X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-099-23129"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-099-23129
 
| Well ID: 34-099-23129
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.0966409151, -80.607628028 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.09649176, -80.60797435 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Mahoning County, Ohio|Mahoning]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[BOCOR HOLDINGS, LLC/BOCOR PROD]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2010-10-22
 
| Spud Date: 2010-10-22
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 41.0966409151
+
| Latitude: 41.09649176
 
|-
 
|-
| Longitude: -80.607628028
+
| Longitude: -80.60797435
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2011-0
 +
| style="text-align:right;" | 10079.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2012-0
 +
| style="text-align:right;" | 5455.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2013-0
 +
| style="text-align:right;" | 3731.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2014-0
 +
| style="text-align:right;" | 3102.0
 +
| style="text-align:right;" | 365.0
 +
|
 +
|
 +
| style="text-align:right;" | 52.0
 +
| style="text-align:right;" | 365.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 94:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 +
|-
 +
| 1222294599
 +
| 2010-11-09
 +
|
 +
| I inspected the road and found that it had not been cleaned up yet.  The contractor was on the drilling location installing the tank battery.  He was told to clean up the dust on Oaks street.  The street was cleaned up.  This complaint is resolved.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1288195028
 +
| 2010-10-27
 +
|
 +
| I performed a rig inspection on G & H rig 91.  The drilling depth was 5434' and drilling on air/soap. This inspection satisfies 1501:9-9-03.  There were no violations at this time.
 +
|
 +
|
 +
|
 +
|-
 
|-
 
|-
 
| -1291901665
 
| -1291901665
 
| 2010-10-28
 
| 2010-10-28
|
+
|  
 
| Part of the drilling rig was still on the location.  The blow pit fluid level was  down 5 feet.  The fluid level in the fluid pit was down 4 feet.
 
| Part of the drilling rig was still on the location.  The blow pit fluid level was  down 5 feet.  The fluid level in the fluid pit was down 4 feet.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1625534238
 +
| 2010-11-08
 +
|
 +
| I received a call from the Uniontown office, Marlene Hall about a complaint from Shawn Green(330-883-2117). I called Mr. Green and found out that Oaks street road had dust and some rocks left from the frac that was performed today.  I called Todd Suckow from BOCOR(330-506-2531).  I told him that we need the broom sweeper to clean off Oaks street.  The time was 4:30pm.  The sweeper was transported but the traffic was to strong to clean off.  BOCOR will clean off Oaks street tomorrow.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -1628217228
 
| -1628217228
 
| 2010-10-28
 
| 2010-10-28
|
+
|  
| I witnessed the cementing of the 4 1/2" casing.  There were no violations at this time.
+
| I witnessed the cementing of the 4 1/2 casing.  There were no violations at this time.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1640416413
 
| -1640416413
 
| 2010-10-22
 
| 2010-10-22
|
+
|  
 
| I performed a rig inspection on G & H rig 91.  The rig was drilling the surface hole on fluid.  The drilling depth was 101'.  This inspection satisfies 1501:9-9-03.  There were no violations at this time
 
| I performed a rig inspection on G & H rig 91.  The rig was drilling the surface hole on fluid.  The drilling depth was 101'.  This inspection satisfies 1501:9-9-03.  There were no violations at this time
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| -19924659
 
| 2011-04-07
 
|
 
| The top soil has been spread over the location in a rough grade.  The ID sign is posted.  The chain link fence is around the wellhead and the tank battery.  The location is muddy.
 
|
 
|
 
|
 
|-
 
|-
 
| -2136101404
 
| 2010-10-25
 
|
 
| I performed a rig inspection on G & H rig 91.  The rig was drilling on air at a drilling depth of 3702'.  This inspection satisfies 1501:9-9-03.  There were no violations at this time.
 
|
 
|
 
|
 
|-
 
|-
 
| -705688968
 
| 2010-11-23
 
|
 
| The debris is gone.  The drillling pits are closed.  The top soil has been spread out on the drilling location.  It has not been seeded yet.  This well has not passed preliminary restoration.  There were no violations at this time.
 
|
 
|
 
|
 
|-
 
|-
 
| -774547790
 
| 2010-10-26
 
|
 
| I performed a rig inspection on G & H rig 91.  The drilling depth was 4721' and drilling on air/soap. This inspection satisfies 1501:9-9-03.  There were no violations at this time.
 
|
 
|
 
|
 
|-
 
|-
 
| 1222294599
 
| 2010-11-09
 
|
 
| I inspected the road and found that it had not been cleaned up yet.  The contractor was on the drilling location installing the tank battery.  He was told to clean up the dust on Oaks street.  The street was cleaned up.  This complaint is resolved.
 
|
 
|
 
|
 
|-
 
|-
 
| 1288195028
 
| 2010-10-27
 
|
 
| I performed a rig inspection on G & H rig 91.  The drilling depth was 5434' and drilling on air/soap. This inspection satisfies 1501:9-9-03.  There were no violations at this time.
 
|
 
|
 
|
 
|-
 
|-
 
| 1625534238
 
| 2010-11-08
 
|
 
|  I received a call from the Uniontown office, Marlene Hall about a complaint from Shawn Green(330-883-2117). I called Mr. Green and found out that Oaks street road had dust and some rocks left from the frac that was performed today.  I called Todd Suckow from BOCOR(330-506-2531).  I told him that we need the broom sweeper to clean off Oaks street.  The time was 4:30pm.  The sweeper was transported but the traffic was to strong to clean off.  BOCOR will clean off Oaks street tomorrow.
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 1697276520
 
| 1697276520
 
| 2010-10-23
 
| 2010-10-23
|
+
|  
| I witnessed the cementing of the 8 5/8" casing.  There were no violations at this time.
+
| I witnessed the cementing of the 8 5/8 casing.  There were no violations at this time.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1859959881
 
| 1859959881
 
| 2010-10-23
 
| 2010-10-23
|
+
|  
| I performed a rig inspection on G & H rig 91.  The rig was in process of running the 8 5/8" casing. This inspection satisfies 1501:9-9-03.  There were no violations at this time
+
| I performed a rig inspection on G & H rig 91.  The rig was in process of running the 8 5/8 casing. This inspection satisfies 1501:9-9-03.  There were no violations at this time
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1919954021
 
| 1919954021
 
| 2010-10-28
 
| 2010-10-28
|
+
|  
| I performed a rig inspection on G & H rig 91. The rig was finishing running  4 1/2" casing.  This inspection satisfies 1501:9-9-03.  There were no violations at this time.
+
| I performed a rig inspection on G & H rig 91. The rig was finishing running  4 1/2 casing.  This inspection satisfies 1501:9-9-03.  There were no violations at this time.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -19924659
 +
| 2011-04-07
 +
|
 +
| The top soil has been spread over the location in a rough grade.  The ID sign is posted.  The chain link fence is around the wellhead and the tank battery.  The location is muddy.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 2125803334
 
| 2125803334
 
| 2011-05-24
 
| 2011-05-24
|
+
|  
 
| There is vegetation growth on the drilling location.  This well PASSES PRELIMINARY RESTORATION.
 
| There is vegetation growth on the drilling location.  This well PASSES PRELIMINARY RESTORATION.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -2136101404
 +
| 2010-10-25
 +
|
 +
| I performed a rig inspection on G & H rig 91.  The rig was drilling on air at a drilling depth of 3702'.  This inspection satisfies 1501:9-9-03.  There were no violations at this time.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 470549874
 
| 470549874
 
| 2011-07-13
 
| 2011-07-13
|
+
|  
 
| Well head and tank battery in very good condition, new fences, fresh paint. Gate locked, ID sign in place. No leaks or spills. No violations at this time.
 
| Well head and tank battery in very good condition, new fences, fresh paint. Gate locked, ID sign in place. No leaks or spills. No violations at this time.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -705688968
 +
| 2010-11-23
 +
|
 +
| The debris is gone.  The drillling pits are closed.  The top soil has been spread out on the drilling location.  It has not been seeded yet.  This well has not passed preliminary restoration.  There were no violations at this time.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 748170372
 
| 748170372
 
| 2010-12-29
 
| 2010-12-29
|
+
|  
 
| The fences were around the tank battery and the wellhead.  The ID sign was posted.  The drilling location was still in the rough grade.  There were no violations at this time.
 
| The fences were around the tank battery and the wellhead.  The ID sign was posted.  The drilling location was still in the rough grade.  There were no violations at this time.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -774547790
 +
| 2010-10-26
 +
|
 +
| I performed a rig inspection on G & H rig 91.  The drilling depth was 4721' and drilling on air/soap. This inspection satisfies 1501:9-9-03.  There were no violations at this time.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 13:51, 16 July 2015

Well Details

Well ID: 34-099-23129
Loading map...
County: Mahoning
Municipality:
Operator Name: BOCOR HOLDINGS, LLC/BOCOR PROD
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2010-10-22
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 41.09649176
Longitude: -80.60797435

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2011-0 10079.0 0.0
2012-0 5455.0 0.0
2013-0 3731.0 0.0
2014-0 3102.0 365.0 52.0 365.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1222294599 2010-11-09 I inspected the road and found that it had not been cleaned up yet. The contractor was on the drilling location installing the tank battery. He was told to clean up the dust on Oaks street. The street was cleaned up. This complaint is resolved.
1288195028 2010-10-27 I performed a rig inspection on G & H rig 91. The drilling depth was 5434' and drilling on air/soap. This inspection satisfies 1501:9-9-03. There were no violations at this time.
-1291901665 2010-10-28 Part of the drilling rig was still on the location. The blow pit fluid level was down 5 feet. The fluid level in the fluid pit was down 4 feet.
1625534238 2010-11-08 I received a call from the Uniontown office, Marlene Hall about a complaint from Shawn Green(330-883-2117). I called Mr. Green and found out that Oaks street road had dust and some rocks left from the frac that was performed today. I called Todd Suckow from BOCOR(330-506-2531). I told him that we need the broom sweeper to clean off Oaks street. The time was 4:30pm. The sweeper was transported but the traffic was to strong to clean off. BOCOR will clean off Oaks street tomorrow.
-1628217228 2010-10-28 I witnessed the cementing of the 4 1/2 casing. There were no violations at this time.
-1640416413 2010-10-22 I performed a rig inspection on G & H rig 91. The rig was drilling the surface hole on fluid. The drilling depth was 101'. This inspection satisfies 1501:9-9-03. There were no violations at this time
1697276520 2010-10-23 I witnessed the cementing of the 8 5/8 casing. There were no violations at this time.
1859959881 2010-10-23 I performed a rig inspection on G & H rig 91. The rig was in process of running the 8 5/8 casing. This inspection satisfies 1501:9-9-03. There were no violations at this time
1919954021 2010-10-28 I performed a rig inspection on G & H rig 91. The rig was finishing running 4 1/2 casing. This inspection satisfies 1501:9-9-03. There were no violations at this time.
-19924659 2011-04-07 The top soil has been spread over the location in a rough grade. The ID sign is posted. The chain link fence is around the wellhead and the tank battery. The location is muddy.
2125803334 2011-05-24 There is vegetation growth on the drilling location. This well PASSES PRELIMINARY RESTORATION.
-2136101404 2010-10-25 I performed a rig inspection on G & H rig 91. The rig was drilling on air at a drilling depth of 3702'. This inspection satisfies 1501:9-9-03. There were no violations at this time.
470549874 2011-07-13 Well head and tank battery in very good condition, new fences, fresh paint. Gate locked, ID sign in place. No leaks or spills. No violations at this time.
-705688968 2010-11-23 The debris is gone. The drillling pits are closed. The top soil has been spread out on the drilling location. It has not been seeded yet. This well has not passed preliminary restoration. There were no violations at this time.
748170372 2010-12-29 The fences were around the tank battery and the wellhead. The ID sign was posted. The drilling location was still in the rough grade. There were no violations at this time.
-774547790 2010-10-26 I performed a rig inspection on G & H rig 91. The drilling depth was 4721' and drilling on air/soap. This inspection satisfies 1501:9-9-03. There were no violations at this time.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.