X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-153-22968"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-153-22968
 
| Well ID: 34-153-22968
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.0179401791, -81.5581874407 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.01794018, -81.55818744 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Summit County, Ohio|Summit]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[CARGILL INC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2006-08-30
 
| Spud Date: 2006-08-30
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Active Injection
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 41.0179401791
+
| Latitude: 41.01794018
 
|-
 
|-
| Longitude: -81.5581874407
+
| Longitude: -81.55818744
 
|-
 
|-
|}
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | GAS QUANTITY
 
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
|}
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | TYPE
 
!scope="col" | QUANTITY
 
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|}
 
|}
 
== Inspection Data ==
 
== Inspection Data ==
Line 64: Line 42:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
 
| -1053097687
 
| -1053097687
 
| 2006-09-06
 
| 2006-09-06
|
+
|  
| Status check inspection found no violations. Union should finish the 9-7/8" hole in the next few days.
+
| Status check inspection found no violations. Union should finish the 9-7/8 hole in the next few days.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1089762204
 +
| 2007-07-25
 +
|
 +
| Preliminary restoration is approved.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -1115146998
 
| -1115146998
 
| 2011-10-11
 
| 2011-10-11
|
+
|  
| This inspection was completed as part of the required five year mechanical integrity test (MIT). The test well is the 7" production casing in Akron #75. The reference well was the 7" casing in Akron #74 (PN-2967). The test began at 07:00 am and was concluded at 3:00 pm on 10/11/2011. The first pressure difference between the test well and the reference well was 424.071 psi. The final pressure difference between the test well and the reference well, eight hours later was 424.069 psi. Based on the pressure change from start to finish, the Akron 75 well easily passes this MIT.
+
| This inspection was completed as part of the required five year mechanical integrity test (MIT). The test well is the 7 production casing in Akron #75. The reference well was the 7 casing in Akron #74 (PN-2967). The test began at 07:00 am and was concluded at 3:00 pm on 10/11/2011. The first pressure difference between the test well and the reference well was 424.071 psi. The final pressure difference between the test well and the reference well, eight hours later was 424.069 psi. Based on the pressure change from start to finish, the Akron 75 well easily passes this MIT.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1159994592
 +
| 2006-09-27
 +
|
 +
| The drilling rig has moved off and the site has been rough graded. The small cementing pit has also been closed. No violations at this time.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -1293828886
 
| -1293828886
 
| 2013-06-24
 
| 2013-06-24
|
+
|  
 
| The well was properly identified.  My inspection was accompanied by Andrew Adgate.
 
| The well was properly identified.  My inspection was accompanied by Andrew Adgate.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1478332437
 
| -1478332437
 
| 2006-09-12
 
| 2006-09-12
|
+
|  
| The MIT was successfully completed on the 7" production casing. The initial shut in pressure was 560 psi with no change after 5, 10 and 15 minute intervals.
+
| The MIT was successfully completed on the 7 production casing. The initial shut in pressure was 560 psi with no change after 5, 10 and 15 minute intervals.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| -1871638510
 
| 2009-06-18
 
|
 
| Columbus requested an annual inspection of the solution mining wells. This inspection found no violations at this time.
 
|
 
|
 
|
 
|-
 
|-
 
| -399983951
 
| 2008-12-31
 
|
 
| Annual status check inspection found no violations at this time.
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
| 1089762204
+
| -1649683291
| 2007-07-25
+
| 2014-12-05
|
+
|  
| Preliminary restoration is approved.
+
| An inspection of the well found no violations at the time.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| 1159994592
 
| 2006-09-27
 
|
 
| The drilling rig has moved off and the site has been rough graded. The small cementing pit has also been closed. No violations at this time.
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 1733966972
 
| 1733966972
 
| 2007-05-16
 
| 2007-05-16
|
+
|  
 
| Preliminary restoration is due this month. The site still needs to be finish graded, topsoil spread, seeded and mulched.
 
| Preliminary restoration is due this month. The site still needs to be finish graded, topsoil spread, seeded and mulched.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1786677391
 
| 1786677391
 
| 2006-09-21
 
| 2006-09-21
|
+
|  
 
| Union Drilling has finished drilling and is starting to move off site.
 
| Union Drilling has finished drilling and is starting to move off site.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1827656906
 
| 1827656906
 
| 2010-08-03
 
| 2010-08-03
|
+
|  
 
| Annual inspection of this solution mining well found no violations at this time.
 
| Annual inspection of this solution mining well found no violations at this time.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -1871638510
 +
| 2009-06-18
 +
|
 +
| Columbus requested an annual inspection of the solution mining wells. This inspection found no violations at this time.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -399983951
 +
| 2008-12-31
 +
|
 +
| Annual status check inspection found no violations at this time.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 11:17, 15 July 2015

Well Details

Well ID: 34-153-22968
Loading map...
County: Summit
Municipality:
Operator Name: CARGILL INC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2006-08-30
Unconventional: No
Configuration: Vertical
Well Status: Active Injection
Violations: 0
Latitude: 41.01794018
Longitude: -81.55818744

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
-1053097687 2006-09-06 Status check inspection found no violations. Union should finish the 9-7/8 hole in the next few days.
1089762204 2007-07-25 Preliminary restoration is approved.
-1115146998 2011-10-11 This inspection was completed as part of the required five year mechanical integrity test (MIT). The test well is the 7 production casing in Akron #75. The reference well was the 7 casing in Akron #74 (PN-2967). The test began at 07:00 am and was concluded at 3:00 pm on 10/11/2011. The first pressure difference between the test well and the reference well was 424.071 psi. The final pressure difference between the test well and the reference well, eight hours later was 424.069 psi. Based on the pressure change from start to finish, the Akron 75 well easily passes this MIT.
1159994592 2006-09-27 The drilling rig has moved off and the site has been rough graded. The small cementing pit has also been closed. No violations at this time.
-1293828886 2013-06-24 The well was properly identified. My inspection was accompanied by Andrew Adgate.
-1478332437 2006-09-12 The MIT was successfully completed on the 7 production casing. The initial shut in pressure was 560 psi with no change after 5, 10 and 15 minute intervals.
-1649683291 2014-12-05 An inspection of the well found no violations at the time.
1733966972 2007-05-16 Preliminary restoration is due this month. The site still needs to be finish graded, topsoil spread, seeded and mulched.
1786677391 2006-09-21 Union Drilling has finished drilling and is starting to move off site.
1827656906 2010-08-03 Annual inspection of this solution mining well found no violations at this time.
-1871638510 2009-06-18 Columbus requested an annual inspection of the solution mining wells. This inspection found no violations at this time.
-399983951 2008-12-31 Annual status check inspection found no violations at this time.

For data sources see[1]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20.