If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21325 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.35991182,"lon":-81.05943421,"icon":""}]} |
County: Harrison | |
Municipality: | |
Operator Name: CHESAPEAKE EXPLORATION LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2014-05-16 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Well Drilled | |
Violations: 0 | |
Latitude: 40.35991182 | |
Longitude: -81.05943421 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1077096238 | 2014-05-16 | I was advised that the job was to begin today at 9 AM and when I arrived was informed that it would be at 11AM - When I arrived at 11 I found out that the water truck was running 1 to 2 hours behind. I had another job to witness and could not stay. | ||||
1281042173 | 2014-07-17 | The rig ran 54 joints of 9-5/8 40# R-3 J-55 casing and the associated float equipment to 2232' and Schlumberger cemented it with 790 sacks of Class A cement. See the casing ticket for the details. | ||||
-488097536 | 2014-07-16 | The rig ran 19 joints of 13-3/8 54.5# R-3 Casing and the associated float equipment to 610' and Schlumberger cemented with 540 sacks of Class A cement. See the casing ticket for the details. |
For data sources see[1]