37-005-31289

Well Details

Well ID: 37-005-31289
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: South Buffalo Township
Operator Name: SNYDER BROS INC
Well Pad ID: 154284
Farm/Lease Name: NEUMANN 2H
License Status: Active
Spud Date: 07/05/2018
Permit Date: 8/2/2017
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.708908
Longitude: -79.626661

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 SNYDER BROS INC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2018-08 Drill Cuttings (in Tons) RWC 810 562.84 Tons LANDFILL 100585
2018-10 Produced Fluid (in Barrels) RWC 802 100.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018-11 Drilling Fluid Waste (in Barrels) RWC 803 16.88 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018-11 Produced Fluid (in Tons) RWC 802 524.12 Tons LANDFILL 100585
2019-02 Synthetic Liner Materials (in Tons) RWC 806 5.85 Tons LANDFILL 100280

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2749901 Primary Facility 2018-07-09 Routine/Complete Inspection No Violations Noted Inspection conducted in response to electronic spud notification scheduled for 7/5/18 for well 2H.

At time of inspection, auger rig on-site. Wells 1H, 2H, 3H, 4H, 5H, and 6H have been spudded. Wells 7H and 8H to be spudded today.

2750673 Primary Facility 2018-07-11 Drilling/Alteration No Violations Noted This well was spudded on 7/6/2018. The cellar is 6'X6'. The conductor hole was drilled to 42' and has 42' of 30" pipe installed and cemented to surface. The well has been covered with a steel plate for safety until the top hole Rig arrives.
2759318 Primary Facility 2018-08-02 Drilling/Alteration No Violations Noted This well was spudded on 7/6/2018. The cellar is 6'X6'. The conductor hole was drilled to 42' and has 42' of 30" pipe installed and cemented to surface.

On this date, the drIlling rig was drilling at 346'. All equipment on site looked ok.

2793607 Primary Facility 2018-10-24 Drilling/Alteration No Violations Noted On this return date, the Patterson Finishing Rig is moving on the well pad and setting up to resume drilling the final lateral leg of this well and the rest of the 8 wells on this pad. The drillers log and permit copies are on site and all equipment looks ok.
2802736 Primary Facility 2018-11-13 Routine/Complete Inspection No Violations Noted Present during inspection is operator rep Rod Bennett.

According to Department records, this well was spud on 7-5-18. At time of inspection drilling actively taking place on this well (2H). According to Mr. Bennett, wells 3H and 4H have been drilled and cemented and drilling will begin on well 1H next week. Mr. Bennett also states that operator intends to drill wells 5H, 6H, 7H, and 8H on this pad.

2803950 Primary Facility 2018-11-16 Drilling/Alteration No Violations Noted On this return date, the Patterson Finishing Rig is moving on the well pad and setting up to resume drilling the final lateral leg of this well and the rest of the 8 wells on this pad. The drillers log and permit copies are on site and all equipment looks ok.

On this return date the finishing rig has TD'd the hole at 13,374 feet and was circulating and conditioning the hole prior to tripping out and running casing. The plan is to cement the 5 1/2" casing on the following day. The rig will be skidding over to the 1H well next.

For data sources see[6]

References