37-115-20229

Well Details

Well ID: 37-115-20229
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Springville Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 147527
Farm/Lease Name: TEEL UNIT 3H
License Status: Active
Spud Date: 2010-01-07
Permit Date: 2009-10-05
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.700828
Longitude: -75.889817

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 0.00 0 0.00 0 0.00 0
2010 CHIEF OIL & GAS LLC 1,550,927.00 193 0.00 0 0.00 0
2011 CHIEF OIL & GAS LLC 1,483,965.00 337 0.00 0 0.00 0
2012 CHIEF OIL & GAS LLC 752,752.79 363 0.00 0 0.00 0
2013 CHIEF OIL & GAS LLC 708,192.00 358 0.00 0 0.00 0
2014 CHIEF OIL & GAS LLC 828,791.00 364 0.00 0 0.00 0
2015 CHIEF OIL & GAS LLC 432,611.69 353 0.00 0 0.00 0
2016 CHIEF OIL & GAS LLC 566,787.57 365 0.00 0 0.00 0
2017 CHIEF OIL & GAS LLC 399,276.28 342 0.00 0 0.00 0
2018 CHIEF OIL & GAS LLC 322,760.19 364 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 122,497.33 90 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2010-S02 Drilling Fluid Waste (in Barrels) 1,682.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2010-S02 Drilling Fluid Waste (in Barrels) 2,584.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2010-S02 Fracing Fluid Waste (in Barrels) 1,633.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2010-S02 Produced Fluid (in Barrels) 643.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2011-S01 Fracing Fluid Waste (in Barrels) 509.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2012-S01 Produced Fluid (in Barrels) 332.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012-S02 Produced Fluid (in Barrels) 153.70 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S01 Produced Fluid (in Barrels) 82.10 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S02 Produced Fluid (in Barrels) 232.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S01 Produced Fluid (in Barrels) 110.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2014-S01 Produced Fluid (in Barrels) 216.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S02 Fracing Fluid Waste (in Barrels) 120.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015-S01 Produced Fluid (in Barrels) 147.43 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S02 Produced Fluid (in Barrels) 108.66 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S01 Produced Fluid (in Barrels) RWC 802 307.59 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S02 Produced Fluid (in Barrels) RWC 802 236.13 Bbl REUSE OTHER THAN ROAD SPREADING
2017-M01 Produced Fluid (in Barrels) RWC 802 4.09 Bbl REUSE (AT WELL PAD)
2017-M04 Produced Fluid (in Barrels) RWC 802 224.05 Bbl REUSE (AT WELL PAD)
2017-M05 Produced Fluid (in Barrels) RWC 802 64.18 Bbl REUSE (AT WELL PAD)
2017-M08 Produced Fluid (in Barrels) RWC 802 66.53 Bbl REUSE (AT WELL PAD)
2017-M11 Produced Fluid (in Barrels) RWC 802 84.03 Bbl REUSE (AT WELL PAD)
2018-M06 Produced Fluid (in Barrels) RWC 802 17.50 Bbl REUSE (AT WELL PAD)
2019-M01 Produced Fluid (in Barrels) RWC 802 57.27 Bbl REUSE (AT WELL PAD)
2019-M03 Produced Fluid (in Barrels) RWC 802 49.35 Bbl REUSE (AT WELL PAD)

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1852641 Primary Facility 2009-11-18 Routine/Complete Inspection No Violations Noted
1863072 Primary Facility 2010-02-05 Drilling/Alteration Violation(s) Noted Drilling long string. depth at 6161'. Drillers log not filled out up to date. Only filled out to depth of surface casing.
1895955 Primary Facility 2010-06-30 Routine/Complete Inspection Violation(s) Noted No activity on site. Reserve pit still present. Fence around pit needs repair. Four 55-gallon steel drums on southern portion of pad. One drum leaking onto ground. Drums labeled gear oil. Violation cited for unpermitted discharge of industrial waste to ground. Also noted poly tanks lined along pad
1899611 Primary Facility 2010-07-21 Follow-up Inspection Outstanding Violations - No Viols Req'd : I arrived on site at approximately 8:00 am. At the time of inspection, there was no activity on site. The purpose of the inspection was to follow up on violations observed during an inspection completed on June 30, 2010. Based on my inspection, I observed the following: the four drums (including the leaking drum) of gear oil have been removed; the two drums labeled non-regulated waste have been removed; and the poly totes that were along the edge of the pad have also been removed from the site. Upon inspection of the ground surface in the area where the leaking drum was located, there is evidence of impacted soil still present. Remediation of this area which included removal of impacted soils is still required.
2436742 Primary Facility 2015-12-30 Routine/Complete Inspection No Violations Noted The Department was on site to conduct a Notice of Termination (NOT) inspection of the Teel 3H well pad (ESX09-115-0012(01)).

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1863072 581257 02/05/2010 2010-02-05 78.122 - Drillers Log not on site Administrative drillers log on site, but not filled out properly and not being kept up to date
1895955 590690 06/30/2010 2010-06-30 401 CSL - Discharge of pollultional material to waters of Commonwealth. Environmental Health & Safety

For data sources see[6]

References