34-151-24987

Well Details

Well ID: 34-151-24987
Loading map...
County: Stark
Municipality:
Operator Name: ENERVEST OPERATING L
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 1996-05-28
Unconventional: No
Configuration: Vertical
Well Status: Active Injection
Violations: 0
Latitude: 40.89980179
Longitude: -81.27743067

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
1996-0 2729.0 3204.0
1997-0 6853.0 5785.0
1998-0 4397.0 3517.0
1999-0 2649.0 1814.0
2000-0 2801.0 1885.0
2001-0 2763.0 1536.0
2002-0 2720.0 1340.0
2003-0 2244.0 1173.0
2004-0 2146.0 1035.0
2005-0 1796.0 833.0
2006-0 1719.0 783.0
2007-0 1516.0 711.0
2008-0 1417.0 559.0
2010-0 1086.0 1217.0
2011-0 996.0 476.0
2013-0 26.0 0.0
2014-0 0.0 0.0 0.0 0.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1001208747 2012-11-26 I inspected the Flintkote (ERP #1) No. 37 (34151249870000) injection well on November 26, 2012; I was accompanied by Steve Ochs. There were no violations at the wellhead or at the brine tanks.
-1197507575 2014-07-24 There were no violations at the time of inspection.
-1304605512 2013-09-30 There were no violations at the time of my inspection.
1324259161 2011-12-14 Rick Kepler called me for a Mechanical Integrity Test (MIT). When I arrived at the site, a new Halliburton PLT packer was run by Bishop Well Service on 2.375 EUE tubing and set at 4666' (36' above the top perforation) with 10,000 pounds compression. Universal Well Services pumped and circulated 101 barrels of packer inhibitor in the annulus. The annulus was pressured up to 1120 PSI. The test was started at 1120 PSI and ended at 1110 PSI after 21 minutes. The MIT PASSED. Rick Kepler (EnerVest) will submit a tubing tally to Tom Tomastik at the Columbus office. The allowable injection pressure for this well is 1080 psi.
13512 PASSED Y WITNESSED 10/1/96 INSPECTOR BRETT FARNSWORTH DATE 10/0119/96 DATA FROM OLD VAX INFO
144179738 2014-12-12 The injection well and surface facility were inspected. There were no violations found at the time.
1462742295 2014-09-16 There were no violations found at the time.
1684182125 2014-04-21 There were no violations found at the time of inspection.
1861328995 2014-05-30 An inspection of the well and injection facility found no violations.
1941020086 2012-03-30 I witnessed the testing of the flowline to 1325 PSI for 45 minutes. There was no loss in pressure - test passed.
-48354451 2012-06-11 My inspection of this well site found no violations at this time.
-538987086 2013-12-27 There were no violations at the time of inspection.
-552651187 2014-03-06 There were no violations at the time of inspection.
675657973 2011-06-29 This well was inspected as part of a Enhanced Recovery Project. This well will be used as an injection site. Once the production well pumping unit is removed and the well is converted into an injection well, place a containment dike around the well head and fence off the site.
-743356701 2012-11-26 Ryan Channell and I inspected the surface facility and injection well and found no violations.
-906489295 2015-03-16 The injection well and surface facility were inspected. There were no violations found at the time.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.