37-003-22153

Well Details

Well ID: 37-003-22153
Loading map...
Operator Name: PENNECO OIL CO INC
First Permit Date: 2010-12-14
Last Permit Date: 2010-12-14
Spud Date: 2011-01-18
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.477816
Longitude: -79.731652

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 2357.0 365.0 0.0 0.0 0.0 0.0
2012-0 3673.0 366.0 0.0 0.0 0.0 0.0
2011-0 3270.0 275.0 0.0 0.0 0.0 0.0
2010-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2011-0 DRILLING FLUID WASTE 107.14 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO FRANKLIN PA
2011-0 FRACING FLUID WASTE 100.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO FRANKLIN PA
2011-0 DRILLING FLUID WASTE 1510.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS COMPANY SALTSBURG PA
2011-0 FRACING FLUID WASTE 760.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS COMPANY SALTSBURG PA

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1952927 2011-01-20 No Violations Noted On January 20th, 2011 I conducted a routine inspection of the above site. Drilling was taking place at the time of the inspection. Cement trucks were on site. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pit was constructed and appeared to be in good condition. No spills, leaks, or accelerated erosion were observed at the time of inspection.
1953104 2011-01-28 No Violations Noted On January 28th, 2011 I conducted a routine inspection of the above site. Drilling was completed and the rig was moving off location. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pit appeared to be in good condition and displayed adequate freeboard. No spills, leaks, or accelerated erosion were observed at the time of inspection.
1953925 2011-01-18 No Violations Noted THE SITE IS BUILT. E&S, AND ACCESS OK. THE PIT IS LINED. THERE IS NO EQUIPTMENT ON THE SITE.
1956826 2011-01-24 No Violations Noted USE RIG #4 DRILLING @ 1710'.

SITE, PIT, E&S, AND ACCESS, OK.

1956844 2011-01-26 No Violations Noted USE RIG#4 BEGINNING TO DRILL AFTER 7" CEMENT TIME.

SITE, PIT, E&S, AND ACCESS, OK.

1956849 2011-01-31 No Violations Noted DRILLING COMPLETE. 4.5" CASING IS IN.

THE RIG IS GONE ALTHOUGH SOME EQUIPTMENT REMAINS ON THE PAD. SITE, PIT, E&S, AND ACCESS, OK.

1957392 2011-02-08 No Violations Noted DRILLING COMPLETE.

WELL IS BEING FRACED BY APPALACHIAN SERVICES. SITE, PIT, E&S, AND ACCESS, OK.

1957813 2011-02-03 No Violations Noted On February 3rd, 2011 I conducted a routine inspection of the above site. Drilling was completed. Frac tanks had been placed onsite. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pit appeared to be in good condition and displayed adequate freeboard. No spills, leaks, or accelerated erosion were observed at the time of inspection.
1958776 2011-02-17 No Violations Noted On February 17th, 2011 I conducted a routine inspection of the above site. Drilling and frac were completed. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pit appeared to be in good condition and displayed adequate freeboard. No spills, leaks, or accelerated erosion were observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
1958889 2011-02-24 No Violations Noted On February 24th, 2011 I conducted a routine inspection of the above site. Drilling and frac were completed. A site ID sign and E&S plan were posted at the site. The access road was in good condition and recently rocked. All E&S controls were in place and constructed according to the plan at site. The pits were closed and the site was being put back. No spills, leaks, or accelerated erosion were observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
1959472 2011-03-02 No Violations Noted WELL IS COMPLETE AND SHUT IN.

SITE IS RESTORED BUT NOT SEEDED. E&S CONTROLS ARE IN PLACE.

1961869 2011-03-18 No Violations Noted On March 18th, 2011 I conducted a routine inspection of the above site. Drilling and frac were completed and the well was now in production. A site ID sign and E&S plan were posted at the site. The access road was in good condition. The landowner requested that the gate be replaced. All E&S controls were in place and constructed according to the plan at site. The pits were closed and the site was rough graded. No spills, leaks, or accelerated erosion were observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
1974613 2011-04-27 No Violations Noted WELL IS PRODUCING. ANULUS IS OPEN.

SITE CONTOURS ARE RESTORED BUT NOT SEEDED.

1984930 2011-06-02 No Violations Noted On June 2nd, 2011 I conducted a routine inspection of the above site. Drilling and frac were completed and the well was now in production. A well tag was present. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pits were closed and the site was rough graded. No spills, leaks, or accelerated erosion were observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.