If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-30405 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.843161,"lon":-79.254203,"icon":""}]} |
Operator Name: XTO ENERGY INC | |
First Permit Date: 2009-07-08 | |
Last Permit Date: 2009-07-08 | |
Spud Date: 2010-04-08 | |
Unconventional: No | |
Horizontal: No | |
Violations: None | |
Latitude: 40.843161 | |
Longitude: -79.254203 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-0 | 6393.0 | 359.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-0 | 10258.0 | 366.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 8338.0 | 345.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-0 | 4178.0 | 242.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2010-0 | PRODUCED FLUID | 41.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAR000519462 | ADVANCED WASTE SERVICES OF PA (NEW CASTLE) | NEW CASTLE | PA |
2010-0 | PRODUCED FLUID | 6.0 | Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026310 | CLEARFIELD MUNICIPAL SEWAGE TREATMENT PLANT | CLEARFIELD | PA |
2010-0 | PRODUCED FLUID | 5.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE | CREEKSIDE | PA |
2010-0 | PRODUCED FLUID | 1.0 | Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026034 | JOHNSTOWN SEWAGE TREATMENT PLANT | JOHNSTOWN | PA |
2010-0 | PRODUCED FLUID | 6.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |
2010-0 | PRODUCED FLUID | 1.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0020346 | PUNXSUTAWNEY BORO STP | PUNXSUTAWNEY | PA |
2010-0 | PRODUCED FLUID | 2.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
2013-0 | PRODUCED FLUID | 47.0 | Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 | PUNXSUTAWNEY BORO SEWAGE TREATMENT PLANT | PUNXSUTAWNEY | PA |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1877346 | 2010-04-14 | No Violations Noted | Drilling appeared to have been completed at the time of the inspection. Below grade pits located onsite and both had more than the required two feet of freeboard. Observed no accelerated erosion & sedimentation with respect to the access road or well-site. Noted that the silt fencing had been installed across an existing swale at the bottom of the disturbed area for the well pad construction. Installed in the manner the silt fencing will not function properly. A collection ditch stabilized with rock or erosion control matting with a small sediment trap at the outlet would have been a more effective erosion control BMP. |