| Well ID: 37-003-22153 | | Well ID: 37-003-22153 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.477816, -79.731652 | width=100% | height=100% }} |
+ | |- | ||
+ | | County: [[Allegheny County, Pennsylvania|Allegheny]] | ||
+ | |- | ||
+ | | Municipality: [[Plum Borough, Allegheny County, Pennsylvania|Plum Borough]] | ||
|- | |- | ||
| Operator Name: [[PENNECO OIL CO INC]] | | Operator Name: [[PENNECO OIL CO INC]] | ||
+ | |- | ||
+ | | Well Pad ID: | ||
+ | |- | ||
+ | | Farm/Lease Name: O'BLOCK 1 | ||
|- | |- | ||
| First Permit Date: 2010-12-14 | | First Permit Date: 2010-12-14 | ||
Line 17: | Line 25: | ||
| Horizontal: No | | Horizontal: No | ||
|- | |- | ||
− | | Violations: | + | | Well Status: INACTIVE |
+ | |- | ||
+ | | Violations: 0 | ||
|- | |- | ||
| Latitude: 40.477816 | | Latitude: 40.477816 | ||
Line 34: | Line 44: | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
|- | |- | ||
− | | | + | | 2010-0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 0.0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 0.0 |
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2011-0 | ||
+ | | style="text-align:right;" | 3270.0 | ||
+ | | style="text-align:right;" | 275.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
Line 52: | Line 71: | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 2013-0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 2357.0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 365.0 |
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
Line 61: | Line 80: | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 2014-0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 1461.0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 365.0 |
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
Line 70: | Line 89: | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Production Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production | ||
+ | | accessdate = 2015-05-27 }}</ref> | ||
== Waste Data == | == Waste Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 88: | Line 113: | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0101508 | | PA0101508 | ||
− | | | + | | FLUID RECOVERY SERVICE FRANKLIN FACILITY |
| FRANKLIN | | FRANKLIN | ||
| PA | | PA | ||
Line 94: | Line 119: | ||
|- | |- | ||
| 2011-0 | | 2011-0 | ||
− | | | + | | DRILLING FLUID WASTE |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 1.0 |
| Bbl | | Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
− | | | + | | PA0091472 |
− | | | + | | TUNNELTON LIQUIDS TREATMENT FACILITY |
− | | | + | | SALTSBURG |
| PA | | PA | ||
|- | |- | ||
|- | |- | ||
| 2011-0 | | 2011-0 | ||
− | | | + | | FRACING FLUID WASTE |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 100.0 |
| Bbl | | Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
− | | | + | | PA0101508 |
− | | | + | | FLUID RECOVERY SERVICE FRANKLIN FACILITY |
− | | | + | | FRANKLIN |
| PA | | PA | ||
|- | |- | ||
Line 121: | Line 146: | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0091472 | | PA0091472 | ||
− | | TUNNELTON LIQUIDS | + | | TUNNELTON LIQUIDS TREATMENT FACILITY |
| SALTSBURG | | SALTSBURG | ||
| PA | | PA | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Waste Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste | ||
+ | | accessdate = 2015-05-26 }}</ref> | ||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 133: | Line 164: | ||
!scope="col" | COMMENT | !scope="col" | COMMENT | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
+ | !scope="col" | VIOLATION CODE | ||
+ | !scope="col" | VIOLATION_COMMENT | ||
|- | |- | ||
| 1952927 | | 1952927 | ||
Line 138: | Line 171: | ||
| No Violations Noted | | No Violations Noted | ||
| On January 20th, 2011 I conducted a routine inspection of the above site. Drilling was taking place at the time of the inspection. Cement trucks were on site. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pit was constructed and appeared to be in good condition. No spills, leaks, or accelerated erosion were observed at the time of inspection. | | On January 20th, 2011 I conducted a routine inspection of the above site. Drilling was taking place at the time of the inspection. Cement trucks were on site. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pit was constructed and appeared to be in good condition. No spills, leaks, or accelerated erosion were observed at the time of inspection. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 145: | Line 180: | ||
| No Violations Noted | | No Violations Noted | ||
| On January 28th, 2011 I conducted a routine inspection of the above site. Drilling was completed and the rig was moving off location. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pit appeared to be in good condition and displayed adequate freeboard. No spills, leaks, or accelerated erosion were observed at the time of inspection. | | On January 28th, 2011 I conducted a routine inspection of the above site. Drilling was completed and the rig was moving off location. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pit appeared to be in good condition and displayed adequate freeboard. No spills, leaks, or accelerated erosion were observed at the time of inspection. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 152: | Line 189: | ||
| No Violations Noted | | No Violations Noted | ||
| THE SITE IS BUILT. E&S, AND ACCESS OK. THE PIT IS LINED. THERE IS NO EQUIPTMENT ON THE SITE. | | THE SITE IS BUILT. E&S, AND ACCESS OK. THE PIT IS LINED. THERE IS NO EQUIPTMENT ON THE SITE. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 160: | Line 199: | ||
| USE RIG #4 DRILLING @ 1710'. | | USE RIG #4 DRILLING @ 1710'. | ||
SITE, PIT, E&S, AND ACCESS, OK. | SITE, PIT, E&S, AND ACCESS, OK. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 168: | Line 209: | ||
| USE RIG#4 BEGINNING TO DRILL AFTER 7" CEMENT TIME. | | USE RIG#4 BEGINNING TO DRILL AFTER 7" CEMENT TIME. | ||
SITE, PIT, E&S, AND ACCESS, OK. | SITE, PIT, E&S, AND ACCESS, OK. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 177: | Line 220: | ||
THE RIG IS GONE ALTHOUGH SOME EQUIPTMENT REMAINS ON THE PAD. | THE RIG IS GONE ALTHOUGH SOME EQUIPTMENT REMAINS ON THE PAD. | ||
SITE, PIT, E&S, AND ACCESS, OK. | SITE, PIT, E&S, AND ACCESS, OK. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 186: | Line 231: | ||
WELL IS BEING FRACED BY APPALACHIAN SERVICES. | WELL IS BEING FRACED BY APPALACHIAN SERVICES. | ||
SITE, PIT, E&S, AND ACCESS, OK. | SITE, PIT, E&S, AND ACCESS, OK. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 193: | Line 240: | ||
| No Violations Noted | | No Violations Noted | ||
| On February 3rd, 2011 I conducted a routine inspection of the above site. Drilling was completed. Frac tanks had been placed onsite. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pit appeared to be in good condition and displayed adequate freeboard. No spills, leaks, or accelerated erosion were observed at the time of inspection. | | On February 3rd, 2011 I conducted a routine inspection of the above site. Drilling was completed. Frac tanks had been placed onsite. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pit appeared to be in good condition and displayed adequate freeboard. No spills, leaks, or accelerated erosion were observed at the time of inspection. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 200: | Line 249: | ||
| No Violations Noted | | No Violations Noted | ||
| On February 17th, 2011 I conducted a routine inspection of the above site. Drilling and frac were completed. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pit appeared to be in good condition and displayed adequate freeboard. No spills, leaks, or accelerated erosion were observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved. | | On February 17th, 2011 I conducted a routine inspection of the above site. Drilling and frac were completed. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pit appeared to be in good condition and displayed adequate freeboard. No spills, leaks, or accelerated erosion were observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 207: | Line 258: | ||
| No Violations Noted | | No Violations Noted | ||
| On February 24th, 2011 I conducted a routine inspection of the above site. Drilling and frac were completed. A site ID sign and E&S plan were posted at the site. The access road was in good condition and recently rocked. All E&S controls were in place and constructed according to the plan at site. The pits were closed and the site was being put back. No spills, leaks, or accelerated erosion were observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved. | | On February 24th, 2011 I conducted a routine inspection of the above site. Drilling and frac were completed. A site ID sign and E&S plan were posted at the site. The access road was in good condition and recently rocked. All E&S controls were in place and constructed according to the plan at site. The pits were closed and the site was being put back. No spills, leaks, or accelerated erosion were observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 216: | Line 269: | ||
SITE IS RESTORED BUT NOT SEEDED. | SITE IS RESTORED BUT NOT SEEDED. | ||
E&S CONTROLS ARE IN PLACE. | E&S CONTROLS ARE IN PLACE. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 223: | Line 278: | ||
| No Violations Noted | | No Violations Noted | ||
| On March 18th, 2011 I conducted a routine inspection of the above site. Drilling and frac were completed and the well was now in production. A site ID sign and E&S plan were posted at the site. The access road was in good condition. The landowner requested that the gate be replaced. All E&S controls were in place and constructed according to the plan at site. The pits were closed and the site was rough graded. No spills, leaks, or accelerated erosion were observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved. | | On March 18th, 2011 I conducted a routine inspection of the above site. Drilling and frac were completed and the well was now in production. A site ID sign and E&S plan were posted at the site. The access road was in good condition. The landowner requested that the gate be replaced. All E&S controls were in place and constructed according to the plan at site. The pits were closed and the site was rough graded. No spills, leaks, or accelerated erosion were observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 231: | Line 288: | ||
| WELL IS PRODUCING. ANULUS IS OPEN. | | WELL IS PRODUCING. ANULUS IS OPEN. | ||
SITE CONTOURS ARE RESTORED BUT NOT SEEDED. | SITE CONTOURS ARE RESTORED BUT NOT SEEDED. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 238: | Line 297: | ||
| No Violations Noted | | No Violations Noted | ||
| On June 2nd, 2011 I conducted a routine inspection of the above site. Drilling and frac were completed and the well was now in production. A well tag was present. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pits were closed and the site was rough graded. No spills, leaks, or accelerated erosion were observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved. | | On June 2nd, 2011 I conducted a routine inspection of the above site. Drilling and frac were completed and the well was now in production. A well tag was present. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pits were closed and the site was rough graded. No spills, leaks, or accelerated erosion were observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
|} | |} | ||
− | ==References== | + | For data sources see<ref>{{cite web |
− | {{ | + | | title = Oil and Gas Historical Inspection Report |
− | + | | publisher = [[Pennsylvania Department of Environmental Protection]] | |
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections | ||
+ | | accessdate = 2015-05-27 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 37-003-22153 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.477816,"lon":-79.731652,"icon":""}]} |
County: Allegheny | |
Municipality: Plum Borough | |
Operator Name: PENNECO OIL CO INC | |
Well Pad ID: | |
Farm/Lease Name: O'BLOCK 1 | |
First Permit Date: 2010-12-14 | |
Last Permit Date: 2010-12-14 | |
Spud Date: 2011-01-18 | |
Unconventional: No | |
Horizontal: No | |
Well Status: INACTIVE | |
Violations: 0 | |
Latitude: 40.477816 | |
Longitude: -79.731652 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2010-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 3270.0 | 275.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-0 | 3673.0 | 366.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-0 | 2357.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-0 | 1461.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
For data sources see[1]
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2011-0 | DRILLING FLUID WASTE | 107.14 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 | FLUID RECOVERY SERVICE FRANKLIN FACILITY | FRANKLIN | PA |
2011-0 | DRILLING FLUID WASTE | 1.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS TREATMENT FACILITY | SALTSBURG | PA |
2011-0 | FRACING FLUID WASTE | 100.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 | FLUID RECOVERY SERVICE FRANKLIN FACILITY | FRANKLIN | PA |
2011-0 | FRACING FLUID WASTE | 760.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS TREATMENT FACILITY | SALTSBURG | PA |
For data sources see[2]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
1952927 | 2011-01-20 | No Violations Noted | On January 20th, 2011 I conducted a routine inspection of the above site. Drilling was taking place at the time of the inspection. Cement trucks were on site. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pit was constructed and appeared to be in good condition. No spills, leaks, or accelerated erosion were observed at the time of inspection. | |||
1953104 | 2011-01-28 | No Violations Noted | On January 28th, 2011 I conducted a routine inspection of the above site. Drilling was completed and the rig was moving off location. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pit appeared to be in good condition and displayed adequate freeboard. No spills, leaks, or accelerated erosion were observed at the time of inspection. | |||
1953925 | 2011-01-18 | No Violations Noted | THE SITE IS BUILT. E&S, AND ACCESS OK. THE PIT IS LINED. THERE IS NO EQUIPTMENT ON THE SITE. | |||
1956826 | 2011-01-24 | No Violations Noted | USE RIG #4 DRILLING @ 1710'.
SITE, PIT, E&S, AND ACCESS, OK. |
|||
1956844 | 2011-01-26 | No Violations Noted | USE RIG#4 BEGINNING TO DRILL AFTER 7" CEMENT TIME.
SITE, PIT, E&S, AND ACCESS, OK. |
|||
1956849 | 2011-01-31 | No Violations Noted | DRILLING COMPLETE. 4.5" CASING IS IN.
THE RIG IS GONE ALTHOUGH SOME EQUIPTMENT REMAINS ON THE PAD. SITE, PIT, E&S, AND ACCESS, OK. |
|||
1957392 | 2011-02-08 | No Violations Noted | DRILLING COMPLETE.
WELL IS BEING FRACED BY APPALACHIAN SERVICES. SITE, PIT, E&S, AND ACCESS, OK. |
|||
1957813 | 2011-02-03 | No Violations Noted | On February 3rd, 2011 I conducted a routine inspection of the above site. Drilling was completed. Frac tanks had been placed onsite. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pit appeared to be in good condition and displayed adequate freeboard. No spills, leaks, or accelerated erosion were observed at the time of inspection. | |||
1958776 | 2011-02-17 | No Violations Noted | On February 17th, 2011 I conducted a routine inspection of the above site. Drilling and frac were completed. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pit appeared to be in good condition and displayed adequate freeboard. No spills, leaks, or accelerated erosion were observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved. | |||
1958889 | 2011-02-24 | No Violations Noted | On February 24th, 2011 I conducted a routine inspection of the above site. Drilling and frac were completed. A site ID sign and E&S plan were posted at the site. The access road was in good condition and recently rocked. All E&S controls were in place and constructed according to the plan at site. The pits were closed and the site was being put back. No spills, leaks, or accelerated erosion were observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved. | |||
1959472 | 2011-03-02 | No Violations Noted | WELL IS COMPLETE AND SHUT IN.
SITE IS RESTORED BUT NOT SEEDED. E&S CONTROLS ARE IN PLACE. |
|||
1961869 | 2011-03-18 | No Violations Noted | On March 18th, 2011 I conducted a routine inspection of the above site. Drilling and frac were completed and the well was now in production. A site ID sign and E&S plan were posted at the site. The access road was in good condition. The landowner requested that the gate be replaced. All E&S controls were in place and constructed according to the plan at site. The pits were closed and the site was rough graded. No spills, leaks, or accelerated erosion were observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved. | |||
1974613 | 2011-04-27 | No Violations Noted | WELL IS PRODUCING. ANULUS IS OPEN.
SITE CONTOURS ARE RESTORED BUT NOT SEEDED. |
|||
1984930 | 2011-06-02 | No Violations Noted | On June 2nd, 2011 I conducted a routine inspection of the above site. Drilling and frac were completed and the well was now in production. A well tag was present. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pits were closed and the site was rough graded. No spills, leaks, or accelerated erosion were observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved. |