INSPECTION ID
|
DATE
|
DESCRIPTION
|
COMMENT
|
VIOLATION ID
|
VIOLATION CODE
|
VIOLATION_COMMENT
|
-1134131424
|
2010-01-12
|
|
The required 5 year MIT is still on hold at the request of the City. They are waiting for the Moore Well service rig to pull the tubing and set a packer to conduct the test. On this date they were producing some brine which was being discharged into their containment pit.
|
|
|
|
-1192659126
|
2009-02-02
|
|
Status check inspection found no violations at this time. The injection pressure will be checked at a later date. The ID is posted on the perimeter fence and the system was placing brine in the holding pit. The five year MIT is due this year.
|
|
|
|
-1544334726
|
2011-12-28
|
|
The City of Cuyahoga Falls continues to use this well to generate brine for use in the adjacent water treatment plant and for snow and ice control. During this inspection, brine was being pumped into the holding pond and City trucks were loading for road application.
|
|
|
|
-2071468511
|
2004-02-06
|
|
Status check inspection of solution project prior to meeting with John Christman regarding MIT test. No violations at this time.
|
|
|
|
-851761336
|
2010-03-22
|
|
Moore Well Service is on site to initiate the five year MIT requirement. The 2-3/8" tubing has been removed and the plan is to run a scraper in the morning before attempting to run the packer necessary for the MIT.
|
|
|
|
1081340000
|
2004-04-06
|
|
Completed the Mechanical Integrity Test on the 5-1/2" casing in this solution mining well. Ran a Halliburton RTTS retrievable packer on 2-3/8" tubing. Set packer at 2663'. Pressure up to 150# and found a leak at the tubing head. Tighten and retest to 500#. Had a small leak in the packing of one the old valves. The test had to be done through the old valves because of the connection sizes. This leak probably accounted for the 3% pressure loss (500 psi to 485 psi) after the 15 minute test. All of the valves will be replaced before the system is placed back into operation.
Initial - 500 psi 5 Minute - 500 psi 10 Minute - 495 psi 15 Minute - 485 psi TEST PASSED.
|
|
|
|
1269266382
|
2010-03-19
|
|
The well is scheduled for a 5 year mechanical integrity test. Moore Well Service is bringing a service rig on Monday 3/22 to start the project which will include removing the tubing, running a retrievable packer and completing the MIT.
|
|
|
|
1270502005
|
2010-03-23
|
|
Met on site with Keith Moore representing Moore Well Service and discussed the planned activity. The MIT is scheduled for 3/24.
|
|
|
|
1739716426
|
2004-02-04
|
|
Status check inspection prior to conducting MIT.
|
|
|
|
253529591
|
2004-04-08
|
|
Run 2-3/8" tubing back into the hole, pressure up and start circulating.
|
|
|
|
621302873
|
2010-03-24
|
|
on site for MIT test of well casing 51/2". Ran a Baker #81 Packer on 23/8" tubing set at 2680'.ran pressure up to 380PSI shut in waited 10 minutes no leaks. Then bleed off pressure then ran MIT test pressure up to 525PSI shut in started time at 5min press
|
|
|
|