34-153-23099

Well Details

Well ID: 34-153-23099
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2010-03-02
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 41.083233245
Longitude: -81.575318482

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1463012603 2010-05-06 The tank battery is built but the well is not turned on. Waiting for security fence to be installed.
-1979000835 2010-04-20 Don's Excavating was on site building the tank battery. The well should be turned on in the next month. No violations at this time.
-2092790398 2010-03-04 Wildcat is drilling ahead in the Ohio Shale. The pits are fenced, lined and in good condition. No violations at this time.
-824944734 2010-03-01 Dons Excavating was on site to start prepping the site for the drilling rig which is scheduled to arrive tomorrow. The ID sign and permit are posted as required.
-878382426 2010-03-15 The drilling pits have been solidified but still need to be covered and brought back to grade. The fence will remain until that occurs.
1308595325 2011-06-06 The site has been reclaimed, the security fence is in place, the identification is posted and the well is in production. Preliminary restoration is approved.
1517084396 2010-03-10 The drilling pits are still open but are fenced, lined and in good condition. They are scheduled to be solidified in the next few days.
456521600 2010-03-05 Wildcat is drilling ahead in the Lockport dolomite. If gas and/or water is encountered in this interval, the rig plans to convert to fluid.
476177495 2011-01-25 The well is in production. Preliminary restoration will be evaluated after the snow in gone and the site can be inspected.
57662887 2010-05-25 The well is ready to turn on as soon as the pipeline connections are made. The tank battery and well are fenced and secured.