-20 Multi-Stage Fracture 3908.4 3908.5 0
2012-09-20 Multi-Stage Fracture 3831.9 3832 0
2012-09-20 Multi-Stage Fracture 3755.1 3755.2 0
2012-09-20 Multi-Stage Fracture 3675.5 3675.6 0
2012-09-25 Multi-Stage Fracture 3586.6 3586.7 0
2012-09-25 Multi-Stage Fracture 3509.2 3509.3 0
2012-09-25 Multi-Stage Fracture 3426.5 3426.6 0
2012-09-25 Multi-Stage Fracture 3341.5 3341.6 0
2012-09-25 Multi-Stage Fracture 3268.2 3268.3 0
2012-09-25 Multi-Stage Fracture 3187.4 3187.5 0
2012-09-25 Multi-Stage Fracture 3107.2 3107.3 0
2012-09-25 Multi-Stage Fracture 3026.5 3026.6 0
2012-09-25 Multi-Stage Fracture 2945.2 2945.3 0
2012-09-25 Multi-Stage Fracture 2863.9 2864 0
2012-09-25 Multi-Stage Fracture 2782.3 2782.4 0
2012-09-25 Multi-Stage Fracture 2699.8 2699.9 0
2012-09-25 Multi-Stage Fracture 2618.5 2618.6 0
2012-09-25 Multi-Stage Fracture 2537.4 2537.5 0
2012-09-25 Multi-Stage Fracture 2468.1 2468.2 0
2012-09-25 Multi-Stage Fracture 2386.8 2386.9 0
2012-09-25 Multi-Stage Fracture 2304.3 2304.4 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2315 4057.1 0.0 0.0
2013 8029 6577.9 0.0 0.0
2014 8601 3678.0 0.0 0.0
2015 8735 2619.2 0.0 0.0
2016 8783 2319.7 0.0 88.6
2017 7934 1778.2 0.0 85.5
2018 8537 1341.9 0.0 14.4
2019 2142 275.2 0.0 5.6

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-09-11 No Incident N/A N/A
2012-09-27 No Incident N/A N/A

For data sources see[7]

References