{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.567741,"lon":-79.838894,"icon":""}]} |
Operator Name: MARCO DRILLING INC | |
First Permit Date: 2011-11-18 | |
Last Permit Date: 2011-11-18 | |
Spud Date: 2011-12-13 | |
Unconventional: No | |
Horizontal: No | |
Violations: 1 | |
Latitude: 40.567741 | |
Longitude: -79.838894 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-0 | 114.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-0 | 505.0 | 245.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-0 | FLOWBACK FRACTURING SAND | 1100.0 | Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE | CREEKSIDE | PA |
2012-0 | PRODUCED FLUID | 60.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |
2012-0 | FLOWBACK FRACTURING SAND | 1100.0 | Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE | CREEKSIDE | PA |
2012-0 | PRODUCED FLUID | 60.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
2027911 | 2011-12-14 | No Violations Noted | CLEANING HOLE AT 40' TO SET 133/8" CONDUCTOR.
SITE PIT, E&S, AND ACCESS, OK. SITE, |
|
2028417 | 2011-12-15 | Violation(s) Noted | Drilling operations were already underway. My inspection also found that the closest edge of the disturbed area was 27 yard (¿ 90 feet) from an UNT to Little deer Creek. Since they did not yet have the distance waiver,this is a violation of the Oil & Gas Act.
Additionally, some of the E&S controls were not installed (there was no mulch on a cut bank upslope from the site) and others were not adequate (silt laden run-off could be seen going around some of the hay bales and reaching the stream). These are violations of the Department¿s Rules and Regulations. |
627436 |
2028417 | 2011-12-15 | Violation(s) Noted | Drilling operations were already underway. My inspection also found that the closest edge of the disturbed area was 27 yard (¿ 90 feet) from an UNT to Little deer Creek. Since they did not yet have the distance waiver,this is a violation of the Oil & Gas Act.
Additionally, some of the E&S controls were not installed (there was no mulch on a cut bank upslope from the site) and others were not adequate (silt laden run-off could be seen going around some of the hay bales and reaching the stream). These are violations of the Department¿s Rules and Regulations. |
627436 |
2035171 | 2012-01-10 | No Violations Noted | DRILLING COMPLETE. SITE IS CLEAN AND COVERD WITH STRAW. | |
2036434 | 2012-01-17 | No Violations Noted | On January 17, 2012, I stopped at the Josephine Tuche #4 site to recheck the E&S measures; no one else was on-site.
All the bare areas were mulched with hay and the BMPs were installed. Although it was raining the controls seemed to be doing a good job at controlling sediment. Some of the excavations were new and the soil was shifting but not yet a violation. New problems should be caught by the required inspections. |
|
2055037 | 2012-03-29 | No Violations Noted | JACK IS SET WITH TEMPORARY HOOK-UPS TO STORAGE TANK. PIT IS BEING DRAINED. | |
2067393 | 2012-05-01 | No Violations Noted | THIS WELL IS COMPLETED. JACK AND TANKS ARE SET.
THE SITE IS RESTORED |
|
2097464 | 2012-08-31 | No Violations Noted | WELL IS HOOKED UP AND PRODUCING. THE SITE HAS BEEN RESTORED |