X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-01061"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-005-01061
 
| Well ID: 37-005-01061
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.970652, -79.252350 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.970652, -79.252350 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Plugged OG Well
 
| License Status: Plugged OG Well
 
|-
 
|-
| Spud Date: 1/1/1800
+
| Spud Date: 1800-01-01
 
|-
 
|-
 
| Permit Date:  
 
| Permit Date:  
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 88:
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1996
 
| 1996
Line 74: Line 99:
 
| style="text-align: right;" | 93
 
| style="text-align: right;" | 93
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1997
 
| 1997
Line 83: Line 108:
 
| style="text-align: right;" | 345
 
| style="text-align: right;" | 345
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1998
 
| 1998
Line 92: Line 117:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999
 
| 1999
Line 101: Line 126:
 
| style="text-align: right;" | 379
 
| style="text-align: right;" | 379
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000
 
| 2000
Line 110: Line 135:
 
| style="text-align: right;" | 342
 
| style="text-align: right;" | 342
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001
 
| 2001
Line 119: Line 144:
 
| style="text-align: right;" | 211
 
| style="text-align: right;" | 211
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002
 
| 2002
Line 128: Line 153:
 
| style="text-align: right;" | 332
 
| style="text-align: right;" | 332
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003
 
| 2003
Line 137: Line 162:
 
| style="text-align: right;" | 321
 
| style="text-align: right;" | 321
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004
 
| 2004
Line 146: Line 171:
 
| style="text-align: right;" | 347
 
| style="text-align: right;" | 347
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005
 
| 2005
Line 155: Line 180:
 
| style="text-align: right;" | 347
 
| style="text-align: right;" | 347
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006
 
| 2006
| style="text-align: right;" |
+
| [[BLX INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007
 
| 2007
| style="text-align: right;" |
+
| [[BLX INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
Line 182: Line 207:
 
| style="text-align: right;" | 328
 
| style="text-align: right;" | 328
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
Line 191: Line 216:
 
| style="text-align: right;" | 350
 
| style="text-align: right;" | 350
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 200: Line 225:
 
| style="text-align: right;" | 296
 
| style="text-align: right;" | 296
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 209: Line 234:
 
| style="text-align: right;" | 332
 
| style="text-align: right;" | 332
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 223: Line 248:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 242: Line 268:
 
| 1764792
 
| 1764792
 
| Primary Facility
 
| Primary Facility
| 01/25/2009
+
| 2009-01-25
 
| Site Restoration
 
| Site Restoration
 
| No Violations Noted
 
| No Violations Noted
Line 263: Line 289:
 
| 218288
 
| 218288
 
| Primary Facility
 
| Primary Facility
| 10/22/1996
+
| 1996-10-22
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 270: Line 296:
 
| 218341
 
| 218341
 
| Primary Facility
 
| Primary Facility
| 12/11/1996
+
| 1996-12-11
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 289: Line 315:
 
| 108170
 
| 108170
 
| 10/22/1996
 
| 10/22/1996
| 12/11/1996
+
| 1996-10-22
 
| 210A - Failure to adequately plug or schedule plugging of a well upon abandonment
 
| 210A - Failure to adequately plug or schedule plugging of a well upon abandonment
 
| Administrative
 
| Administrative
Line 297: Line 323:
 
| 108171
 
| 108171
 
| 10/22/1996
 
| 10/22/1996
| 12/11/1996
+
| 1996-10-22
 
| 212301 - Failure to file annual production report on each well or gas storage maps & information
 
| 212301 - Failure to file annual production report on each well or gas storage maps & information
 
| Administrative
 
| Administrative
Line 319: Line 345:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 12/11/1996
+
| 1996-12-11
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 328: Line 354:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 12/11/1996
+
| 1996-12-11
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 339: Line 365:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 10:45, 19 August 2019

Well Details

Well ID: 37-005-01061
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Redbank Township
Operator Name: REDMILL DRILLING
Well Pad ID:
Farm/Lease Name: C E SMITH 100A 1
License Status: Plugged OG Well
Spud Date: 1800-01-01
Permit Date:
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.970652
Longitude: -79.252350

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1991 0.00 0 0.00 0 0.00 0
1996 BLX INC 457.30 93 0.00 0 0.00 0
1997 BLX INC 945.10 345 0.00 0 0.00 0
1998 BLX INC 3,363.00 365 0.00 0 0.00 0
1999 BLX INC 3,305.78 379 0.00 0 0.00 0
2000 BLX INC 2,324.40 342 0.00 0 0.00 0
2001 BLX INC 1,812.50 211 0.00 0 0.00 0
2002 BLX INC 2,900.04 332 0.00 0 0.00 0
2003 BLX INC 2,196.05 321 0.00 0 0.00 0
2004 BLX INC 2,398.79 347 0.00 0 0.00 0
2005 BLX INC 2,077.75 347 0.00 0 0.00 0
2006 BLX INC 0.00 0 0.00 0 0.00 0
2007 BLX INC 0.00 0 0.00 0 0.00 0
2008 BLX INC 967.50 328 0.00 0 0.00 0
2009 BLX INC 1,085.80 350 0.00 0 0.00 0
2010 BLX INC 518.39 296 0.00 0 0.00 0
2011 BLX INC 632.78 332 0.00 0 0.00 0

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1764792 Primary Facility 2009-01-25 Site Restoration No Violations Noted Well plugging was completed on 02/15/08. Site inspection found a monument onsite with the appropriate permit number and well name. In addition the site had been properly restored. There was no accelerated erosion & sedimentation noted on the site or the access road.
215855 Primary Facility 1994-04-05 Routine/Complete Inspection No Violations Noted E&S OK; SMALL LEAK
215943 Primary Facility 1994-05-19 Routine/Complete Inspection No Violations Noted LEAK REPAIRED; E&S OK
218288 Primary Facility 1996-10-22 Routine/Complete Inspection Violation(s) Noted FAIL TO PLUG/ABAND/NO PROD RPT
218341 Primary Facility 1996-12-11 Routine/Complete Inspection No Violations Noted OPERATING; ALL OK

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
218288 108170 10/22/1996 1996-10-22 210A - Failure to adequately plug or schedule plugging of a well upon abandonment Administrative ABANDONED & UNPLUGGE
218288 108171 10/22/1996 1996-10-22 212301 - Failure to file annual production report on each well or gas storage maps & information Administrative OVERDUE PRODUCTION R

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
108170 8759 NOV - Notice of Violation Comply/Closed 1996-12-11
108171 8759 NOV - Notice of Violation Comply/Closed 1996-12-11

For data sources see[5]

References