X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-22358"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-005-22358
 
| Well ID: 37-005-22358
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.947641, -79.267114 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.947641, -79.267114 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: FLORA E NEAL 1
 
| Farm/Lease Name: FLORA E NEAL 1
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 10/29/1979
+
| Spud Date:  
 
|-
 
|-
| Permit Date: 7/31/1979
+
| Permit Date: 1979-07-31
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.947641
 
| Latitude: 40.947641
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1979-07-31
 +
| New Permit Application
 +
|-
 +
| 1979-10-29
 +
| Performed Spud Operation
 +
|-
 +
| 1979-11-09
 +
| Drilling Completion
 +
|-
 +
| 1979-11-09
 +
| Perforation
 +
|-
 +
| 1979-12-24
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 61: Line 127:
 
|-
 
|-
 
| 1986
 
| 1986
| [[ADOBE RESOURCES CORP]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 1,049.00
 
| style="text-align: right;" | 1,049.00
 
| style="text-align: right;" | 105
 
| style="text-align: right;" | 105
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1987
 
| 1987
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1988
 
| 1988
| [[ADOBE RESOURCES CORP]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 3,424.00
 
| style="text-align: right;" | 3,424.00
 
| style="text-align: right;" | 362
 
| style="text-align: right;" | 362
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1989
 
| 1989
| [[ADOBE RESOURCES CORP]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 1,782.00
 
| style="text-align: right;" | 1,782.00
 
| style="text-align: right;" | 358
 
| style="text-align: right;" | 358
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1991
 
| 1991
| [[ADOBE RESOURCES CORP]]
+
| style="text-align: right;" |
| style="text-align: right;" | 1,827.00
+
| style="text-align: right;" | 1827.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1996
 
| 1996
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 1,272.00
+
| style="text-align: right;" | 1272
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1997
 
| 1997
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 1,162.00
+
| style="text-align: right;" | 1162
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1998
 
| 1998
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 1,035.00
+
| style="text-align: right;" | 1035
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999
 
| 1999
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 1,091.00
+
| style="text-align: right;" | 1091
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000
 
| 2000
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 970.00
+
| style="text-align: right;" | 970
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001
 
| 2001
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 866.00
+
| style="text-align: right;" | 866
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002
 
| 2002
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 804.00
+
| style="text-align: right;" | 804
 
| style="text-align: right;" | 344
 
| style="text-align: right;" | 344
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003
 
| 2003
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 753.00
+
| style="text-align: right;" | 753
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004
 
| 2004
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 808.00
+
| style="text-align: right;" | 808
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005
 
| 2005
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 740.00
+
| style="text-align: right;" | 740
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006
 
| 2006
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
 
| style="text-align: right;" | 612.00
 
| style="text-align: right;" | 612.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007
 
| 2007
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
 
| style="text-align: right;" | 857.00
 
| style="text-align: right;" | 857.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
 
| style="text-align: right;" | 670.00
 
| style="text-align: right;" | 670.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
 
| style="text-align: right;" | 810.00
 
| style="text-align: right;" | 810.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 236: Line 302:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 245: Line 311:
 
| style="text-align: right;" | 324
 
| style="text-align: right;" | 324
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 254: Line 320:
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 263: Line 329:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 272: Line 338:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 281: Line 347:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 290: Line 356:
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 299: Line 365:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 308: Line 374:
 
| style="text-align: right;" | 352
 
| style="text-align: right;" | 352
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[GREYLOCK CONVENTIONAL LLC]]
 +
| style="text-align: right;" | 525.00
 +
| style="text-align: right;" | 352
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 322: Line 397:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 327: Line 403:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 1997-0
+
| 1997
 +
| [[ENERGY CORP OF AMER]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 30.00 Bbl
 
| style="text-align: right;" | 30.00 Bbl
Line 333: Line 410:
 
| 005-21675
 
| 005-21675
 
|-
 
|-
| 2016-0
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[ENERGY CORP OF AMER]]
 +
| Produced Fluid
 
| style="text-align: right;" | 1.00 Bbl
 
| style="text-align: right;" | 1.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0101508
 +
|-
 +
| 2016
 +
| [[ENERGY CORP OF AMER]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1 Bbl
 +
| CENT WASTE TRT FAC NPDES
 
| PA0101508
 
| PA0101508
 
|-
 
|-
Line 378: Line 463:
 
!scope="col" | Penalty Amount
 
!scope="col" | Penalty Amount
 
!scope="col" | Amount Collected
 
!scope="col" | Amount Collected
|-
 
|}-->
 
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
 
|-
 
|-
 
|}-->
 
|}-->

Latest revision as of 21:27, 20 May 2020

Well Details

Well ID: 37-005-22358
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Redbank Township
Operator Name: GREYLOCK CONVENTIONAL LLC
Well Pad ID:
Farm/Lease Name: FLORA E NEAL 1
License Status: ACTIVE
Spud Date:
Permit Date: 1979-07-31
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.947641
Longitude: -79.267114

For data sources see[1][2][3]

Well History

Date Event
1979-07-31 New Permit Application
1979-10-29 Performed Spud Operation
1979-11-09 Drilling Completion
1979-11-09 Perforation
1979-12-24 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1986 1,049.00 105 0.00 0 0.00 0
1987 0.00 0 0.00 0 0.00 0
1988 3,424.00 362 0.00 0 0.00 0
1989 1,782.00 358 0.00 0 0.00 0
1991 1827.00 365 0.00 0 0.00 0
1996 ENERGY CORP OF AMER 1272 365 0.00 0 0.00 0
1997 ENERGY CORP OF AMER 1162 365 0.00 0 0.00 0
1998 ENERGY CORP OF AMER 1035 365 0.00 0 0.00 0
1999 ENERGY CORP OF AMER 1091 365 0.00 0 0.00 0
2000 ENERGY CORP OF AMER 970 366 0.00 0 0.00 0
2001 ENERGY CORP OF AMER 866 365 0.00 0 0.00 0
2002 ENERGY CORP OF AMER 804 344 0.00 0 0.00 0
2003 ENERGY CORP OF AMER 753 365 0.00 0 0.00 0
2004 ENERGY CORP OF AMER 808 366 0.00 0 0.00 0
2005 ENERGY CORP OF AMER 740 365 0.00 0 0.00 0
2006 ENERGY CORP OF AMER 612.00 365 0.00 0 0.00 0
2007 ENERGY CORP OF AMER 857.00 365 0.00 0 0.00 0
2008 ENERGY CORP OF AMER 670.00 365 0.00 0 0.00 0
2009 ENERGY CORP OF AMER 810.00 365 0.00 0 0.00 0
2010 ENERGY CORP OF AMER 660.00 365 0.00 0 0.00 0
2011 ENERGY CORP OF AMER 717.00 324 0.00 0 0.00 0
2012 ENERGY CORP OF AMER 746.00 366 0.00 0 0.00 0
2013 ENERGY CORP OF AMER 729.00 365 0.00 0 0.00 0
2014 ENERGY CORP OF AMER 703.00 365 0.00 0 0.00 0
2015 ENERGY CORP OF AMER 678.00 365 0.00 0 0.00 0
2016 ENERGY CORP OF AMER 631.00 366 0.00 0 0.00 0
2017 GREYLOCK CONVENTIONAL LLC 592.00 365 0.00 0 0.00 0
2018 GREYLOCK CONVENTIONAL LLC 584.00 352 0.00 0 0.00 0
2019 GREYLOCK CONVENTIONAL LLC 525.00 352 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
1997 ENERGY CORP OF AMER Brine 30.00 Bbl Injection Disposal Well 005-21675
2016 ENERGY CORP OF AMER Produced Fluid 1.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016 ENERGY CORP OF AMER Produced Fluid 1 Bbl CENT WASTE TRT FAC NPDES PA0101508

For data sources see[6]

References