Well ID: 34-059-24206 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.11085432,"lon":-81.37055544,"icon":""}]} |
County: Guernsey | |
Municipality: | |
Operator Name: GULFPORT ENERGY CORPORATION | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2012-04-16 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 40.11085432 | |
Longitude: -81.37055544 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-0 | 0.0 | 5231.0 | ||||
2013-12 | 50286.0 | 13650.0 | ||||
2013-6 | 29224.0 | 8305.0 | ||||
2013-9 | 27224.0 | 7592.0 | ||||
2014-3 | 25175.0 | 91.0 | 5477.0 | 91.0 | ||
2014-1 | 31891.0 | 82.0 | 8246.0 | 82.0 | ||
2014-2 | 26692.0 | 88.0 | 6548.0 | 88.0 | ||
2014-4 | 18756.0 | 81.0 | 5162.0 | 81.0 | ||
2015-1 | 18863.0 | 78.0 | 4034.0 | 78.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1068032420 | 2013-04-08 | On the day of my inspection I found the flow back operation has been completed, all the valves are open at the well head, there are (6) two hundred ten barrel production tanks setting inside a containment dike, the I.D. is posted at the entry way. | ||||
-1185960331 | 2012-04-20 | Stopped by drill site for update they were working on rig they expect to be back up and running later today, depth at this point was 1872'. | ||||
-1273264580 | 2012-06-21 | Stopped by drill site for update on upcoming frac job they were rigging up Producers Services to start frac process later this evening. | ||||
1334364184 | 2012-04-13 | On site to meet with company reps to discuss drilling operations and safety issues that may arise while drilling this well we talked about potential H2S encounters in area and if encountered what would be done to protect public . | ||||
1334791737 | 2012-04-18 | On site to witness BOP testing they tested annular @1500 psi for 10 min. with no decline in pressure and choke system @1500 psi with no decline and TIW Valve @1500 psi with no decline and upper and lower safety valves @1500 psi with no decline testing was performed by B&B Oilfield Equipment Corp.
Note: 5000# system in place on this string of casing. |
||||
1335300117 | 2012-04-24 | Drilling 12.250' hole@4650' should be running 9.625 later this week. | ||||
1336689808 | 2012-05-10 | Drilling@6600'cutting lateral. | ||||
1337213313 | 2012-05-16 | T.D.@12,501 CONDITIONING WELLBORE SHOULD BE RUNNING PRODUCTION CASING LATE TOMORROW NIGHT. | ||||
-1341937257 | 2012-04-05 | HAD Drilling on site to set conductor pipe and mouse hole they will set approximately 100' of 20 casing and drill and set mouse hole. | ||||
-1689482446 | 2012-06-11 | Halliburton on site getting ready to perforate toe of lateral and Producers Well Service will perform frac job on said well. | ||||
-1934910757 | 2013-03-27 | Inspection revealed that well is not on line at this time they are waiting on gas line to be installed and restoration work at site is complete.
Note: There is 6-210 bbl tanks within lined and diked area. |
||||
-2016805765 | 2014-05-29 | On the day of my inspection the site passed preliminary restoration according to 1509.072A. | ||||
-249892795 | 2012-04-09 | Inspection revealed that HAD Drilling set 100' of 20 casing and set mouse hole and then moved off site, company rep stated that Union Drilling would be moving in on site later this week. | ||||
435659165 | 2012-05-14 | Drilling lateral@10,200' should be done drilling within the next couple days. | ||||
585434501 | 2012-04-16 | Stopped by drill site to check on status of rig they were preparing to start drilling out from under conductor pipe which was set@117'. |
For data sources see[2]