37-063-36514

Well Details

Well ID: 37-063-36514
Loading map...
Operator Name: XTO ENERGY INC
First Permit Date: 2009-04-21
Last Permit Date: 2009-04-21
Spud Date: 2009-11-16
Unconventional: No
Horizontal: No
Violations: 2
Latitude: 40.475051
Longitude: -79.279241

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 12796.0 365.0 0.0 0.0 0.0 0.0
2012-0 8827.0 366.0 0.0 0.0 0.0 0.0
2011-0 4110.0 319.0 0.0 0.0 0.0 0.0
2010-0 2696.0 257.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1828175 2009-09-10 No Violations Noted According to records, well permit issued on 4/21/09. Site pad completed. Two pits completed not aligned with plastic. Based on site conditions, no indication of IW issues at the site. Well sign and E&S plan located at entrance way of site pad. No E&S issues at the site. Well marked with survey marker.
1845228 2009-11-19 No Violations Noted Based on records, permit approved on 4/21/09. Rig set on well. No drilling occurred at the time of inspection. Pit containing 20 mil plastic. No freeboard issues. Based on site conditions, no indication of IW issues at the site. Well sign and E&S plan present. No E&S issues at the site. Filter fence located on down gradient side of pad.
1849643 2009-12-03 Violation(s) Noted At the time of inspection, well was drilled but not yet in production. The site was properly signed with E&S plan. No accelerated E&S issues were observed on well site or access road, but it is recommended operator continue to closely monitor all BMPs (filter fence and access road drainage) until final restoration activities are completed. Filter fabric fence was installed on the below gradient perimeter of well pad. Observed three pits on site, two lined, one of which contained frac fluids and cuttings and one unlined (empty). One pit (frac pit) exceeded the limits of the 2ft freeboard and as a result industrial waste(s) (cuttings) were discharged on the ground surrounding the pit; therefore, violations will be issued. Again, operator needs to closely monitor pit freeboard levels and BMPs until final restoration activities have been completed. 577745
1849643 2009-12-03 Violation(s) Noted At the time of inspection, well was drilled but not yet in production. The site was properly signed with E&S plan. No accelerated E&S issues were observed on well site or access road, but it is recommended operator continue to closely monitor all BMPs (filter fence and access road drainage) until final restoration activities are completed. Filter fabric fence was installed on the below gradient perimeter of well pad. Observed three pits on site, two lined, one of which contained frac fluids and cuttings and one unlined (empty). One pit (frac pit) exceeded the limits of the 2ft freeboard and as a result industrial waste(s) (cuttings) were discharged on the ground surrounding the pit; therefore, violations will be issued. Again, operator needs to closely monitor pit freeboard levels and BMPs until final restoration activities have been completed. 577746
1930540 2010-11-22 No Violations Noted At the time of inspection, well tag present site permanently restored.

Observe >70% uniform vegetative cover, area surrounding well reclaimed to preexisting farm land. No accelerated erosion or sedimentation issues with site or access road. Brine tank stable.

References