X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-003-22153"

m
 
m
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-003-22153
 
| Well ID: 37-003-22153
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.477816, -79.731652 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.477817, -79.731653 | width=100% | height=100% }}
 +
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 +
|-
 +
| County: [[Allegheny_County,_Pennsylvania|Allegheny]]
 +
|-
 +
| Municipality: [[Plum Borough,_Allegheny_County,_Pennsylvania|Plum Borough]]
 +
|-
 +
| Operator Name: [[DAKOTA OIL & GAS CO]]
 +
|-
 +
| Well Pad ID:
 
|-
 
|-
| Operator Name: [[PENNECO OIL CO INC]]
+
| Farm/Lease Name: OBLOCK 1
 
|-
 
|-
| First Permit Date: 2010-12-14
+
| License Status:  
 
|-
 
|-
| Last Permit Date: 2010-12-14
+
| Spud Date:  
 
|-
 
|-
| Spud Date: 2011-01-18
+
| Permit Date: 2010-12-14
 
|-
 
|-
| Unconventional: No
+
| Well Type: OIL
 
|-
 
|-
| Horizontal: No
+
| Unconventional Well: N
 
|-
 
|-
| Violations: None
+
| Configuration: Vertical Well
 
|-
 
|-
| Latitude: 40.477816
+
| Conservation: No
 
|-
 
|-
| Longitude: -79.731652
+
| Latitude: 40.477817
 
|-
 
|-
 +
| Longitude: -79.731653
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2010-12-14
 +
| New Permit Application
 +
|-
 +
| 2011-01-18
 +
| Performed Spud Operation
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2010
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 3,270.00
 +
| style="text-align: right;" | 275
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 3,673.00
 +
| style="text-align: right;" | 366
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2013-0
+
| 2013
| style="text-align:right;" | 2357.0
+
| [[PENNECO OIL CO INC]]
| style="text-align:right;" | 365.0
+
| style="text-align: right;" | 2,357.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2014
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 1,461.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-0
+
| 2015
| style="text-align:right;" | 3673.0
+
| [[DAKOTA OIL & GAS CO]]
| style="text-align:right;" | 366.0
+
| style="text-align: right;" | 1,434.66
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2016
 +
| [[DAKOTA OIL & GAS CO]]
 +
| style="text-align: right;" | 866.28
 +
| style="text-align: right;" | 274
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-0
+
| 2017
| style="text-align:right;" | 3270.0
+
| [[DAKOTA OIL & GAS CO]]
| style="text-align:right;" | 275.0
+
| style="text-align: right;" | 1,045.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2018
 +
| [[DAKOTA OIL & GAS CO]]
 +
| style="text-align: right;" | 960.92
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2010-0
+
| 2019
| style="text-align:right;" | 0.0
+
| [[DAKOTA OIL & GAS CO]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 764.83
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 334
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator
!scope="col" | QUANTITY
+
!scope="col" | Waste Type
!scope="col" | UNITS
+
!scope="col" | Quantity
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Disposal Method
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2011-0
+
| 2011
| DRILLING FLUID WASTE
+
| [[PENNECO OIL CO INC]]
| style="text-align:right;" | 107.14
+
| Fracing Fluid Waste
| Bbl
+
| style="text-align: right;" | 100.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
| PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO
 
| FRANKLIN
 
| PA
 
 
|-
 
|-
 +
| 2011
 +
| [[PENNECO OIL CO INC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 760.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0091472
 
|-
 
|-
| 2011-0
+
| 2011
| FRACING FLUID WASTE
+
| [[PENNECO OIL CO INC]]
| style="text-align:right;" | 100.0
+
| Drilling Fluid Waste
| Bbl
+
| style="text-align: right;" | 107.14 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
| PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO
 
| FRANKLIN
 
| PA
 
|-
 
 
|-
 
|-
| 2011-0
+
| 2011
| DRILLING FLUID WASTE
+
| [[PENNECO OIL CO INC]]
| style="text-align:right;" | 1510.0
+
| Drilling Fluid Waste
| Bbl
+
| style="text-align: right;" | 1,510.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
| TUNNELTON LIQUIDS COMPANY
 
| SALTSBURG
 
| PA
 
|-
 
|-
 
| 2011-0
 
| FRACING FLUID WASTE
 
| style="text-align:right;" | 760.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| TUNNELTON LIQUIDS COMPANY
 
| SALTSBURG
 
| PA
 
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 
| 1952927
 
| 1952927
 +
| Primary Facility
 
| 2011-01-20
 
| 2011-01-20
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On January 20th, 2011 I conducted a routine inspection of the above site.  Drilling was taking place at the time of the inspection.  Cement trucks were on site.  A site ID sign and E&S plan were posted at the site.  The access road was in good condition.  All E&S controls were in place and constructed according to the plan at site.  The pit was constructed and appeared to be in good condition.  No spills, leaks, or accelerated erosion were observed at the time of inspection.
 
| On January 20th, 2011 I conducted a routine inspection of the above site.  Drilling was taking place at the time of the inspection.  Cement trucks were on site.  A site ID sign and E&S plan were posted at the site.  The access road was in good condition.  All E&S controls were in place and constructed according to the plan at site.  The pit was constructed and appeared to be in good condition.  No spills, leaks, or accelerated erosion were observed at the time of inspection.
|
 
|-
 
 
|-
 
|-
 
| 1953104
 
| 1953104
 +
| Primary Facility
 
| 2011-01-28
 
| 2011-01-28
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On January 28th, 2011 I conducted a routine inspection of the above site.  Drilling was completed and the rig was moving off location.  A site ID sign and E&S plan were posted at the site.  The access road was in good condition.  All E&S controls were in place and constructed according to the plan at site.  The pit appeared to be in good condition and displayed adequate freeboard.  No spills, leaks, or accelerated erosion were observed at the time of inspection.
 
| On January 28th, 2011 I conducted a routine inspection of the above site.  Drilling was completed and the rig was moving off location.  A site ID sign and E&S plan were posted at the site.  The access road was in good condition.  All E&S controls were in place and constructed according to the plan at site.  The pit appeared to be in good condition and displayed adequate freeboard.  No spills, leaks, or accelerated erosion were observed at the time of inspection.
|
 
|-
 
 
|-
 
|-
 
| 1953925
 
| 1953925
 +
| Primary Facility
 
| 2011-01-18
 
| 2011-01-18
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| THE SITE IS BUILT. E&S, AND ACCESS OK. THE PIT IS LINED. THERE IS NO EQUIPTMENT ON THE SITE.
 
| THE SITE IS BUILT. E&S, AND ACCESS OK. THE PIT IS LINED. THERE IS NO EQUIPTMENT ON THE SITE.
|
 
|-
 
 
|-
 
|-
 
| 1956826
 
| 1956826
 +
| Primary Facility
 
| 2011-01-24
 
| 2011-01-24
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| USE RIG #4 DRILLING @ 1710'.
 
| USE RIG #4 DRILLING @ 1710'.
SITE, PIT, E&S, AND ACCESS, OK.
 
|
 
|-
 
 
|-
 
|-
 
| 1956844
 
| 1956844
 +
| Primary Facility
 
| 2011-01-26
 
| 2011-01-26
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| USE RIG#4 BEGINNING TO DRILL AFTER 7" CEMENT TIME.
 
| USE RIG#4 BEGINNING TO DRILL AFTER 7" CEMENT TIME.
SITE, PIT, E&S, AND ACCESS, OK.
 
|
 
|-
 
 
|-
 
|-
 
| 1956849
 
| 1956849
 +
| Primary Facility
 
| 2011-01-31
 
| 2011-01-31
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| DRILLING COMPLETE. 4.5" CASING IS IN.
 
| DRILLING COMPLETE. 4.5" CASING IS IN.
THE RIG IS GONE ALTHOUGH SOME EQUIPTMENT REMAINS ON THE PAD.
 
SITE, PIT, E&S, AND ACCESS, OK.
 
|
 
|-
 
 
|-
 
|-
 
| 1957392
 
| 1957392
 +
| Primary Facility
 
| 2011-02-08
 
| 2011-02-08
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| DRILLING COMPLETE.  
+
| DRILLING COMPLETE.
WELL IS BEING FRACED BY APPALACHIAN SERVICES.
 
SITE, PIT, E&S, AND ACCESS, OK.
 
|
 
|-
 
 
|-
 
|-
 
| 1957813
 
| 1957813
 +
| Primary Facility
 
| 2011-02-03
 
| 2011-02-03
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On February 3rd, 2011 I conducted a routine inspection of the above site.  Drilling was completed.  Frac tanks had been placed onsite.  A site ID sign and E&S plan were posted at the site.  The access road was in good condition.  All E&S controls were in place and constructed according to the plan at site.  The pit appeared to be in good condition and displayed adequate freeboard.  No spills, leaks, or accelerated erosion were observed at the time of inspection.
 
| On February 3rd, 2011 I conducted a routine inspection of the above site.  Drilling was completed.  Frac tanks had been placed onsite.  A site ID sign and E&S plan were posted at the site.  The access road was in good condition.  All E&S controls were in place and constructed according to the plan at site.  The pit appeared to be in good condition and displayed adequate freeboard.  No spills, leaks, or accelerated erosion were observed at the time of inspection.
|
 
|-
 
 
|-
 
|-
 
| 1958776
 
| 1958776
 +
| Primary Facility
 
| 2011-02-17
 
| 2011-02-17
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On February 17th, 2011 I conducted a routine inspection of the above site.  Drilling and frac were completed.  A site ID sign and E&S plan were posted at the site.  The access road was in good condition.  All E&S controls were in place and constructed according to the plan at site.  The pit appeared to be in good condition and displayed adequate freeboard.  No spills, leaks, or accelerated erosion were observed at the time of inspection.  The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
 
| On February 17th, 2011 I conducted a routine inspection of the above site.  Drilling and frac were completed.  A site ID sign and E&S plan were posted at the site.  The access road was in good condition.  All E&S controls were in place and constructed according to the plan at site.  The pit appeared to be in good condition and displayed adequate freeboard.  No spills, leaks, or accelerated erosion were observed at the time of inspection.  The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
|
 
|-
 
 
|-
 
|-
 
| 1958889
 
| 1958889
 +
| Primary Facility
 
| 2011-02-24
 
| 2011-02-24
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On February 24th, 2011 I conducted a routine inspection of the above site.  Drilling and frac were completed.  A site ID sign and E&S plan were posted at the site.  The access road was in good condition and recently rocked.  All E&S controls were in place and constructed according to the plan at site.  The pits were closed and the site was being put back.  No spills, leaks, or accelerated erosion were observed at the time of inspection.  The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
 
| On February 24th, 2011 I conducted a routine inspection of the above site.  Drilling and frac were completed.  A site ID sign and E&S plan were posted at the site.  The access road was in good condition and recently rocked.  All E&S controls were in place and constructed according to the plan at site.  The pits were closed and the site was being put back.  No spills, leaks, or accelerated erosion were observed at the time of inspection.  The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
|
 
|-
 
 
|-
 
|-
 
| 1959472
 
| 1959472
 +
| Primary Facility
 
| 2011-03-02
 
| 2011-03-02
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| WELL IS COMPLETE AND SHUT IN.
 
| WELL IS COMPLETE AND SHUT IN.
SITE IS RESTORED BUT NOT SEEDED.
 
E&S CONTROLS ARE IN PLACE.
 
|
 
|-
 
 
|-
 
|-
 
| 1961869
 
| 1961869
 +
| Primary Facility
 
| 2011-03-18
 
| 2011-03-18
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On March 18th, 2011 I conducted a routine inspection of the above site.  Drilling and frac were completed and the well was now in production.  A site ID sign and E&S plan were posted at the site.  The access road was in good condition.  The landowner requested that the gate be replaced.  All E&S controls were in place and constructed according to the plan at site.  The pits were closed and the site was rough graded.  No spills, leaks, or accelerated erosion were observed at the time of inspection.  The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
 
| On March 18th, 2011 I conducted a routine inspection of the above site.  Drilling and frac were completed and the well was now in production.  A site ID sign and E&S plan were posted at the site.  The access road was in good condition.  The landowner requested that the gate be replaced.  All E&S controls were in place and constructed according to the plan at site.  The pits were closed and the site was rough graded.  No spills, leaks, or accelerated erosion were observed at the time of inspection.  The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
|
 
|-
 
 
|-
 
|-
 
| 1974613
 
| 1974613
 +
| Primary Facility
 
| 2011-04-27
 
| 2011-04-27
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| WELL IS PRODUCING. ANULUS IS OPEN.  
+
| WELL IS PRODUCING. ANULUS IS OPEN.
SITE CONTOURS ARE RESTORED BUT NOT SEEDED.
 
|
 
|-
 
 
|-
 
|-
 
| 1984930
 
| 1984930
 +
| Primary Facility
 
| 2011-06-02
 
| 2011-06-02
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On June 2nd, 2011 I conducted a routine inspection of the above site.  Drilling and frac were completed and the well was now in production.  A well tag was present.  A site ID sign and E&S plan were posted at the site.  The access road was in good condition.  All E&S controls were in place and constructed according to the plan at site.  The pits were closed and the site was rough graded.  No spills, leaks, or accelerated erosion were observed at the time of inspection.  The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
 
| On June 2nd, 2011 I conducted a routine inspection of the above site.  Drilling and frac were completed and the well was now in production.  A well tag was present.  A site ID sign and E&S plan were posted at the site.  The access road was in good condition.  All E&S controls were in place and constructed according to the plan at site.  The pits were closed and the site was rough graded.  No spills, leaks, or accelerated erosion were observed at the time of inspection.  The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
|  
+
|-
 +
| 2486150
 +
| Primary Facility
 +
| 2016-04-27
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| THIS IS A WELL MAINTAINED GAS WELL. THE TANK AND PRODUCTION EQUIPTMENT ARE IN GOOD CONDITION.
 +
THE ANULUS IS OPEN.
 +
|-
 +
| 2790343
 +
| Primary Facility
 +
| 2018-10-17
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well drilled and equipped for production. Well tag present. Well apparatus and brine tank appear to be in sound condition. No accelerated erosion or sedimentation observed on well site or access road.
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 13:38, 20 May 2020

Well Details

Well ID: 37-003-22153
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Plum Borough
Operator Name: DAKOTA OIL & GAS CO
Well Pad ID:
Farm/Lease Name: OBLOCK 1
License Status:
Spud Date:
Permit Date: 2010-12-14
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.477817
Longitude: -79.731653

For data sources see[1][2][3]

Well History

Date Event
2010-12-14 New Permit Application
2011-01-18 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 PENNECO OIL CO INC 0.00 0 0.00 0 0.00 0
2011 PENNECO OIL CO INC 3,270.00 275 0.00 0 0.00 0
2012 PENNECO OIL CO INC 3,673.00 366 0.00 0 0.00 0
2013 PENNECO OIL CO INC 2,357.00 365 0.00 0 0.00 0
2014 PENNECO OIL CO INC 1,461.00 365 0.00 0 0.00 0
2015 DAKOTA OIL & GAS CO 1,434.66 365 0.00 0 0.00 0
2016 DAKOTA OIL & GAS CO 866.28 274 0.00 0 0.00 0
2017 DAKOTA OIL & GAS CO 1,045.00 365 0.00 0 0.00 0
2018 DAKOTA OIL & GAS CO 960.92 365 0.00 0 0.00 0
2019 DAKOTA OIL & GAS CO 764.83 334 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 PENNECO OIL CO INC Fracing Fluid Waste 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 PENNECO OIL CO INC Fracing Fluid Waste 760.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011 PENNECO OIL CO INC Drilling Fluid Waste 107.14 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 PENNECO OIL CO INC Drilling Fluid Waste 1,510.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1952927 Primary Facility 2011-01-20 Routine/Complete Inspection No Violations Noted On January 20th, 2011 I conducted a routine inspection of the above site. Drilling was taking place at the time of the inspection. Cement trucks were on site. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pit was constructed and appeared to be in good condition. No spills, leaks, or accelerated erosion were observed at the time of inspection.
1953104 Primary Facility 2011-01-28 Routine/Complete Inspection No Violations Noted On January 28th, 2011 I conducted a routine inspection of the above site. Drilling was completed and the rig was moving off location. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pit appeared to be in good condition and displayed adequate freeboard. No spills, leaks, or accelerated erosion were observed at the time of inspection.
1953925 Primary Facility 2011-01-18 Drilling/Alteration No Violations Noted THE SITE IS BUILT. E&S, AND ACCESS OK. THE PIT IS LINED. THERE IS NO EQUIPTMENT ON THE SITE.
1956826 Primary Facility 2011-01-24 Drilling/Alteration No Violations Noted USE RIG #4 DRILLING @ 1710'.
1956844 Primary Facility 2011-01-26 Drilling/Alteration No Violations Noted USE RIG#4 BEGINNING TO DRILL AFTER 7" CEMENT TIME.
1956849 Primary Facility 2011-01-31 Drilling/Alteration No Violations Noted DRILLING COMPLETE. 4.5" CASING IS IN.
1957392 Primary Facility 2011-02-08 Drilling/Alteration No Violations Noted DRILLING COMPLETE.
1957813 Primary Facility 2011-02-03 Routine/Complete Inspection No Violations Noted On February 3rd, 2011 I conducted a routine inspection of the above site. Drilling was completed. Frac tanks had been placed onsite. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pit appeared to be in good condition and displayed adequate freeboard. No spills, leaks, or accelerated erosion were observed at the time of inspection.
1958776 Primary Facility 2011-02-17 Routine/Complete Inspection No Violations Noted On February 17th, 2011 I conducted a routine inspection of the above site. Drilling and frac were completed. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pit appeared to be in good condition and displayed adequate freeboard. No spills, leaks, or accelerated erosion were observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
1958889 Primary Facility 2011-02-24 Routine/Complete Inspection No Violations Noted On February 24th, 2011 I conducted a routine inspection of the above site. Drilling and frac were completed. A site ID sign and E&S plan were posted at the site. The access road was in good condition and recently rocked. All E&S controls were in place and constructed according to the plan at site. The pits were closed and the site was being put back. No spills, leaks, or accelerated erosion were observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
1959472 Primary Facility 2011-03-02 Drilling/Alteration No Violations Noted WELL IS COMPLETE AND SHUT IN.
1961869 Primary Facility 2011-03-18 Routine/Complete Inspection No Violations Noted On March 18th, 2011 I conducted a routine inspection of the above site. Drilling and frac were completed and the well was now in production. A site ID sign and E&S plan were posted at the site. The access road was in good condition. The landowner requested that the gate be replaced. All E&S controls were in place and constructed according to the plan at site. The pits were closed and the site was rough graded. No spills, leaks, or accelerated erosion were observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
1974613 Primary Facility 2011-04-27 Drilling/Alteration No Violations Noted WELL IS PRODUCING. ANULUS IS OPEN.
1984930 Primary Facility 2011-06-02 Routine/Complete Inspection No Violations Noted On June 2nd, 2011 I conducted a routine inspection of the above site. Drilling and frac were completed and the well was now in production. A well tag was present. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pits were closed and the site was rough graded. No spills, leaks, or accelerated erosion were observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
2486150 Primary Facility 2016-04-27 Routine/Complete Inspection No Violations Noted THIS IS A WELL MAINTAINED GAS WELL. THE TANK AND PRODUCTION EQUIPTMENT ARE IN GOOD CONDITION.

THE ANULUS IS OPEN.

2790343 Primary Facility 2018-10-17 Routine/Complete Inspection No Violations Noted Well drilled and equipped for production. Well tag present. Well apparatus and brine tank appear to be in sound condition. No accelerated erosion or sedimentation observed on well site or access road.

For data sources see[7]

References