34-029-21805

Well Details

Well ID: 34-029-21805
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-09-04
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 40.7490147346
Longitude: -80.9022153376

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-2143033912 2013-04-17 I went to the site and conducted a pre-construction site inspection with Steve Ault, Chesapeake Field Representative.
-553059832 2013-11-14
-836266621 2013-11-08
1316569684 2013-09-05 I witnessed the cementing of the conductor casing. Express Energy Services drilled a 26" diameter hole to 120'. Express installed 120' of 20" OD casing. During drilling, the borehole got damp at an approximate depth of 80', but did not produce much water. Allied Oil & Gas Services was the cementing contractor. The cement slurry was mudscaled at 15.6 pounds per gallon (ppg). Allied pumped 52.4 bbls of cement slurry at 15.6 ppg. The cement was displaced with 39 bbls of water. An estimated 15 bbls of cement slurry returned to surface. Displacement was completed at 1:28pm.
1384272283 2013-11-04
1406728058 2014-05-20 I stopped by the site to check on the status of well completion and restoration. The well has been hydraulically fractured. At this time a work over rig is installing 2-7/8 tubing. Production equipment is on site but not hooked up. I didnot walk the entire site due to the active. All erosion and sedimentation controls, and drainage controls appear to be functioning. Ground cover is well established along the access road and around the drilling pad. No areas of erosion are present. Preliminary restoration approval will not be finalized pending installation of production equipment.
1813027455 2013-09-03 I stopped at the drilling pad to check on the conductor rig move-in progress. I found pipe trucks from Express Energy Services on site. Express personnel told me that the rig was expected shortly.
225811777 2013-11-06
611148086 2013-07-23 I went to the site to review the construction process of the drilling pad. The access road is complete. The road has a crushed limestone surface, and erosion controls are in place. The area of disturbance is seeded and covered with straw. There is a gate with a padlock at the access road entrance. The pad is complete. There is a berm and a chain link fence surrounding the site. There is a padlocked gate in the fence. The area of disturbance and the soil stockpiles have been stabilized. There are two cellars installed at the pad denoted as the Judy Brown 3H and 6H. Each is surrounded by a bull fence to prevent falls. Additionally, two site drains to control precipitation on the pad have been installed.
905550400 2013-11-04