34-059-24206

Well Details

Well ID: 34-059-24206
Loading map...
County: Guernsey
Municipality:
Operator Name: GULFPORT ENERGY CORPORATION
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2012-04-16
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 40.11085432
Longitude: -81.37055544

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-0 0.0 5231.0
2013-12 50286.0 13650.0
2013-6 29224.0 8305.0
2013-9 27224.0 7592.0
2014-3 25175.0 91.0 5477.0 91.0
2014-1 31891.0 82.0 8246.0 82.0
2014-2 26692.0 88.0 6548.0 88.0
2014-4 18756.0 81.0 5162.0 81.0
2015-1 18863.0 78.0 4034.0 78.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1068032420 2013-04-08 On the day of my inspection I found the flow back operation has been completed, all the valves are open at the well head, there are (6) two hundred ten barrel production tanks setting inside a containment dike, the I.D. is posted at the entry way.
-1185960331 2012-04-20 Stopped by drill site for update they were working on rig they expect to be back up and running later today, depth at this point was 1872'.
-1273264580 2012-06-21 Stopped by drill site for update on upcoming frac job they were rigging up Producers Services to start frac process later this evening.
1334364184 2012-04-13 On site to meet with company reps to discuss drilling operations and safety issues that may arise while drilling this well we talked about potential H2S encounters in area and if encountered what would be done to protect public .
1334791737 2012-04-18 On site to witness BOP testing they tested annular @1500 psi for 10 min. with no decline in pressure and choke system @1500 psi with no decline and TIW Valve @1500 psi with no decline and upper and lower safety valves @1500 psi with no decline testing was performed by B&B Oilfield Equipment Corp.

Note: 5000# system in place on this string of casing.

1335300117 2012-04-24 Drilling 12.250' hole@4650' should be running 9.625 later this week.
1336689808 2012-05-10 Drilling@6600'cutting lateral.
1337213313 2012-05-16 T.D.@12,501 CONDITIONING WELLBORE SHOULD BE RUNNING PRODUCTION CASING LATE TOMORROW NIGHT.
-1341937257 2012-04-05 HAD Drilling on site to set conductor pipe and mouse hole they will set approximately 100' of 20 casing and drill and set mouse hole.
-1689482446 2012-06-11 Halliburton on site getting ready to perforate toe of lateral and Producers Well Service will perform frac job on said well.
-1934910757 2013-03-27 Inspection revealed that well is not on line at this time they are waiting on gas line to be installed and restoration work at site is complete.

Note: There is 6-210 bbl tanks within lined and diked area.

-2016805765 2014-05-29 On the day of my inspection the site passed preliminary restoration according to 1509.072A.
-249892795 2012-04-09 Inspection revealed that HAD Drilling set 100' of 20 casing and set mouse hole and then moved off site, company rep stated that Union Drilling would be moving in on site later this week.
435659165 2012-05-14 Drilling lateral@10,200' should be done drilling within the next couple days.
585434501 2012-04-16 Stopped by drill site to check on status of rig they were preparing to start drilling out from under conductor pipe which was set@117'.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.