If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21161 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.38772354,"lon":-81.26234026,"icon":""}]} |
County: Harrison | |
Municipality: | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-07-30 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Well Drilled | |
Violations: 0 | |
Latitude: 40.38772354 | |
Longitude: -81.26234026 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
112837611 | 2013-08-01 | I arrived on location for surface cement job . 20 at 312' with 726 sks got cement returns to surface. No violations this date. | ||||
1375966865 | 2013-08-05 | I arrived on location to inspect wellpad and pick up cement tickets , rig is moving off location. No violations on site at this date. | ||||
1426682620 | 2013-12-13 | I arrived today to check on the drilling status of Nabors Drilling Rig # X07 . I found them rigging down to make repairs to the sub soils below the drilling unit. The rig is tilting and the repairs are to correct this problem. I had a conference with Blake Arthur and Ron Trivisonno about the action required to remediate the sub soils. I was advised to have Chevron submit an engineered plan of remediation to Ron Trivisonno for him to approve before any further drilling could continue. Chevron told me that they have three engineers working the problem and would have a plan on Ron's desk for review shortly. | ||||
465273639 | 2013-08-04 | I arrived on location for a surface job , 1,157' of 13 3/8 cemented w/ 935 sks. |
For data sources see[1]